background image

 

 

 

 

16 

 

Green indicator: The left indicator indicates normal operation. 

Blue indicators (SOC):  In normal operation, the four indicators on the right show the module’s state of charge (SOC). 
Each indicator represents 25% of a full charge. If the SOC value is 50%, the three rightmost indicators are on solid 

BLUE

. The blue indicators of the slave modules look as below. 

 

Whereas, the leftmost blue indicator on the master module flashes. 

 
Also, verify that the module with the left-most flashing blue SOC indicator corresponds to the module which has 
communication wired from the BMS to the PCS [BMS in] port.   
 

CAUTION! If any battery module other than the master has a flashing SOC light at startup, shut down all 
battery modules by holding the [Power] button for 5 seconds.  In this state, it may be necessary to shut down 

battery modules individually. After all modules are OFF, repeat step 2. 
 

3.

 

Turn ON the Battery disconnect switch inside the battery cabinet.  

 

IMPORTANT!  The DC breaker is not intended for use as an external service disconnect.  It is intended only 
for authorized  service personnel as part of the startup sequence and/or equipment service only. Overload 

protection is provided by the fuses within the battery modules. 
 
The PCS  module will initialize, indicated by a brief flash of all LEDs on the 
display panel, followed by a status of the battery and PCS.  Refer to table in 
section 12.2 for definitions of the indicator status of the PCS. 
 

4.

 

Turn ON the AC breaker at the main electrical panel to the PCS. 

10.1 Shutdown Sequence 

 

1.

 

 Press and hold the service button for 10 seconds. 
All lights on the panel will flash rapidly.   
 

2.

 

Shut off the BESS AC grid disconnect.   

3.

 

Wait 20 minutes for the BESS to de-energize.  Shut down is complete when all panel lights are OFF. 
Service personnel only!  Alternate to step 3 above: remove the front cover of the battery, and press and 
hold the power button on the master battery for 5 seconds to de-energize the battery modules. Confirm 
all module panel lights are OFF. 

11  Operation

 

 

 

The Evolve home energy storage system will remain in a sleep standby mode (not grid connected) until 
the energy management system (EMS) / gateway is fully commissioned.  Refer to the Evolve ESS - AU 
Commissioning Guide for setup instructions using the Stormcloud by SwitchDin monitoring app.  Ensure 

the regional settings of the PCS match the installation region prior to commissioning the EMS / gateway.   

11.1 Updating the PCS factory regional settings 

 
The PCS within the BESS  is factory configured for Australia –Region A.  For installations in any other region, the 
PCS settings file must be updated accordingly using a separate software application.  Contact support at Eguana 
Technologies Pty to obtain the ECI software. Refer to the Eguana ECI manual for further instructions.  PCS 
settings are not available in the EMS monitoring app. 

 

EMS 

Figure 14: Battery breaker 
disconnect turn ON.

 

Содержание Evolve ESS AU 13

Страница 1: ...lve ESS AU 13 kWh Evolve ESS AU 26 kWh Evolve ESS AU 39 kWh Grid Support Utility Interactive Inverter Integrated Lithium Battery For use only with battery model LG Chem EM048126P3S7 Installation Start...

Страница 2: ...Revision History Revision Date Status Author Comments 1 0 05 Oct 2022 Released RWM Initial release...

Страница 3: ...AC Grid output circuit CAUTION This equipment contains high energy lithium batteries Qualified and trained personnel should wear protective clothing and equipment when working inside the battery cabin...

Страница 4: ...ATTERY BMS TO PCS COMMUNICATION CONNECTION 11 6 SYSTEM ELECTRICAL WIRING 11 6 1 AC POWER CONNECTIONS 12 6 2 CHASSIS GROUNDING 13 7 ENERGY METER INSTALLATION 13 7 1 ELECTRICAL CONNECTIONS VOLTAGE MEASU...

Страница 5: ...THERMAL PERFORMANCE CHARGE DISCHARGE CURVES 22 APPENDIX A ELECTRICAL BLOCK DIAGRAM OF INTER CABINET WIRING 23 APPENDIX B ENERGY METER WIRING DIAGRAMS 24 B 1 ACCU ENERGY ACUREV 1310 24 B 1 2 A Main el...

Страница 6: ...he fire department or other required emergency response team Evacuate the area and if applicable follow your emergency evacuation plan if others are in proximity to the installed location In case of f...

Страница 7: ...ration and hazards Only connect this product to a compatible electrical service as defined in the model specifications This product must be connected to a dedicated branch circuit in the main electric...

Страница 8: ...either via CT monitoring or via compatible communication protocols with a select list of PV inverter models Consult Eguana Technologies for the most recent list of PV inverters with direct communicati...

