5
Inverter unit Software CD
Manual
RS-232 Cable Battery Comms Cable Parallel Cables
Preparation
To prepare for the wiring step of installation, remove the bottom cover as shown below.
Mounting the Unit
Consider the following points before selecting a location for installation:
z
Avoid mounting the inverter on combustible construction materials. Masonry or fire-resistant surfaces for
mounting are recommended.
z
Mount on a solid surface or appropriate strut/frame.
z
Install this inverter at the operator’s eye level in order to allow the LCD display to be read at all times.
z
The ambient temperature should be between 14°F(-10°C) and 122°F(50°C) to ensure optimal operation.
z
Install the inverter vertically and follow local AHJ requirements for equipment clearances.
z
Ensure enough clearance based on the diagram above for proper cooling/ventilation.
SUITABLE FOR MOUNTING ON CONCRETE OR OTHER NON-COMBUSTIBLE SURFACES ONLY.
INSTALLATION
Unpacking and Inspection
Before installation, please inspect the unit. Be sure nothing inside the package is damaged. Check to ensure the
following items are included with each inverter: