EFA SB 288 E Скачать руководство пользователя страница 33

Schmid & Wezel
D 75433 Maulbronn

Seite/ Page

19/ 27

Ausführung/ Execution

03.2008

Pos.

Fig.

Stück

Pcs.

Benennung

Designation

Best.-Nr.

Order No.

1

1

Gehäuse, vollst.

Housing, complete

007 009 722

2

12

Schraube mit Schlitz

Countersunk screw

001 326 406

3

1

Deckel

Cover

003 009 239

4

1

Dichtung

Seal

003 009 241

5

4

Zylinderschraube mit Schlitz

Cylinder screw

001 326 111

6

2

Mikro-Schalter

Micro-switch

001 601 215

7

2

Führungsleiste

Guide ledge

003 006 939

8

15

Federring

Spring washer

001 317 003

9

6

Zylinderschraube

Cylinder screw

001 326 019

10

6

Verschlußstopfen

Vent plug

001 368 634

11

1

Griff

Handle

002 000 303

12

1

Deckel

Cover

003 009 490

13

2

Dichtung

Seal

003 009 206

14

1

Federring

Spring washer

001 317 004

15

1

Sechskantschraube

Hexagon screw

001 325 909

19

1

Isolierteil

Insulating part

003 009 291

20

1

Lüsterklemme

Terminal strip

001 605 016

22

1

Doppelnippel

Double nipple

001 606 516

23

1

Kugelhahn

Ball valve

001 362 005

24

1

Dichtring

Packing ring

001 313 102

25

1

Außengewindetülle

Externally threaded sleeve

001 366 205

26

1

Winkelkabelverschraubung

Cable screw joint

001 325 514

27

1

Kabelverschraubung                    Hose screwing                               001 325 556

28

1

Kunststoffschlauch

Plastic hose

001 330 391

29

2

Sechskantschraube

Hexagonal screw

003 009 676

30

2

Zylinderstift

Cylinder pin

001 307 218

31

1

Sicherungsring

Snap ring

001 312 356

32

6

Sechskantschraube

Hexagon screw

001 325 999

33

1

Träger

Support

003 007 794

34

1

Metallzahnrad

Metal gear whee

003 005 383

35

1

Scheibe

Disk

003 007 806

36

1

Senkschraube

Countersunk screw

001 326 506

Содержание SB 288 E

Страница 1: ...ng unbedingt dem Bedienpersonal aush ndigen Important Informations Please forward these operating instructions to your operating personell Betriebsanleitung Operating instructions Wartungsanleitung Ma...

Страница 2: ...1 S gebandwechsel 5 4 2 S geband F hrung 6 4 3 Einstellung des Federzuges 8 5 Instandhaltung 8 6 Reinigung und Wartung 11 6 1 T gliche Reinigung nach Beendigung der Schlachtung 11 6 2 T gliche Wartung...

Страница 3: ...net Die Maschine ist f r eine andere Nutzung nicht aus ger stet Sollte eine anderweitige Nutzung vom Be diener gew nscht sein bitte unbedingt vorher R cksprache mit der Firma Schmid Wezel GmbH Co S W...

Страница 4: ...licher Gew hrleistung und Haf tung 3 Inbetriebnahme und Betriebssicherheit Arbeitsplatz Der Stellplatz f r den Bediener sollte mindestens 1 5 qm gro sein In diesen Bereich sollte kein an derer Arbeits...

Страница 5: ...g ber ein Magnetventil direkt mit der Motor schaltung gesteuert Es ist nur ein Kaltwasseranschluss vorhanden 3 2 Schalterbet tigung 3 2 1 Einschalten Vor dem Einschalten sind nachfolgende Punkte un be...

Страница 6: ...ung auf Sch den kontrollie ren allgemeine Sicherungsvorschriften siehe Kapitel 2 Sicherheitshinweise S 2 beachten Greifen Sie niemals in den Bereich des laufenden S gebandes Sie k nnten sich sonst Gli...

Страница 7: ...unktionen siehe Abb 5 Hartmetallplatte Abst tzung des S gedruckes Richtung Bandlauf Hebel E Bild 64 oben Arbeitsposition unten F hrung ent spannt zum Wechseln S geband 2 Hartmetallrundst be Umlenkung...

Страница 8: ...Schritte zur Demontage der F hrung aufgef hrt F hrung komplett Abbildung 8 F hrung 1 F hrung nach oben dr cken Abbildung 9 F hrung nach oben dr cken Spalt max 2 0 mm Neu 0 6 mm Fiberf hrung 2 F hrung...

