INSTALLATION
A705-74-880 Issue K
1. Refer to
. Remove the red blanking caps from the cooling-water outlet port (3) and the cooling-water
). Fill pump case with cooling-water and fit the outlet connection into the outlet port
(3) using sealant (Loctite 577 or equivalent).
2. Fit the end of your cooling-water supply pipeline to the Temperature Control Valve (TCV) with a suitable ½" BSP
adaptor using sealant (Loctite 577 or equivalent).
3. Fit the end of your cooling-water return pipeline to the outlet connection using a suitable ½" BSP adaptor using
sealant (Loctite 577 or equivalent).
4. Cooling-water supply lines should be rated to 7 bar working pressure and to 338°F (170°C).
Figure 7 - Cooling Schematic
3.10
Connect the shaft-seals purge and gas-ballast gas supplies
3.10.1
Introduction
Select the correct shaft-seals purge and gas-ballast requirements for your application. It is recommended that
nitrogen supply be connected to the gas systems if toxic, corrosive or flammable materials are to be pumped.
If a compressed air supply is required to the shaft-seal purge inlet, use the procedure in
ballast system can deliver filtered atmospheric air to the pump gas-ballast inlet, therefore it may not be necessary
to connect an air supply to the gas-ballast system.
If required to connect nitrogen supplies to the shaft-seals inlet and to the gas-ballast system. Use the procedures in
and
1.
TCV/Coolant inlet connection
2.
Coolant outlet connection