6 - COMBUSTION AIR AND VENT PIPING  - CATEGORY I (CHIMNEY VENT)

6.1 Check Your Chimney

Chimney must be clean, right size, properly constructed

and in GOOD CONDITION.

1. 

Installation must conform to requirements of the 

authority having jurisdiction or, in absence of such 

requirements, to the National Fuel Gas Code, ANSI 

Z223.1/NFPA 54 and/or Natural Gas and Propane 

Installation Code, CAN/CSA B149.1.

2. 

Increaser 

fi

 tting is required on this boiler for Category I 

venting, and 4” is minimum permissible vent diameter. 

This does not imply vent connector is intended to be 4” 

diameter pipe. Vent connector shall be sized according 

to appropriate venting tables in the National Fuel 

Gas Code and may be required to be larger than 4” 

diameter. 

NOTICE

Boiler installation for chimney venting is not

complete unless increaser 

fi

 tting is located and

secured.

3. 

These are Category I and Category III high ef

fi

 ciency 

boilers with lower stack or exhaust temperature.

4. 

Venting into masonry chimney without liner, line 

chimney from top to bottom with either:
A.  Listed Type B vent pipe
B. Listed 

fl

 exible vent liner

C.  Poured ceramic liner.

5. 

Outside chimneys should not be used unless they are 

(choose one of the following):
A.  Enclosed in a chase
B.  Lined with Type B vent pipe
C. Use listed 

fl

 exible vent liner

D. Use certi

fi

 ed chimney lining system

6. 

Vent connector from boiler to chimney should run as 

directly as possible with as few elbows as possible.

7. 

Common venting shall not be allowed. Boiler and 

other certi

fi

 ed appliances. appliances can share same 

chimney vent. Consult appropriate Vent Sizing Tables 

in National Fuel Gas Code for speci

fi

 c requirements of 

multiple appliance venting.

8. 

Boiler is only appliance connected to vent, Type B vent 

pipe is recommended for vent connector.

9. 

Slope pipe up from boiler to chimney not less than 1/4” 

per foot (21mm/m).

10. 

End of vent pipe must be 

fl

 ush with inside face of 

chimney 

fl

 ue. Use sealed-in thimble for chimney 

connection.

11. 

Fasten sections of vent pipe with sheet metal screws to 

make piping rigid. Use stovepipe wires to support pipe 

from above.

12. 

Do not connect to 

fi

 replace 

fl

 ue.

13. 

Do not install damper on this boiler.

 WARNING

Boiler and venting installations shall be performed 

by a quali

fi

 ed service agent and in accordance with 

the appropriate manual. Installing or venting boiler 

or other gas appliance with improper methods or 

materials may result in serious injury or death due 

to 

fi

 re or to asphyxiation from poisonous gases such 

as carbon monoxide with is odorless and invisible.

!

     

 WARNING

Do not connect boiler to any portion of mechanical 

draft system operating under positive pressure.

!

     

Figure 11  - Combustion Air Fitting

Horizontal Venting requires 

fi

 eld supplied appliance adapter 

for the boiler 

fl

 ue outlet.  

Boiler is provided with a 3” vent connection, 3” x 4” 

increaser must be 

fi

 eld sourced for chimney application. 

This does not mean that the connection to the chimney will 

always be 4”.

Содержание CHB-100

Страница 1: ...MOUNTED GAS BOILER INSTALLATION OPERATION MAINTENANCE MANUAL P N 240010633 Rev B 07 17 2014 Model CHB 100 CHB 130 Manufactured for ECR International Inc 2201 Dwyer Avenue Utica NY 13501 web site www ecrinternational com ...

Страница 2: ... 1 Overall Dimensions 7 Gas Inlet 3 4 FPT 10 System Delivery 1 MPT 11 System Return 1 MPT 209 Hot Water Tank Delivery 3 4 Capped 210 Hot Water Tank Return 3 4 Capped BSPT To NPT Adapters Included 2 DIMENSIONS ...

