background image

8

Installation

Pipes

1

3

2

4

 

ƒ

Measure the position of the pipes and mark it on the panel (allow for edge joint).

 

ƒ

Drill at least 16 mm more than the diameter of the pipe.

 

ƒ

Saw the holes at a 45° angle.

 

ƒ

Fit and glue the sawn piece. 

Door frames

1a

1b

1c

= +

 16 mm

a

b

c

2

 

ƒ

If there are wooden door frames, it is recommended to shorten these by the installation height (flooring plus underlay materials) 
in consultation with the customer. (Figure 1a)

 

ƒ

Then install laminate or Comfort flooring under the frame with an appropriate expansion joint. In case the installation takes you to 
a door frame, the respective board can be angled longitudinally and lowered. Subsequently, the element placed flat on the floor 
is pushed under the door frame and the frontal connection is locked through horizontal knocking with a hammer and tapping 
block. (Figure 1b + 1c)

 

ƒ

On door frames that cannot be shortened, e.g. made of metal, the fitted expansion joint must be sealed or covered with an elastic 
jointing material or suitable end profiles. (Figure 2)

Flooring profiles and skirting boards

After finishing the professional installation of the laminate or Comfort flooring, both the necessary flooring profiles and skirting 
boards are fitted. Simple assembly instructions are enclosed with all the accessories.

Attention!

 With most types of profile, it is necessary to fit the base (sub-profile) to take the cover profile before installing laminate 

and Comfort flooring.

Removal / Dismantling of Boards

To replace boards already installed without damaging them, you must firstly loosen the entire row on the long side from the locking 
mechanism by bending it and then pushing the boards parallel against each other on the short side whilst they are flat on the 
ground. Proceed with due care in order to avoid damaging the tongue and groove.

a

b

c

Содержание UNIfit!

Страница 1: ...Installation instructions for Egger Laminate and Comfort flooring with UNIfit installation system...

Страница 2: ...M For calcium sulphate screeds calcium sulphate floating screeds 0 5CM heated screeds 0 3CM These values apply to screeds without additives With the use of additives and in case of fast setting screed...

Страница 3: ...heating engineer installer floor covering manufacturer must work together in a coordinated manner All surface heated flooring requires appropriate planning and coordination of the heating system and s...

Страница 4: ...nate flooring and Comfort flooring elements are installed at right angles to the floorboards Elastic flooring surfaces PVC linoleum vinyl The use of flexible floor coverings meets the damp proofing re...

Страница 5: ...one at right angles to the boarding or the direction of the strip parquet wooden floor Planning the first row First the room must be measured to determine whether the width of the first row should be...

Страница 6: ...sides of both elements push against each other and fits perfectly Once again lock the longitudinal connection by lowering and at the same time the frontal connection by pushing until you can feel the...

Страница 7: ...leftover piece of the previous row if this is at least 200mm long or 500mm for Long format floor boards You can continue to install board after board now In order to prepare the last row of boards for...

Страница 8: ...and tapping block Figure 1b 1c On door frames that cannot be shortened e g made of metal the fitted expansion joint must be sealed or covered with an elastic jointing material or suitable end profile...

Страница 9: ...ort flooring immediately Steam cleaners should not be used the exception being on Aqua Laminate Flooring Only clean laminate and Comfort flooring with a damp cloth Never use scouring or abrasive mater...

Страница 10: ...3841 301 20222 flooring egger com EGGER Drevprodukt Gagarin Ezhvinsky proezd 1 215010 Gagarin Oblast Smolensk Russia T 7 48135 79 300 F 7 48135 79 311 info ru egger com EN_EGGER_flo_installation_inst...

Отзывы: