
15
IMPORTANT! Portable extension cords connected to a backup circuit should be limited to 10 meters.
IMPORTANT! This product does not support automatic gas generator integration. Do not attempt to connect a gas
generator to the battery system. If generator support is required, consult your installer regarding a separate manual
transfer to your backup electrical panel.
NOTE: The power output / surge rating will be further limited when the battery is below 10% SOC.
9.4.1 Backup Power Display Modes
Display
Definition
Battery status LEDs indicate the following:
Charge = flash right. Discharge = flash left.
PCS and service lights off.
Low SOC shutdown in backup mode. See section 5.2 to restart the system.
Low SOC shutdown initiated while out of service. See troubleshooting – section 7,
“service light on in backup mode”.
9.5 Restarting the battery system after low battery shutdown
The system will shutdown when the battery reaches a critically low level during backup operation.
To restart the system:
IMPORTANT! Ensure there is adequate sunlight for the solar PV system to charge the battery before restarting
the system. If the battery system is installed without a PV system connected to the backup panel, do not attempt to
restart the system. Wait for the utility power to return.
1.
Press and hold the service button for 5 seconds.
The backup power will restart, allowing the PV system to
reconnect* and begin charging the battery. The system will continue to operate if the battery charges to its minimal
normal operating range. If the battery does not charge within 15 minutes of restart, the system will shut down to
preserve the battery.
*PV system reconnect time is approximately 5 minutes.
Note: If necessary, the load circuits can be shut off inside the backup panel to increase the battery charge rate. Do not
shut off the PV circuit.
10 Maintenance
The Evolve ESS is a maintenance free product. Regularly scheduled inspection of the airflow path for the active
cooling fans on the bottom side of the PCS cabinet is all that is required. This inspection should occur on an annual
basis, or coincide with PV inspection.
Содержание ACB05U-LP
Страница 29: ...26 THIS PAGE INTENTIONALLY LEFT BLANK...