Страница 3: ...t Piping Category I Chimney Vent 15 6 Combustion Air And Vent Piping of direct vent and Category III 17 7 Gas Supply Piping 22 8 Electrical Connections 23 9 Start Up Procedure 24 10 Operating Instructions 26 11 General Maintenance And Cleaning 32 12 Ratings And Capacities 33 13 Trouble Shooting 36 Wiring diagram 37 Repair Parts List CHB 100 38 Repair Parts List CHB 130 44 ...

Страница 4: ... only active with the optional water tank sensor connected 1 2 The unit MUST NOT Directly heat potable water Heat water with non hydronic heating system chemicals present example swimming pool water Exceed 185 F 85 C system design temperature Exceed 43 5 PSIG 1 3 Operational Features Modulating 3 1 turn down Integral Dual Limit Information and specifications outlined in this manual in effect at th...

Страница 5: ...injury Read this manual and understand all requirements before beginning installation 2 3 Installation shall conform to requirements of authority having jurisdiction or in absence of such requirements United States National Fuel Gas Code ANSI Z223 1 NFPA 54 National Electrical Code NFPA 70 Canada Natural Gas and Propane Installation Code CAN CSA B149 1 Canadian Electrical Code Part I Safety Standa...

Страница 6: ...Figure 2 Component Listing 6 3 GENERAL VIEW AND MAIN COMPONENTS ...

Страница 7: ...ating circulating pump 36 Automatic Air Vent 44 Gas Valve 81 Ignition and Detection Electrode 95 3 Way Diverter Valve 114 Water Pressure Switch 209 Hot Water Tank Delivery 210 Hot Water Tank Return 278 Double Sensor High Limit NTC 297 Air Pressure Switch 364 Condensation Coupling LBS Kg Unit Weight CHB 100 61 27 5 CHB 130 65 29 5 Shipping Weight CHB 100 65 29 5 CHB 130 69 31 5 7 3 GENERAL VIEW AND...

Страница 8: ...moval Screw Locations Figure 4 Pivot Jacket and Raise to Remove WARNING Fire explosion asphyxiation and electrical shock hazard Disconnect electrical power supply and turn off gas at shutoff valve before attemting to remove boiler jacket Failure to follow these instructions could result in death or serious injury 8 3 GENERAL VIEW AND MAIN COMPONENTS ...

Страница 9: ... service or from safety relief valve discharge See section 5 Access to system water piping gas supply and electrical service See sections 5 7 and 8 Clearances to combustible materials and service clearances See Table 1 and figure 5 The boiler must not be installed on carpeting A D F L O O R F F Boiler Side View Boiler Front View F B C Front A TABLE 1 BOILER CLEARANCES Dimension Combustible Materia...

Страница 10: ...supporting boiler weight plus 60 lbs 28 kg See page 7 Wall mount bracket has 2 slots spaced at 9 23 5cm on center Attach wall mount bracket level on wall Boiler must engage with wall mount bracket See figure 6 CAUTION Boiler weight exceeds 75 pounds 34 kg Do not lift boiler onto wall without assistance NOTICE Lift boiler using chassis Using front jacket vent piping water or gas fittings to lift bo...

Страница 11: ... additives inhibitors and anti freeze fluids can be used only if manufacturer guarantees they are suitable for use in heating systems and they do not cause damage to heat exchanger or other components and or materials of boiler and system Use of generic chemicals not specifically suitable for use in heating systems and or incompatible with boiler materials and system is forbidden Conditioning chem...

Страница 12: ...mance Chart System piping connected to heating coils located in air handling unit exposed to refrigerated air circulation Install flow control valves or other automatic means to prevent gravity circulation of boiler water during cooling cycle 5 4 Storage Tank Connection For Domestic Hot Water Production Unit s electronic board is arranged for managing an external storage tank for domestic hot wate...

Страница 13: ...d reducing safety relief valve relieving capacity below minimum relief valve capacity stated on rating plate Run pipe as short and straight as possible to location protecting user from scalding and properly drain piping Install union if used close to safety relief valve outlet Install elbow s if used close to safety relief valve outlet and downstream of union if used Terminate pipe with plain end ...

Страница 14: ...IC PIPING 8 Domestic Hot Water Outlet 9 Domestic Cold Water Inlet 10 Heating System Supply 11 Heating System Return 95 Diverter Valve 209 Hot Water Tank Delivery 210 Hot Water Tank Return Figure 10 Hydronic Piping ...

