2  Introduction   

2.1 About this Manual – Target Audience 

 

This  manual  is  intended  to  be  used  by  qualified  service  and  installation  personnel  for  the  purposes  of  product  
installation.  This product is permanently wired to the home electrical service, and must be installed by a licensed 
electrician only.  This manual contains instructions for the installation and start up sequence of the Eguana Evolve™

 

home  energy  storage  system;  including  the  PCS  and  master  battery  cabinets,  the  energy  meter,  and  Ethernet 
connection to a customer supplied internet router.   

 
IMPORTANT! This manual makes frequent references to a utility interactive solar PV system as part of an 
AC coupled solar plus storage installation, which is independently supplied, installed, and operated from 

the  Eguana  Evolve  ESS.  It  is  the  responsibility  of  the  installer  to  ensure  that  any  utility  interactive  PV  system 
connected to a backup panel for micro-grid operation is compatible for use with a grid-forming battery inverter. 
 
The energy management system supplied with this product can monitor the AC power output of an independently 
installed utility interactive solar PV inverter to operate energy savings algorithms applicable to the local electrical 
utility; either via CT monitoring, or via compatible communication protocols with a select list of PV inverter models.   
Consult  Eguana  Technologies  for  the  most  recent  list  of  PV  inverters  with  direct  communication  to  the  energy 
management system. 
 
This product can supply limited backup power, and contains separate grid and load ports to isolate backup loads 
during a grid outage. When this product is not in service, backup loads are routed directly to the grid panel via the 
internal PCS bypass relay.  
 
The AC output of an independently installed utility interactive solar PV inverter can be wired to the backup panel 
to support solar battery charging during backup operation.   
 
The battery capacity of this system can be expanded by adding additional cabinets adjacent to the master battery 
cabinet. Expansion of battery capacity is not covered within the scope of this document.   

 

 
 

2.2 Glossary 

 

Term 

Definition 

Term 

Definition 

AC 

Alternating Current 

GND 

Ground 

ARC 

Auto Recovery Circuit 

LED 

Light Emitting Diode 

AS/NZS  Standards Australia 

NC 

Normally Closed 

CEC 

Clean Energy Council 

NO 

Normally Open 

CPU 

Central Processing Unit 

PCS 

Power Control System (Inverter) 

DC 

Direct Current 

PE 

Protective Earth 

DRED 

Demand Response Enabling Device 

PV 

Photo-Voltaic 

DRM 

Demand Response Mode 

RF 

Radio Frequency 

EMS 

Energy Management System 

SOC 

State Of Charge (Battery) 

ESD 

Electrostatic Discharge 

SOH 

State of Health (Battery) 

ESS 

Energy Storage System 

 

 

Содержание Evolve ESS AU 13

Страница 1: ...lve ESS AU 13 kWh Evolve ESS AU 26 kWh Evolve ESS AU 39 kWh Grid Support Utility Interactive Inverter Integrated Lithium Battery For use only with battery model LG Chem EM048126P3S7 Installation Start...

Страница 2: ...Revision History Revision Date Status Author Comments 1 0 05 Oct 2022 Released RWM Initial release...

Страница 3: ...AC Grid output circuit CAUTION This equipment contains high energy lithium batteries Qualified and trained personnel should wear protective clothing and equipment when working inside the battery cabin...

Страница 4: ...ATTERY BMS TO PCS COMMUNICATION CONNECTION 11 6 SYSTEM ELECTRICAL WIRING 11 6 1 AC POWER CONNECTIONS 12 6 2 CHASSIS GROUNDING 13 7 ENERGY METER INSTALLATION 13 7 1 ELECTRICAL CONNECTIONS VOLTAGE MEASU...

Страница 5: ...THERMAL PERFORMANCE CHARGE DISCHARGE CURVES 22 APPENDIX A ELECTRICAL BLOCK DIAGRAM OF INTER CABINET WIRING 23 APPENDIX B ENERGY METER WIRING DIAGRAMS 24 B 1 ACCU ENERGY ACUREV 1310 24 B 1 2 A Main el...

Страница 6: ...he fire department or other required emergency response team Evacuate the area and if applicable follow your emergency evacuation plan if others are in proximity to the installed location In case of f...

Страница 7: ...ration and hazards Only connect this product to a compatible electrical service as defined in the model specifications This product must be connected to a dedicated branch circuit in the main electric...

Страница 8: ...either via CT monitoring or via compatible communication protocols with a select list of PV inverter models Consult Eguana Technologies for the most recent list of PV inverters with direct communicati...

