1.4.
Hardware installation
F
IGURE
1:
T
OP VIEW OF PRODUCT
1.5.
•
Important:
Mount the module vertically to a wall in a well-
ventilated room and leave a minimum space of 15 cm around
the product to guarantee a maximum ventilation of the product
Mounting the Pro ler Revolution
•
Connect an earth wire to the grounding clamp
•
Connect the power adapter cord to the power supply socket.
Check the status LED for the indication of DC power presence
•
Connect the VHF/UHF and/or FM inputs to the Pro ler
Revolution
•
Connect a coaxial cable to the output connector for distribution of the signal
•
Connect a network analyser to the test port to control the signal quality
•
Con gure the Pro ler Revolution using the rotary button, see below
•
Optionally: insert an SD card in the SD card slot to upload the con gurations of a previous module or to copy
the con guration to another module
•
The power adapter can easily be replaced without disconnecting the product. To do so, open the top left
plastic cover by pushing the click at the opposite side of the mains connector
▼
▼
▼
▼
▼
▼
▼
▼
▼
FM
V/U1
V/U2
V/U3
V/U4
CENTURY CC1
Programmable Channel Converter
▼
12-24 VDC
100-240V~
50-60Hz / 15W
▼
OUT
(MAX 118dBµV)
TEST
(-30dB)
SD
User Manual
5 input: 4 VHF/UHF and 1 FM
Grounding clamp
Use the knob to navigate through
the menu
Test port to control the output signal quality
Output signal
Status LED
Power supply socket
16.5cm
21.7cm
P.4
Содержание CENTURY CC1
Страница 12: ...P 12...
Страница 14: ......