Страница 15: ...ld run as directly as possible with as few elbows as possible 7 Common venting shall not be allowed Boiler and other certified appliances appliances can share same chimney vent Consult appropriate Vent Sizing Tables in National Fuel Gas Code for specific requirements of multiple appliance venting 8 Boiler is only appliance connected to vent Type B vent pipe is recommended for vent connector 9 Slop...

Страница 16: ...e common venting system 3 Visually inspect the venting system for proper size and horizontal pitch and determine there is no blockage or restriction leakage corrosion and other deficiencies which could cause an unsafe condition 4 Insofar as is practical close all building doors and windows and all doors between the space in which the appliances remaining connected to the common venting system are ...

Страница 17: ...pe passing through non combustible walls D The venting system shall terminate at least 3 feet 0 9m above any forced air inlet located within 10 feet 3m The venting system shall terminate at least 4 feet 1 2m below 4 feet 1 2m horizontally from or 1 foot 300 mm above any door window or gravity air inlet into any building The bottom of the vent shall be located at least 12 inches 300mm above grade T...

Страница 18: ...ure that the vent pipe is properly pitched away from the boiler with no low spots so that condensate in the vent will drain away from the boiler An insulated enclosure or chase with access for inspection and servicing of the vent may be required to prevent freezing of liquid condensate Consult the vent pipe manufacturer s instructions for specific guidelines 11 At beginning of each heating season ...

Страница 19: ...irements between connection indoor spaces All Outdoor Air Provide permanent opening s communicating directly or by ducts with outdoors Two Permanent Opening Method Provide opening commencing within 12 inches of top and second opening commencing within 12 inches of bottom enclosure Direct communication with outdoors or communicating through vertical ducts Provide minimum free area of 1 in2 per 4 Mb...

Страница 20: ...TION AIR AND VENT PIPING Combustion Air Venting Figure 12 Horizontal Venting Clearances Figure 13 Two Pipe Venting NOTICE Maintain 12 30cm US 18 46cm Canada clearance above highest anticipated snow level or grade ...

Страница 21: ... Venting Figure 15 Chimney Venting with Outside Air Single Wall NOTICE Refer to section 6 1 numbers 3 through 12 page 15 of this manual for proper installation DIRECT VENT BOILER Boiler constructed and installed so all combustion air is derived directly from outdoors and all vent gases are discharged to outdoors See Figure 15 ...

Страница 22: ...ighbor s phone Follow gas supplier s instructions If you cannot reach your gas supplier call the fire department Figure 16 Manual Main Gas Shutoff Valve Outside Boiler Jacket With Manufacturer Suggested Piping With Drip Leg Manufacturer suggested gas piping with drip leg Gas Supply Pressure Natural Gas Min Max 3 5 w c 0 7 kPa 14 w c 3 3 kPa Table 6 Gas Supply Pressure DANGER Fire Hazard Do not use...

Страница 23: ...do so could result in death or serious injury 8 3 Central Heating Thermostat A Use thermostat or boiler system control with dry contacts rated 0 5 amps 120 VAC Boiler control does not provide 24 VAC power to central heating thermostat Do not use to power 24VAC thermostat B Locate and install thermostat per manufacturer s instructions Maximum wire length is 330 ft 100m for 22 ga wire C Connect wire...

Страница 24: ... antifreeze water solution if used See antifreeze information Section 5 3 page 11 Purge air from boiler using air vent Purge air from system piping Inspect system piping and boiler connections Repair any leaks immediately Activate all heating zones and calls for heat including CH calls and DHW calls if available Do not open gas shutoff valve until all air is purged from system 9 3 Burner Pressure ...

Страница 25: ...p of the boiler one for venting and the other for combustion air To sample Open the air vent outlet plug Insert probes all the way in Turn on TEST mode wait 10 minutes for boiler to stabilize Take measurement Vent Gases Test Port Combustion Air Test Port A Pressure point upstream B Pressure point downstream C Modureg electrical connection D Protection cap E Minimum pressure adjustment F Modureg G ...

