
UPS: MKD 700
– 3000 VA RT (XL)
Installation and Connection
External battery bank connection on the example of the standing device
In general, the battery bank connection on the MKD devices can be executed on
the front side of the device:
Step 1:
Remove the front panel of both devices (UPS and battery bank);
See the instructions under 5.1.1 Preparations for installation here.
Step 2:
Connect the battery bank with the intended plug connection of the UPS
(1) or an additional battery bank according to the following illustration;
Fig. 5-13 Model coupling of the UPS with an external battery bank.
Step 3:
The respective front panels must be removed from the area (2) as the
connection cable of the battery bank connection are here. The plastic edge is
already perforated at this point.
Step 4:
Reattach the front panels of all devices (UPS and battery bank (s));
In the case of a connection of an additional battery bank, the procedure is
generally the same.
With this the connection work for the connection of one or more external battery
banks is concluded.