6 - COMBUSTION AIR AND VENT PIPING - CATEGORY I (CHIMNEY VENT)
6.1 Check Your Chimney
Chimney must be clean, right size, properly constructed
and in GOOD CONDITION.
1.
Installation must conform to requirements of the
authority having jurisdiction or, in absence of such
requirements, to the National Fuel Gas Code, ANSI
Z223.1/NFPA 54 and/or Natural Gas and Propane
Installation Code, CAN/CSA B149.1.
2.
Increaser
fi
tting is required on this boiler for Category I
venting, and 4” is minimum permissible vent diameter.
This does not imply vent connector is intended to be 4”
diameter pipe. Vent connector shall be sized according
to appropriate venting tables in the National Fuel
Gas Code and may be required to be larger than 4”
diameter.
NOTICE
Boiler installation for chimney venting is not
complete unless increaser
fi
tting is located and
secured.
3.
These are Category I and Category III high ef
fi
ciency
boilers with lower stack or exhaust temperature.
4.
Venting into masonry chimney without liner, line
chimney from top to bottom with either:
A. Listed Type B vent pipe
B. Listed
fl
exible vent liner
C. Poured ceramic liner.
5.
Outside chimneys should not be used unless they are
(choose one of the following):
A. Enclosed in a chase
B. Lined with Type B vent pipe
C. Use listed
fl
exible vent liner
D. Use certi
fi
ed chimney lining system
6.
Vent connector from boiler to chimney should run as
directly as possible with as few elbows as possible.
7.
Common venting shall not be allowed. Boiler and
other certi
fi
ed appliances. appliances can share same
chimney vent. Consult appropriate Vent Sizing Tables
in National Fuel Gas Code for speci
fi
c requirements of
multiple appliance venting.
8.
Boiler is only appliance connected to vent, Type B vent
pipe is recommended for vent connector.
9.
Slope pipe up from boiler to chimney not less than 1/4”
per foot (21mm/m).
10.
End of vent pipe must be
fl
ush with inside face of
chimney
fl
ue. Use sealed-in thimble for chimney
connection.
11.
Fasten sections of vent pipe with sheet metal screws to
make piping rigid. Use stovepipe wires to support pipe
from above.
12.
Do not connect to
fi
replace
fl
ue.
13.
Do not install damper on this boiler.
WARNING
Boiler and venting installations shall be performed
by a quali
fi
ed service agent and in accordance with
the appropriate manual. Installing or venting boiler
or other gas appliance with improper methods or
materials may result in serious injury or death due
to
fi
re or to asphyxiation from poisonous gases such
as carbon monoxide with is odorless and invisible.
!
WARNING
Do not connect boiler to any portion of mechanical
draft system operating under positive pressure.
!
Figure 11 - Combustion Air Fitting
3
3
Horizontal Venting requires
fi
eld supplied appliance adapter
for the boiler
fl
ue outlet.
Boiler is provided with a 3” vent connection, 3” x 4”
increaser must be
fi
eld sourced for chimney application.
This does not mean that the connection to the chimney will
always be 4”.
Содержание CHB-100
Страница 6: ...Figure 2 Component Listing 6 3 GENERAL VIEW AND MAIN COMPONENTS ...
Страница 33: ...33 12 RATINGS AND CAPACITIES ...
Страница 38: ...KEY Part Number Description Qty A01 FE3980B830 CASING CTR 1 38 REPAIR PARTS LIST CHB 100 ...
Страница 40: ...40 REPAIR PARTS LIST CHB 100 ...
Страница 42: ...42 REPAIR PARTS LIST CHB 100 ...
Страница 44: ...KEY Part Number Description Qty A01 FE3980B830 CASING CTR 1 44 REPAIR PARTS LIST CHB 130 ...
Страница 46: ...46 REPAIR PARTS LIST CHB 130 ...
Страница 48: ...48 REPAIR PARTS LIST CHB 130 ...
Страница 50: ...NOTES 50 ...
Страница 51: ...NOTES 51 ...
Страница 52: ...ECR International Inc 2201 Dwyer Avenue Utica NY 13501 web site www ecrinternational com ...