1-5
1.4 Quick Start Guide
The following steps must be taken to prepare the Trendsetter II
for operation.
1) Unpack and setup the unit.
•
Rotate the front foot 90
°
from its shipping position.
•
For air gaging applications, rotate the rear foot 180
°
from its shipping position and
install the filter regulator assembly. Connect 60 psi min supply air to the filter
regulator assembly
Note:
See "Basic Operations,
Unpacking & Setup
" for additional information, page 3-1
2) Setup and install the signal conditioning module if it was not installed before
shipment and connect the gage tooling.
•
Check that the jumpers and switches on the LVDT or A/E signal conditioning board
to be used are properly setup for the application to be run.
•
Install the signal conditioning module into the lower bay and secure with the two
thumb screws on the front panel.
•
Plug in the LVDT(s) or airline from the gaging fixture to the signal conditioning
module.
Power to the column must be turned off prior to installing or removing a signal
conditioning module.
Note:
See the "
Advanced Operation
, Module Setup" section for additional information,
page 4-1.
3) Program Trendsetter II
for the application.
•
Plug the power cord into the rear of the unit and to a 100 VAC to 240 VAC 50/60 Hz
power supply. Turn the unit on using the on/off switch on the rear of the unit.
•
Using the programming keys and the enter button program the scale, range, mode,
and limits for the application.
Note:
See the "Basic Operation,
Programming
" for additional information, page 3-7
4) Set up magnification and zero for the gage input or inputs.
•
Using the masters for the gage tooling and the mag and zero adjustments on the signal
conditioning modules setup the LVDT(s) or air inputs.
Note:
See "Basic Operation,
Input Setup
" for additional information, page 3-10
5) Select the proper gaging mode using the programming keys, see page 3-17. The
unit is ready for gaging.
Содержание Trendsetter II
Страница 2: ...rend Setter II User s Manual T T Edmunds GAGES...
Страница 15: ...2 3 2 3 Overall E8300Unit Figure 2 1 Trendsetter II Basic Unit...
Страница 17: ...2 5 Figure 2 2 Front Panel...
Страница 19: ...2 7 Figure 2 3 Rear Panel...
Страница 24: ...2 12 Figure 2 7 E8302 2 Channel LVDT Signal Conditioning Module...
Страница 26: ...2 14 Figure 2 8 E8303 1 Channel AE Signal Conditioning Module...
Страница 30: ...3 3 Front Mounting Foot Rear Mounting Bracket Figure 3 1 Base Feet Figure 3 2 Filter Regulator Mounting...
Страница 31: ...3 4 Figure 3 3 Air Connections For Air Gaging Application Only...
Страница 53: ...4 7 Figure 4 5 A E Block...
Страница 55: ...4 9 Figure 4 6a LVDT Module E8302 current version...
Страница 57: ...4 11 Input A Polarity Jumper Input B Polarity Jumper Figure 4 7a Polarity Jumpers current version...
Страница 59: ...4 13 Output Jumpers Input Jumpers Input Type Jumpers Figure 4 8 Input Output Jumpers...
Страница 65: ...4 19 J10 J3 J4 Figure 4 10a Attenuation Jumpers current revision...