Страница 9: ...J 45 crimp tool EMS to PCS communication cable and RJ 45 connectors M8 mounting hardware for wall bracket load bearing 2 5 Inverter DSP Firmware Version The Inverter DSP firmware version is displayed...

Страница 10: ...Refer to the environmental ratings in section 16 2 of this manual CAUTION Do not install in direct sunlight Battery performance is dependent upon operating ambient temperature Radiant heat absorbed i...

Страница 11: ...is connected to the backup circuit 2 The example above is shown with the energy meter relocated from the PCS to the main electrical panel For installations where the energy meter is located within the...

Страница 12: ...urces Overcurrent protection devices RCD Type A 300 mA are sufficient for protection of both AC Grid and AC load ports 7 Total AC nameplate of PV not to exceed 5 kW String inverter shown for simplicit...

Страница 13: ...g nut are mounted from inside the cabinet 4 Mount the leveling bracket to the cabinet CAUTION Battery cabinet is heavy Mechanical lift recommended 5 Lift the battery cabinet onto the wall mount bracke...

Страница 14: ...left until mating to the gasket 14 Place the coupling plate inside the PCS cabinet and insert the four mounting bolts and washers through to the battery cabinet side 15 Place star washers on the bolts...

Страница 15: ...rque can result in an arc fault hazard and risk of fire Damage as a result of improper termination is not covered by the manufacturer warranty 1 Remove the plastic safety barrier on the power panel as...

Страница 16: ...hotovoltaic inverter Wiring methods must be in accordance with local electrical codes The installer is responsible for ensuring that over current protection is installed and sized appropriately for th...

Страница 17: ...ranch circuit over current protection in accordance with local electrical codes WARNING Improper connection of the wiring panel may result in equipment damage and cause personal injury Disconnect all...

Страница 18: ...vered in this guide is generic to the approved list of integrated energy meters that are supported by the home storage system at the time of your purchase Refer to the energy meter manufacturer s inst...

Страница 19: ...ded for reliable communication access to the system The Ethernet wiring from the battery system must be connected to a customer supplied router A permanent Ethernet connection to the battery system re...

Страница 20: ...on 1 Remove the front cover from the battery cabinet adjacent to the PCS cabinet 2 Press the Power button see above label 8 on the master battery module The master battery module has communication wir...

Страница 21: ...and PCS Refer to table in section 12 2 for definitions of the indicator status of the PCS 4 Turn ON the AC breaker at the main electrical panel to the PCS 10 1 Shutdown Sequence 1 Press and hold the s...

Страница 22: ...to normal operation using the service button Note It is recommended to login to the EMS via web browser and retrieve the service code from the system prior to attempting to clear the service mode Refe...

Страница 23: ...xtension cords connected to a backup circuit should be limited to 10 meters IMPORTANT This product does not support automatic gas generator integration Do not attempt to connect a gas generator to the...

Страница 24: ...rials to clean the unit Never remove or unplug connections or plugs during cleaning 14 Troubleshooting System faults are reported and logged in the monitoring system All fault logs are also accessible...

Страница 25: ...e anti islanding method Sandia frequency shift Protective Class I II or III Class I Over Voltage Category OVC I II III or IV OVC III Inverter topology type Isolated Electrical data DC Nominal DC Volta...

Страница 26: ...les 103 kg Installation type Wall mount upright Environmental data Ingress protection rating IP34 Pollution Degree 3 Cooling method Natural convection Ambient temperature relative humidity altitude 10...

Страница 27: ...ing AC Power Derating Full Range Derated 15 to 45 C 10 C 10 C 50 C 0 1000 2000 3000 4000 5000 6000 0 10 20 30 40 50 60 70 80 90 100 AC POWER VA SOC Evolve ESS AU Discharging AC Power Derating Full Ran...

Страница 28: ...ery to PCS BMS CAN port A2 801003533 BMS cable short Interconnects modules within same cabinet A3 801003247 BMS cable long Interconnects modules between cabinets A4 Battery power cables Positive negat...

Страница 29: ...S 485 Communication to the EMS B 1 2 A Main electrical panel meter CT and power wiring B 1 2 B PV meter CT and power wiring ESS ESS Home loads L1 L2 L3 L1 L2 L3 Figure 18 EMS to Acurev 1310 energy met...

Страница 30: ...25 B 2 Eastron SDM630MCT 40mA RS 485 communication wiring CT wiring Voltage sense wiring EMS panel electrical block diagram...

Страница 31: ...INSTALLATION NOTES...

Страница 32: ...Eguana Technologies Inc Doc 68118 Rev1 2022...

Отзывы: