
3-1
Chapter 3: Installing the Switch
Selecting a Site
Switch units can be mounted in a standard 19-inch equipment rack or on a flat surface.
Be sure to follow the guidelines below when choosing a location.
• The site should:
- be at the center of all the devices you want to link and near a power outlet.
- be able to maintain its temperature within 0 to 50 °C (32 to 122 °F), and its
humidity within 5% to 95%, non-condensing
- provide adequate space (approximately two inches) on all sides for proper air flow
- be accessible for installing, cabling, and maintaining the devices
- allow the status LED indicators to be clearly visible
• Make sure that twisted-pair cable is always routed away from power lines,
fluorescent lighting fixtures and other sources of electrical interference, such as
radios and transmitters.
• Make sure that the unit is connected to a separate grounded power outlet that:
- provides 100 to 240 VAC, 50 to 60 Hz
- is within 2 m (6.6 feet) of each device
- is powered from an independent circuit breaker
• As with any equipment, using a filter or surge suppressor is recommended.
Содержание ES3526VA-PoE
Страница 1: ...www edge core com Powered by Accton Installation Guide 24 Port Fast Ethernet PoE Switch ES3526VA PoE...
Страница 2: ......
Страница 4: ...ES3526VA PoE 38 E042005 R01 150200048800A...
Страница 18: ...xiv Figures...
Страница 44: ...Installing the Switch 3 12 3...
Страница 52: ...Making Network Connections 4 8 4...
Страница 56: ...Troubleshooting A 4 A...
Страница 62: ...Cables B 6 B...
Страница 66: ...Specifications C 4 C...
Страница 73: ......
Страница 74: ...ES3526VA POE 38 E042005 R01 150200048800A...