Страница 9: ...J 45 crimp tool EMS to PCS communication cable and RJ 45 connectors M8 mounting hardware for wall bracket load bearing 2 5 Inverter DSP Firmware Version The Inverter DSP firmware version is displayed...

Страница 10: ...Refer to the environmental ratings in section 16 2 of this manual CAUTION Do not install in direct sunlight Battery performance is dependent upon operating ambient temperature Radiant heat absorbed i...

Страница 11: ...is connected to the backup circuit 2 The example above is shown with the energy meter relocated from the PCS to the main electrical panel For installations where the energy meter is located within the...

Страница 12: ...urces Overcurrent protection devices RCD Type A 300 mA are sufficient for protection of both AC Grid and AC load ports 7 Total AC nameplate of PV not to exceed 5 kW String inverter shown for simplicit...

Страница 13: ...g nut are mounted from inside the cabinet 4 Mount the leveling bracket to the cabinet CAUTION Battery cabinet is heavy Mechanical lift recommended 5 Lift the battery cabinet onto the wall mount bracke...

Страница 14: ...left until mating to the gasket 14 Place the coupling plate inside the PCS cabinet and insert the four mounting bolts and washers through to the battery cabinet side 15 Place star washers on the bolts...

Страница 15: ...rque can result in an arc fault hazard and risk of fire Damage as a result of improper termination is not covered by the manufacturer warranty 1 Remove the plastic safety barrier on the power panel as...

Страница 16: ...hotovoltaic inverter Wiring methods must be in accordance with local electrical codes The installer is responsible for ensuring that over current protection is installed and sized appropriately for th...

Страница 17: ...ranch circuit over current protection in accordance with local electrical codes WARNING Improper connection of the wiring panel may result in equipment damage and cause personal injury Disconnect all...

Страница 18: ...vered in this guide is generic to the approved list of integrated energy meters that are supported by the home storage system at the time of your purchase Refer to the energy meter manufacturer s inst...

Страница 19: ...ded for reliable communication access to the system The Ethernet wiring from the battery system must be connected to a customer supplied router A permanent Ethernet connection to the battery system re...

Страница 20: ...on 1 Remove the front cover from the battery cabinet adjacent to the PCS cabinet 2 Press the Power button see above label 8 on the master battery module The master battery module has communication wir...

Страница 21: ...and PCS Refer to table in section 12 2 for definitions of the indicator status of the PCS 4 Turn ON the AC breaker at the main electrical panel to the PCS 10 1 Shutdown Sequence 1 Press and hold the s...

Страница 22: ...to normal operation using the service button Note It is recommended to login to the EMS via web browser and retrieve the service code from the system prior to attempting to clear the service mode Refe...

Страница 23: ...xtension cords connected to a backup circuit should be limited to 10 meters IMPORTANT This product does not support automatic gas generator integration Do not attempt to connect a gas generator to the...

Страница 24: ...rials to clean the unit Never remove or unplug connections or plugs during cleaning 14 Troubleshooting System faults are reported and logged in the monitoring system All fault logs are also accessible...

Страница 25: ...e anti islanding method Sandia frequency shift Protective Class I II or III Class I Over Voltage Category OVC I II III or IV OVC III Inverter topology type Isolated Electrical data DC Nominal DC Volta...

Страница 26: ...les 103 kg Installation type Wall mount upright Environmental data Ingress protection rating IP34 Pollution Degree 3 Cooling method Natural convection Ambient temperature relative humidity altitude 10...

Страница 27: ...ing AC Power Derating Full Range Derated 15 to 45 C 10 C 10 C 50 C 0 1000 2000 3000 4000 5000 6000 0 10 20 30 40 50 60 70 80 90 100 AC POWER VA SOC Evolve ESS AU Discharging AC Power Derating Full Ran...

Страница 28: ...ery to PCS BMS CAN port A2 801003533 BMS cable short Interconnects modules within same cabinet A3 801003247 BMS cable long Interconnects modules between cabinets A4 Battery power cables Positive negat...

Страница 29: ...S 485 Communication to the EMS B 1 2 A Main electrical panel meter CT and power wiring B 1 2 B PV meter CT and power wiring ESS ESS Home loads L1 L2 L3 L1 L2 L3 Figure 18 EMS to Acurev 1310 energy met...

Страница 30: ...25 B 2 Eastron SDM630MCT 40mA RS 485 communication wiring CT wiring Voltage sense wiring EMS panel electrical block diagram...

Страница 31: ...INSTALLATION NOTES...

Страница 32: ...Eguana Technologies Inc Doc 68118 Rev1 2022...

Отзывы: