background image

Smart. Solar

. Box

Smart. Solar

. Box

Installation and user handbook - rev. 1.1 of 13|09|2018

8

Warnings

General indications

y

y

This document is an integral and essential part of the product. 

It is to be used by the installer and the end user, who must ke-

ep it carefully after the system has been installed and started.

y

y

The manufacturer is not liable for any damage deriving from in-

correct observation of the instructions and indications given in 

this document, those relative to possible accessories supplied wi-

th the system and for the non-observance of pertinent applicable 

national and local laws.

y

y

Before installation and use, obtain information on the current 

regulations and laws in the place where the system is to be in-

stalled.

y

y

The 

EGO PRIME

 solar collector with integrated storage was de-

signed and manufactured to produce domestic water that is he-

ated by solar power. Any use other than that indicated relieves 

the manufacturer from any responsibility and renders all guaran-

tees null and void.

y

y

All technical drawings, plant layout and electric wiring diagrams 

etc. that are present in this manual are indicative and are only 

given as examples. All connections, the safety devices, diame-

ter sizes and any other thing necessary for correct system in-

stallation must be verified by a qualified and expert technician, 

who must make sure of their correspondence with regulations 

and laws in force.

y

y

The manufacturer is not liable for any damage caused to the pro-

duct resulting from assembly that is not state-of-the-art.

Indications for safety

y

y

This product must be installed by a professionally qualified com-

pany or technician, according to national and/or local laws in for-

ce and the instructions given in this handbook.

y

y

Maintenance and cleaning must also be carried out by specia-

list companies or staff with the pertinent technical qualifications.

y

y

The term ‘professionally qualified technician’ indicates a person 

with specific technical skills in water for domestic use, as well as 

in heating systems, gas systems and electric systems. This person 

must have the professional skills indicated by law.

y

y

On the basis of the user guidelines, whoever uses the system 

must keep it in good condition and guarantee that it works sa-

fely and correctly.

y

y

The system user must ensure that the maintenance indicated in 

this handbook (see the PROGRAMMED MAINTENANCE chapter) 

is carried out.

y

y

Do not leave parts of the packaging or the system within the re-

ach of children.

y

y

Before cleaning or carrying out maintenance, disconnect the 

power supply from any electric accessories that may be present.

y

y

Dispose of the various packaging elements in a suitable manner.

y

y

Check the pressure of the water transportation network: if the 

pressure is higher than the nominal pressure of the product (4 

bar = 400 kPa), prepare the necessary reduction units before the 

connection and regulate the pressure (see STARTING chapter)

y

y

Should faults occur, or if the system does not operate correctly, 

do not attempt to repair the product. Instead, disable it and con-

tact a specialist technician. Should it be necessary, componen-

ts must only be replaced with original spare parts, which must 

be installed by qualified technicians. Should this not be the ca-

se, the manufacturer reserves the right not to recognise any gua-

rantee rights.

Protection from vacuum overheating

The 

EGO PRIME

 solar collector with integrated storage is supplied 

equipped with a PVC cover sheet which darkens the surface that 

collects the sun’s rays, therefore protecting the product against 

overheating caused by direct exposure, above all in the case when 

the collector has been installed but is not connected to the water 

system (therefore no water present). The collector, in fact, was not 

designed to be exposed directly to the sun’s rays without being filled 

with water.

 

 Exposure to the sun when the system is empty can da-

mage the product; in this case the manufacturer will not 

recognise any guarantee rights.

The cover sheet must be left on the solar collector until it is started 

(see also the STARTING chapter).

Should it be necessary to empty the system for maintenance or as a 

no-freeze function, it should be covered by the cover sheet.

Protection from burns

Danger! The water inside the collector can reach temperatures of ap-

proximately 90 °C.

To prevent the danger of burns and/or scalds, be extremely careful 

when:

- connecting the hydraulic supply to the domestic water supply;

- loading and unloading the system;

- carrying out any intervention on the hydraulic connection.

Always position a thermostatic mixer valve between 

the system outlet and the domestic water user (see 

HYDRAULIC CONNECTION chapter)..