Страница 9: ...Zugfeder auf Arbeits h he befindet Sollte kein Auszug m glich sein ist der Federzug blockiert und eine Neueinstellung ist notwendig drehen Sie die Schraube in Richtung PLUS bis ein Auszug m glich wird...

Страница 10: ...derem Hand griff auf Klemme pr fen Kabel oder Mikroschalter austau schen bzw neu verbinden 3 S ge l uft beim Bet tigen der Schalter an keine Leistung Leitungsquerschnitt oder L nge zu klein dimensioni...

Страница 11: ...en ggf austauschen 7 Band springt vom Rad ab Leitrollenrad vorne oder hinten eingelaufen oder verschlissen R der pr fen ggf austauschen Drehmoment zu gering eingestellt Mit Drehmomentschl ssel Band na...

Страница 12: ...Sie auf Vor allen Reinigungs und War tungsarbeiten das Ger t vom Be triebsnetz trennen Vor allen Wartungsarbeiten m s sen die Deckel B ge ffnet sein Einschaltsicherung dadurch ist ein unbeabsichtigtes...

Страница 13: ...soll ber das Wochenen de in ein lbad gelegt werden nicht nachschmie ren 6 3 4 Getriebe Die Getriebe haben Dauerschmierung Diese muss nur bei Reparaturen erneuert werden 6 4 Reparatur durch den Kunden...

Страница 14: ...these operating instructions to your operating personell Wichtige Informationen Diese Anleitung unbedingt dem Bedienpersonal aush ndigen Operating instructions Betriebsanleitung Maintenance instructio...

Страница 15: ...S gebandwechsel 5 4 2 S geband F hrung 6 4 3 Einstellung des Federzuges 8 5 Instandhaltung 8 6 Reinigung und Wartung 11 6 1 T gliche Reinigung nach Beendigung der Schlachtung 11 6 2 T gliche Wartung d...

Страница 16: ...saw for hogs and saws in medium sized and large processing plants The machine is not designed for any other use If you wish to use the equipment for other purposes first consult Schmid Wezel GmbH Co S...

Страница 17: ...spanners or wrenches attached to the tool Before starting the machine inspect the splitting saw to ensure that all spanners and wrenches have been removed 9 Handle your tools with care Use only sharp...

Страница 18: ...manufacturer shall not be liable for damages caused by modified equipment Modifications to the machine void all warranty Check the motor s direction of rotation Figure 1 Direction of movement of band...

Страница 19: ...peration of switch page 4 3 3 2 Operational safety For safety reasons the EFA SB 288 E is equipped with two operating handles Hold the machine by the fixed handle and the switching lever Never attempt...

Страница 20: ...Direction of band run Lever E fig 64 top working position bottom guide mechanism released for band change Saw band Retighten the saw band The tips of the saw band teeth are hardened and cannot be res...

Страница 21: ...5 the pro cedure for changing the guide mechanism is the same for models SB287 SB288 and SB295 If the gap is wider than 2 mm change the fibre guide see figure 7 Figure 7 Changing guide Removing guide...

Страница 22: ...igure 14 Figure 14 Spring loaded pulley Turn the screw in MINUS direction until the tool is balanced and suspended at the correct height If it is not possible to pull more cable from the pulley it is...

Страница 23: ...ing lever or terminal Reconnect or replace cable or microswitch 3 Saw starts when switch is actuated but runs without power Power line cross section or lengths too small Check dimensions according to...

Страница 24: ...replace if necessary 7 Band jumps from wheel Guide wheel at front or rear worn Check wheels replace if necessary Band tightening torque too low Retighten band with the torque wrench Wheel ball bearing...

Страница 25: ...surface active disinfectant Before carrying out any cleaning or maintenance work disconnect the splitting saw from the supply network Before carrying out any maintenance work open the covers B switch...

Страница 26: ...orque wrench Over the weekend place the torque wrench in an oil bath Do not lubricate 6 3 4 Gear system The gear is equipped with permanent lubrication The lubrication must however be renewed after re...

Страница 27: ...age frequency 42V 50 Hz Motorleistung Motor rating 1900W 2 5PS Stromaufnahme Inenn Current consumption 17 A Schutzkart Protection class IP 65 Kabell nge Cable length 4 m Gewicht Weight 50 kg S gebandl...