Страница 26: ...ghts the burner Do not try to light burner by hand Turn gas shutoff valve to closed position Handle should be perpendicular to gas pipe Wait 5 minutes for any gas to clear Smell for gas including near floor If you smell gas STOP Follow instructions on this page What To Do If You Smell Gas If you do not smell gas go to next step Turn gas shutoff valve to open position Handle should be parallel to g...

Страница 27: ...reeze system does not work when power and or gas to the unit are turned off To avoid damage caused by freezing during long idle periods in winter it is advisable to drain all water from the boiler DHW circuit and system or drain just the DHW circuit and add a suitable antifreeze to the heating system See Section 5 3 page 11 10 OPERATING INSTRUCTIONS 10 3 Checks During Operation Boiler is arranged ...

Страница 28: ...oiler will be immediately ready to operate whenever indirect tank sensor or room thermostat demand Summer Winter Switch over NOTICE Activating this button will keep your boiler from operating Verify that boiler is not required to run Domestic Hot Water DHW needs Press the button for 2 seconds Display will activate Summer symbol see item 10 on the control panel display If optional tank sensor is in...

Страница 29: ...cific compensation curve With Sliding Temperature adjustment the temperature set with the heating buttons details 3 and 4 on control panel display become the maximum system delivery temperature Manufacture recommends setting the maximum value to allow system adjustment throughout its useful working range Boiler must be adjusted at time of installation by qualified service agent Adjustments can be ...

Страница 30: ...c Hot Water Temperature Adjustment can be made from the boiler control panel Summer Winter Switchover Summer mode has priority over a possible heating demand Eco Comfort Selection On disabling DHW from the menu the boiler selects the Economy mode In this condition the button 7 from control panel display is disabled On enabling DHW from menu the boiler selects the Comfort mode In this condition it ...

Страница 31: ...ssure is restored the boiler will activate the 120 second air venting cycle indicated on the display by FH TEST mode heating power 100 Press the heating buttons simultaneously for 5 seconds to turn on TEST mode The boiler will ignite at the maximum heating power set as described in the following paragraph On the display the heating and tap water symbols will blink alongside it will show the heatin...

Страница 32: ...d from factory and require no further lubrication Lubricate field sourced pumps and or motors according to pump and or motor manufacturer s instruction Check following components are operating properly and are free of blockages or obstructions air vent check air inlet for blockage and clean as required check boiler for any sign of leaks Check heating system expansion tank Check the Air pressure tu...

Страница 33: ...33 12 RATINGS AND CAPACITIES ...

Страница 34: ...thority having jurisdiction for installations above 4500 feet 1350 m above sea level 34 SEA LEVEL RATINGS NATURAL AND PROPANE GASES Size Boiler Input Rate MBH 1 Heating Capacity MBH 1 2 Net AHRI Rating Water MBH 1 3 AFUE 2 Maximum Minimum CHB 100 100 31 5 85 73 0 85 CHB 130 130 43 5 110 96 0 85 1 1000 Btu hr British Thermal Units Per Hour 2 Heating Capacity and AFUE Annual Fuel Utilization Efficie...

Страница 35: ...d Gas Pressure W C 0 0 1 0 2 0 3 0 4 0 5 0 6 0 7 0 8 0 9 0 10 0 0 00 2 00 4 00 6 00 8 00 14 00 16 00 20 00 Water Flow GPM Pump Head feet w c 18 00 12 00 10 00 3 2 1 Losses of load head of circulators A Boiler losses of head 1 2 3 Circulator speed ...

Страница 36: ...t it is clean A06 No flame after the ignition stage Low pressure in the gas system Check the gas pressure Burner minimum pressure setting Check the pressures F10 Delivery sensor 1 fault Sensor damaged Check the wiring or replace the sensor Wiring shorted Wiring disconnected F11 DHW sensor fault Sensor damaged Check the wiring or replace the sensor Wiring shorted Wiring disconnected F14 Delivery se...

