4. Installation

 

ƒ

Check the flooring boards for visible damage / defects. Determine which is the tongue and which is the groove (Figure 1 / Figure 2).

 

ƒ

Start installing the first two rows in the left-hand corner of the room, ensuring that both tongue sides of the first board face the 
wall and both groove sides face the fitter (Figure 1 / Figure 2).

The boards in the first two rows can be installed simultaneously, which means constantly alternating them whilst complying with the 
minimum offset of the end joints of 200 mm (

Attention!

 In the case of Long format boards, a minimum offset of 500 mm applies, as 

shown and described below.

Wall

8 - 10 mm

8 - 10 mm

Board 1 

 =   Lay in a left-hand corner of the room

Board 2

 =   Longitudinal angling of this shortened board. To do so, place the longitudinal tongue diagonally from above into the 

longitudinal groove of Board 1 and lower Board 2 until it is lying flat. (see Figure 3)

Board 3

 =   Longitudinal angling & pressing in the short side. To begin with, return the longitudinal tongue at a slight angle from 

above into the longitudinal groove of Board 1. Now push Board 3 in this slanted position towards the front of Board 
2, until the short sides of both elements push against each other and fits perfectly. Once again lock the longitudinal 
connection by lowering and at the same time the frontal connection by pushing until you can feel them snap into place. 
(see Figure 4)

Board 4

 =   Longitudinal angling on the opposite side and pressing in the short side as before. Place the longitudinal groove at a 

slight angle under the longitudinal tongue of Board 3. Push Board 4 in this slanted position towards the front of Board 
1, until the short sides of both boards push against each other and fit perfectly. Now once again lock the longitudinal 
connection by lowering and at the same time the frontal connection by pushing until you can feel them snap into place. 
(see Figure 5)

Board 5

 =   Longitudinal angling and pressing on the short side (see Board 3).

Board 6

 =    Longitudinal angling and pressing on the short side (see Board 4)

Board 7

 =   Longitudinal angling and pressing on the short side (see Board 3)

Board 8

 =   Longitudinal angling and pressing on the short side (see Board 4).

Install all remaining boards for the first and the second row as described above, and cut the last boards to fit (Figure 6)

Finally, orientate the first two rows to face the walls, as required, check the wall distance (8-10 mm) from the wall and position the 
spacers. (Figure 7 to Figure 10)

a

b

c

6

7

2

9

a

b

c

4

8

3

1

a

b

c

5

10

Installation

Содержание UNIfit!

Страница 1: ...Installation instructions for Egger Laminate and Comfort flooring with UNIfit installation system...

Страница 2: ...M For calcium sulphate screeds calcium sulphate floating screeds 0 5CM heated screeds 0 3CM These values apply to screeds without additives With the use of additives and in case of fast setting screed...

Страница 3: ...heating engineer installer floor covering manufacturer must work together in a coordinated manner All surface heated flooring requires appropriate planning and coordination of the heating system and s...

Страница 4: ...nate flooring and Comfort flooring elements are installed at right angles to the floorboards Elastic flooring surfaces PVC linoleum vinyl The use of flexible floor coverings meets the damp proofing re...

Страница 5: ...one at right angles to the boarding or the direction of the strip parquet wooden floor Planning the first row First the room must be measured to determine whether the width of the first row should be...

Страница 6: ...sides of both elements push against each other and fits perfectly Once again lock the longitudinal connection by lowering and at the same time the frontal connection by pushing until you can feel the...

Страница 7: ...leftover piece of the previous row if this is at least 200mm long or 500mm for Long format floor boards You can continue to install board after board now In order to prepare the last row of boards for...

Страница 8: ...and tapping block Figure 1b 1c On door frames that cannot be shortened e g made of metal the fitted expansion joint must be sealed or covered with an elastic jointing material or suitable end profile...

Страница 9: ...ort flooring immediately Steam cleaners should not be used the exception being on Aqua Laminate Flooring Only clean laminate and Comfort flooring with a damp cloth Never use scouring or abrasive mater...

Страница 10: ...3841 301 20222 flooring egger com EGGER Drevprodukt Gagarin Ezhvinsky proezd 1 215010 Gagarin Oblast Smolensk Russia T 7 48135 79 300 F 7 48135 79 311 info ru egger com EN_EGGER_flo_installation_inst...