Страница 28: ...ng Execution 3 2008 A 2 Maschinen Komponenten Machine Components Anschluss der Steuerung siehe Schaltpl ne For details of the control system connections see separate circuit diagramm Ma e Dimensions m...

Страница 29: ...Page 15 27 Ausf hrung Execution 03 2008 A 3 Schaltpl ne Circuit Diagrams A 3 1 Deckelsicherung EFA SB 288 E Cover lock EFA SB 288 E Steuerkanal Control cable Deckelsicherung Cover lock Handgriff Handl...

Страница 30: ...42V A 3 4 Leitungsquerschnitte Cross sections of lines Leitungsquerschnitt der Zuleitung L nge L zwischen Transformator und Steuerungskasten Querschnitt A 3 adrig erforderlich Leitungsmaterial Kupfer...

Страница 31: ...101 ohne Abbildung not illustrated 1 Federzug Spring balancer 001 620 053 ohne Abbildung not illustrated 1 Magnetventil f r automatisch Wasser ein aus 42 V electrovalve for automatic Waterflow on off...

Страница 32: ...Schmid Wezel D 75433 Maulbronn Seite Page 18 27 Ausf hrung Execution 03 2008 A 5Ersatzteilliste EFA 288 E Sparepart list EFA 288 E...

Страница 33: ...14 1 Federring Spring washer 001 317 004 15 1 Sechskantschraube Hexagon screw 001 325 909 19 1 Isolierteil Insulating part 003 009 291 20 1 L sterklemme Terminal strip 001 605 016 22 1 Doppelnippel D...

Страница 34: ...06 724 53 1 Dichtring Packing ring 001 344 236 54 1 Leitrollenrad vorne Idler wheel front 003 009 137 55 1 F hrungsplatte Guide plate 003 009 231 56 1 Lagerbolzen Bearing bolt 003 009 232 57 1 Leiste...

Страница 35: ...7 78 1 Dichtung Seal 003 009 548 79 1 Geh use Housing 003 009 547 80 2 Federring Spring washer 001 317 002 81 2 Sechskantschraube Hexagon screw 001 325 920 82 4 Zylinderschraube mit Schlitz Cylinder s...

Страница 36: ...seperate spare part list P 25 008 011 340 98 1 Motor vst 42V Pos 93 102 Motor 42V Fig 93 102 007 012 001 Motor vst 230 400V Motor 230 400V 007 012 003 93 1 Lagerschild End plate 003 011 854 95 1 Well...

Страница 37: ...00 328 104 1 Unterlegscheibe Washer 001 315 002 105 3 Zyl Schraube mit Schlitz Cylinderbolt 001 326 102 106 1 V Ring V ring 001 316 408 107 1 Sicherungsring EFA Gasket ring 001 312 417 108 1 Antriebsr...

Страница 38: ...Schmid Wezel D 75433 Maulbronn Seite Page 24 27 Ausf hrung Execution 03 2008 134 133 131...

Страница 39: ...230 400V 001 605 001 126 1 Zylinderschraube m Schlitz Cylinderbolt 001 326 117 127 1 Kabelverschraubung Cable gland 001 325 556 128 1 Winkelverschraubung 42V Elbow 42V 001 325 544 1 Winkelverschraubun...

Страница 40: ...skt Schraube Hexagon screw 001 325 913 140 1 Schalterhebel vst Switcher 007 010 267 141 1 Gleitlager Sliding bushing 001 346 022 142 1 Zylinderstift Cylinderbolt 001 307 217 143 1 Gummischlauchleitun...

Страница 41: ...Dichtung 1 14 003010266 Schaltergriff 1 15 007010267 Schalterhebel vst 1 16 001307217 Zylinderstift 1 17 001317002 Federring 4 18 001325913 Sechskantschraube 4 19 003002454 Abdeckkappe 1 20 001601206...

Страница 42: ...10 001604009 Reduzierung 1 11 001325544 Winkelverschraubung 1 12 001325531 Kabelverschraubung 1 13 003007630 Dichtung 1 14 003010266 Schaltergriff 1 15 007010267 Schalterhebel vst 1 16 001307217 Zylin...

Страница 43: ...id Wezel GmbH Co 75433 Maulbronn Allgem Toleranzen nach DIN ISO 2768 mK ISO 8015 1 2 Zusammengebaut nicht befr ste Fl chen polieren Oberfl che Schalterkasten vst 007014450 Zeichnungsnummer Benennung W...

Отзывы: