- 31
-
ENGLISH
COVERING INSTALLATION
fi g. 1
fi g. 2
A
fi g. 3
B
A
B
C
C
D
D
D
D
C
C
Fig. 1
The stove is delivered (fi g. 1) with metallic sides (A-B) and the
metallic brackets for fi xing the verti¬cal elements and with the
ceramic front elements (C-D) already fi tted.
The pieces indicated below are packaged separately.
• 2 ceramic side elements (E - fi g. 7)
• 2 ceramic horizontal elements (E - fi g. 7)
• 10 milled pins M4
• 10 washers
For fi tting proceed as follows:
Fig. 2
Remove the two metallic sides from the stove (A-B)
Fig. 3
Remove from the stove the metallic brackets (C-D) for fi x¬ing
the vertical and horizontal ceramic elements