SECTION 4:
OPERATING INSTRUCTIONS
4-10
PORT LF
0008595_REV_E
5.
While holding the Release End Cap in place insert the Kynar retaining rod back into the slot.
Continue inserting the rod until it comes out the other end of the slot as shown in
and
Figure 4-15: Replacing the Kynar Retention Rod
Figure 4-16: The Fully Inserted Kynar Retention Rod
Содержание PORT LF
Страница 9: ...ix 6 Fax one invoice packing list and a copy of the airway bill to EdgeTech upon shipment...
Страница 18: ......
Страница 20: ......
Страница 25: ...2 5 Figure 2 2 PORT LF Mechanical Standard 0010815...
Страница 26: ...SECTION 2 SPECIFICATIONS 2 6 Figure 2 3 PORT LF DEEP Mechanical 0019564...
Страница 46: ......
Страница 48: ......
Страница 65: ...6 17 Figure 6 24 PORT LF Callout Assembly Drawing Page 1 of 2 0008118...
Страница 66: ...MAINTENANCE 6 18 Figure 6 25 PORT LF Callout Assembly Drawing Page 2 of 2 0008118...
Страница 69: ......
Страница 70: ...REMOTE RELEASE B 2 Appendix Figure B 1 Remote Release 0012120...
Страница 71: ...B 3 Appendix Figure B 2 PORT LF Optional Remote Release 0012266...
Страница 72: ...B 4 Appendix Figure B 3 PORT LF Optional Remote Release Callout 0007639...
Страница 74: ...C 2 Appendix Figure C 1 Optional Tandem Kit Diagram 0017625...
Страница 75: ...C 3 Appendix Figure C 2 PORT LF Optional Tandem Kit Callout Diagram 0008237...
Страница 76: ......
Страница 78: ...D 2 Appendix Figure D 1 PORT LF Optional Strongback Diagram 0017674...
Страница 79: ...D 3 Appendix Figure D 2 PORT LF Optional Strongback Kit Callout Diagram 0008166...