MCE2035: User manual
Version: 2011-05-17, rev.: 0a
Page: 4
3) MCE2010 DESCRIPTION
Below the layout of the MCE2010 load cell module is shown. Before using the system the
load cells must be connected to the load cell modules.
Please notice that the load cell and the load cell module MUST be marked
with the same year/serial number. These are printed on the type-plate of the
load cell and on a small sticker placed below the BNC plug on the load cell
module. Load cells and load cell modules MUST NOT be intermixed because
the program in each load cell module is SPECIALLY adapted to one load
cell only (and only this load cell). The load cell module MUST be connected
to exactly the load cell it is intended for and vice versa.
Flat cable connector
10 contacts
BNC connector
for loadcell
TXBB
D1
SYNC
ERR
MCE2010
Eilersen Electric
SW
1
1
8
ON
The load cell modules are connected to each other using the supplied cable (10 pole ribbon
cable). The MCE9601 terminal module (the one with connection terminals) and the
MCE2035 Profibus-DP module are connected using the same cable.