![background image](http://html.mh-extra.com/html/efco/swaploader-sl-105/swaploader-sl-105_parts-and-operation-manual_2366958054.webp)
Section
IV:
Maintenance
4.0.MAI.SL-105
2. Remove the female JIC #4 cap from the male JIC #4 adapter and attach the pressure
gauge to the hydraulic control valve (see illustration below).
3. Start the truck and engage the P.T.O.
4. Push the lift (dump) circuit lever forward until the lift (dump) cylinders bottom out (see
illustration below). Continue to push the lever forward until steps 5-6 are complete.
5. Check the gauge for the maximum developed system
pressure. The SL-105 should have a reading of
3,250 PSI.
6. With the pressure check complete; release all
functions and disengage the P.T.O.
4-8
Содержание swaploader SL-105
Страница 1: ... Hooked on Quality PA R T S A N D O P E R AT I O N M A N U A L HOIST SERIAL NUMBER MODEL SL 105 ...
Страница 2: ......
Страница 28: ...This Page Intentionally Left Blank ...
Страница 37: ...Section II Installation Accessories 2 8 INS ACC LEDLB 2 25 ...
Страница 38: ...This Page Intentionally Left Blank ...
Страница 42: ...This Page Intentionally Left Blank ...
Страница 46: ...This Page Intentionally Left Blank ...
Страница 48: ...Section IV Maintenance 4 0 MAI SL 105 LUBRICATION DIAGRAM LEGEND GW Grease Weekly GM Grease Monthly 4 2 ...
Страница 70: ...This Page Intentionally Left Blank ...
Страница 81: ......
Страница 82: ...1800 NE BROADWAY AVENUE DES MOINES IA 50313 TOLL FREE 888 767 8000 Rev 05 10 2022 ...