In general, do not touch the transport pipes or the hydraulic con-

nections and the internal accumulation tanks while the system is 

operating.

Should it be necessary to empty the system while it contains hot wa-

ter:

- do not discharge directly onto the roof or into the ground;

- use a flexible hose to safely lead the water to a drain.

Protection against lightning

Pursuant to the Directive EN 62305 1-4, the EGO solar collec-

tor with integrated storage must not be connected to the pro-

tection system used by the building against lightning, unless 

indicated otherwise by local laws in force.

Have a technician or skilled electrician check 

the installation area for this possibility.

All metal structures that are present, therefore also the supporting 

structure and fixing shafts of the system, must have the same electric 

potential as the building. It is therefore good practise to prepare suitable 

earthing for the metal parts of the system.

This can be done by a skilled electrician and the evaluation of the equipo-

tentiality level evaluated by a skilled electrical engineer.

Laws and reference standards

Decree n. 37/2008 of 22 January 2008
UNI EN 12976-1:2006
UNI EN 12976-2:2006
UNI EN 1991:2004 PARTS 1-2,1-3,1-4 (Actions on structures)
Directive 97/23 / CE
UNI EN 1717:2002
Legislative Decree n. 81 of 09 April 2008

Содержание PRIME 110

Страница 1: ...www pleion it EGO PRIME 110 150 180 220 260 INSTALLATION AND USER HANDBOOK EGO PRIME solar collector with integrated storage Senza titolo 2 1 12 03 18 16 32 ENG REV1 1...

Страница 2: ...Smart Solar Box Installation and user handbook rev 1 1 of 13 09 2018 2 The key to a cleaner planet is in your hands...

Страница 3: ...uality product EGO PRIME solar collector with integrated storage was designed by an Italian company and all its components are produced 100 in Italy After its simple installation you can enjoy the bea...

Страница 4: ...on 15 Necessary items 15 Installation phases 16 Anchoring with ballasts 18 Installation on a sloped roof 18 Place and position 18 Necessary items 18 Installation phases 19 HYDRAULIC CONNECTION 21 Gene...

Страница 5: ...d Before starting to install the product make sure all the components are present LETTER COMPONENT QUANTITY PIECES EGO solar collector with integrated storage 1 a b BASIC SUPPORT pair of galvanised sh...

Страница 6: ...wer 1 000W 230V ELECTRICAL RESISTOR FOR INTEGRATION 2 kW Article code 4400234102 power 2 000W 240V SAFETY AND ONE WAY UNIT with MF connections Article code 4400223301 PRESSURE REDUCER with MF connecti...

Страница 7: ...ESSARY QUALIFIED ELECTRICIAN QUALIFIED DESIGNER RISK OF BURNS RISK OF FALLING MATERIAL FROMABOVE TIGHTEN LOOSEN MANUALLY TIGHTENWITH SPANNER PERFORATEWITH DRILL DANGER OF OVERPRESSURE DANGER OF ELECTR...

Страница 8: ...connection and regulate the pressure see STARTING chapter y y Should faults occur or if the system does not operate correctly do not attempt to repair the product Instead disable it and con tact a spe...

Страница 9: ...the product warranty The electrical resistors antifreeze and integration can be used with chlorine levels up to twice the limit imposed by Directive 98 38 EC and subse quent amendments Hardness It is...

Страница 10: ...tank is not subject to CE marking but the producer guarantees it as established in the directive because designed and produced following a correct construction procedure the accumulation system does n...

Страница 11: ...m2 1 48 m2 1 86 m2 2 25 m2 2 64 m2 absorption surface area 0 85 m2 1 13 m2 1 41 m2 1 69 m2 1 98 m2 effectiveACS content 105 liters 140 liters 175 liters 210 liters 245 liters cover requirements 1 2 2...

Страница 12: ...ositioned in the lower part of the system it heats up as it pas ses from the lower cylinders to the upper ones and finally exits from the highest cylinder and goes into the system directly to the user...

