Section
IV:
Maintenance
4.0.MAI.SL-105
PRESSURE CHECK STEPS (EHV)
1. Locate the female O-Ring Hex Plug found on the top of the hoist electric over hydraulic
control valve (see illustration below).
2. Remove the O-Ring Hex Plug and attach the pressure gauge to the hydraulic control
valve (see illustration below).
3. Start the truck.
4. Push the lift (dump) circuit lever left until the lift (dump) cylinder bottoms out (see
illustration on the right). Continue to push the
lever forward until steps 5-6 are complete.
5. Check the gauge for the maximum developed
system pressure. The SL-105 should have a
reading of 3,250 PSI.
6. With the pressure check complete; release all
functions.
4-9
Содержание swaploader SL-105
Страница 1: ... Hooked on Quality PA R T S A N D O P E R AT I O N M A N U A L HOIST SERIAL NUMBER MODEL SL 105 ...
Страница 2: ......
Страница 28: ...This Page Intentionally Left Blank ...
Страница 37: ...Section II Installation Accessories 2 8 INS ACC LEDLB 2 25 ...
Страница 38: ...This Page Intentionally Left Blank ...
Страница 42: ...This Page Intentionally Left Blank ...
Страница 46: ...This Page Intentionally Left Blank ...
Страница 48: ...Section IV Maintenance 4 0 MAI SL 105 LUBRICATION DIAGRAM LEGEND GW Grease Weekly GM Grease Monthly 4 2 ...
Страница 70: ...This Page Intentionally Left Blank ...
Страница 81: ......
Страница 82: ...1800 NE BROADWAY AVENUE DES MOINES IA 50313 TOLL FREE 888 767 8000 Rev 05 10 2022 ...