4
Assembly
Slide both sections of rail into the connecting sleeve.
Thread the chain through the other limit stop in the
process.
Feed the first link of the chain into the tensioner on the
‘
electric end with cord
.’ Turn the electric end by 90
°
to
lock into position.
Push the electric end firmly into the end of the C-rail until
its flange meets edge of the rail. Loosen the screw on
limit stop “H” and slide against the tensioner.
90°
X
Note: the ‘electric end’ that ships in the assembly is not
used and may be discarded.