Страница 13: ...things that are of a suitable capacity and size Structural check The EGO PRIME solar collector with integrated storage can be placed on the ground or on a structure attic covering balcony etc that ca...

Страница 14: ...n the collector at least 1 2 metres from any obstacles that are present Direct the transparent surface as close to the south as possible If deviated slightly towards the east or the west the system st...

Страница 15: ...www pleion it 15 Installation phases FLAT ROOF 1 1a 1b 1c CARICO NEVE CARICO VENTO 1 2 kN m2 100 km h 2 4 DETTAGLIO A A 3 13 MAX 20 Nm DETTAGLIOA 3c 3d 3b 3a DETTAGLIOA...

Страница 16: ...nd user handbook rev 1 1 of 13 09 2018 16 5 8 DETTAGLIO A A DETTAGLIO A A 5a 5b 5c 5d 5a 6 6a 5d 5c 8b 8b 8a DETTAGLIOA DETTAGLIOA 5b 7 7b 7a 7b 7a EGO PRIME A B 110 150 2050 150 250 2050 180 400 2050...

Страница 17: ...nections or the caps Place and position Carefully check the state of the cover and the supporting structure Get a structural technician to check the maximum loads of the building considering the weigh...

Страница 18: ...olar Box Smart Solar Box Installation and user handbook rev 1 1 of 13 09 2018 18 Installation phase SLOPED ROOF 1 CARICO NEVE CARICO VENTO 1 2 kN m2 100 km h 5 25 cm 5 25 cm 5 25 cm 5 25 cm 4 2 3 DETT...

Страница 19: ...www pleion it 19 6 8 7 DETTAGLIOA DETTAGLIO A A 5 13 A A 9 13 A Installation phase...

Страница 20: ...t is indicated in this manual complies with laws and regulations in force at the installation place The manufacturer is not liable for any damage caused to things and injury to people as a result of i...

Страница 21: ...line from the water system B water filter X C pressure reducer adjusted at 3 bar OPZ D interception valve X E safety and one way valve setting 4 5 0 5 bar F discharge tap X G flexible hose X LETTER C...

Страница 22: ...he solar collector connections This compensates the thermal expansion of the lines caused by temperatu re oscillations and makes disconnecting and repositioning the solar collec tor easier if it has t...

Страница 23: ...r heaters these devices must be connected to the domestic water system using a hydraulic safety unit This unit must include at least one interception tap a one way valve a control device for the one w...

Страница 24: ...reate a 90 angle as to the horizontal surface Before tightening the valve to the outflow connection connect between the valve and the user supply line To do this keep the plastic connection still usin...

Страница 25: ...as required within the range of 35 55 C Use the adjustment knob to do this Connecting more than one collector mod 110 180 260 If it is necessary to use several collectors parallel connection is stron...

Страница 26: ...ated solar collector is supplied with a plasticizer free PVC covering she et which serves the purpose of blacking out the surface that captures the solar irradiation This will prevent the product from...

Страница 27: ...Allow the water to flow inside the system for a certain period of time in order to rinse out any deposits or residues that could have entered the tank during installation Convey the exiting water down...

Страница 28: ...the users and allow a sufficient amount of water to flow in for lowering the temperature and rinsing out the system b Close the shut off valve at the inlet c Disconnect the return line from the by pas...

Страница 29: ...SHOCK Do not connect the electric resistors at current values that are different from those given on the plate Indications on using electric resistors Should the risk of the temperature falling below...

Страница 30: ...currents condensation aggres sive or acid water incorrect descaling treatments lack of water deposits of lime stone and sludge i force majeure such as fire theft freezing overheating whirlwinds bolts...

Страница 31: ...e integrity of the accumulation tank In this case it will be necessary to install a softening or filtration device upstream from the system carry out adequate cleaning and if necessary replace the val...

Страница 32: ...Be the change that you want to see in the world M GANDHI PLEION Srl Via Venezia 11 Cerea Verona infoline 39 0442 320295 info pleion it www pleion it cod 4400994018...

Отзывы: