Chapter 2
| Installation Overview
AP Installation Tasks
– 16 –
Connect the AC Power Adapter and Power On
Connect the AC power adapter to the AP and to an AC power source.
Alternatively, the AP can be powered by a network connection to the RJ-45 port
from a PoE switch.
For more information, go to the chapter
“Power Requirements”
Figure 6: Connecting the AC Power Adapter
Verify AP Operation
Verify basic AP operation by checking the system LEDs.
For more information, go to
“Understanding the System Status LEDs”
Task 4
Connect the power adapter to the power socket.
Connect the power adapter to a nearby AC power source.
1
2
1
2
Task 5