Drop-In Elegance
4
INSTALLATION
2.1 General information
2.2 Transport, handling, unpacking, location.
2.3 Intended use and restrictions.
2.4
Manufacturer’s identification label description.
2.5 Installation and assembly.
2.6 Connections (electric, gas, water)
2.1
General information
You can find in you equipment the following symbols, or stickers to identify some type of warnings or
useful information about you.
The water bain-marie should be unpacked, installed and tested by qualified service personnel. After
being brought into the room where it is going to be installed, the device should be left for approximately
6 hours so that it can achieve the ambient temperature. Then it can be connected to power supply.
2.2
Transport, handling, unpacking, location
Correct and safe transport:
• Use equipment appropriate for the weight and structure of the devices;
• Cover corners and sharp edges;
Before carrying:
• Secure the area against unauthorised personnel;
• Make sure that the load is properly secured;
• Check all loose components lest they should fall when being lifted;
• Try to lift the load as vertically as possible so as not to make any dents in it;
• While carrying the load, make sure that it is as near the ground as possible.