Страница 37: ...lating pump 42 DHW temperature sensor see kit 44 Gas valve 47 Modulation Regulator 24V 72 Room thermostat field sourced 81 Ignition detection electrode 114 Water pressure switch 138 External probe not fitted 155 Hot water tank temperature probe field sourced 278 Double sensor Safety Heating 297 Air pressure transducer 370 Low Water Cutoff LWCO field sourced Important Before connecting the room the...

Страница 38: ...KEY Part Number Description Qty A01 FE3980B830 CASING CTR 1 38 REPAIR PARTS LIST CHB 100 ...

Страница 39: ... FE3980C200 KIT CONTROL BOX 1 B02 FE3980B850 KIT CONTROL BOARD DBM34 2 B03 FE3980C210 KIT FRONT COVER CTR 1 B04 FE3980B840 KIT PRESS TEMP GAUGE 1 B05 FE3980C860 KIT WIRING 1 B06 FE3980C220 KIT MONO CABLE EL 1 39 REPAIR PARTS LIST CHB 100 ...

Страница 40: ...40 REPAIR PARTS LIST CHB 100 ...

Страница 41: ...50 KIT 3 WAY VALVE 1 C07 FE3980C060 KIT MOTOR 3 WAY VALVE TP 1 C08 FE3980B890 KIT PUMP FX3 FP 1 C09 FE3980B900 KIT AIR SEPARATOR 5 C10 FE3980C070 KIT WATER PRESSURE SWITCH 1 C11 FE3980C080 KIT X10 N R BYPASS VALVE 1 C12 FE3980B910 KIT 3 4 SAFETY VALVE 1 C13 FE3980B920 KIT NPT ADAPTERS 1 P01 FE34226300 CH FLOW PIPE 1 P02 FE34225470 CH RETURN PIPE 1 P03 FE3841B170 BYPASS PIPE 1 41 REPAIR PARTS LIST ...

Страница 42: ...42 REPAIR PARTS LIST CHB 100 ...

Страница 43: ...mm NG 1 D08 FE3980C300 KIT 11 INJECTOR 0 85mm LP 2 D09 FE3980C120 IGNITION ELECTRODE 17 D10 FE3980C180 KIT PLUGS CASING 17 D11 FE3980C310 KIT COMBUSTION CHAMBER INSULATION SR AEO4 1 D12 FE3980B960 GAS VALVE VGU 54S 1 D13 FE3980C170 PRESSURE TRANSDUCER 1 D14 FE3980C190 COUPLING CONDENSATION 1 D15 FE3980B970 WALL MOUNT BRACKET 1 D16 FE3980B980 KIT VENT ADAPTERS FM 1 D17 FE3980D800 KIT AIR PRESSURE T...

Страница 44: ...KEY Part Number Description Qty A01 FE3980B830 CASING CTR 1 44 REPAIR PARTS LIST CHB 130 ...

Страница 45: ... FE3980C200 KIT CONTROL BOX 1 B02 FE3980B850 KIT CONTROL BOARD DBM34 2 B03 FE3980C210 KIT FRONT COVER CTR 1 B04 FE3980B840 KIT PRESS TEMP GAUGE 1 B05 FE3980B860 KIT WIRING 1 B06 FE3980C220 KIT MONO CABLE EL 1 45 REPAIR PARTS LIST CHB 130 ...

Страница 46: ...46 REPAIR PARTS LIST CHB 130 ...

Страница 47: ...06 FE3980C050 KIT 3 WAY VALVE 1 C07 FE3980C060 MOTOR 3 WAY VALVE TP 1 C08 FE3980B890 PUMP FX3 FP 1 C09 FE3980B900 KIT AIR SEPARATOR 5 C10 FE3980C070 WATER PRESSURE SWITCH 1 C11 FE3980C080 KIT X10 N R BYPASS VALVE 1 C12 FE3980B910 KIT 3 4 SAFETY VALVE 1 C13 FE3980B920 KIT NPT ADAPTERS 1 P01 FE34226280 CH FLOW PIPE 1 P02 FE34202130 CH RETURN PIPE 1 P03 FE3841B170 BYPASS PIPE 1 47 REPAIR PARTS LIST C...

Страница 48: ...48 REPAIR PARTS LIST CHB 130 ...

Страница 49: ... NG 1 D08 FE3980B950 KIT 15 INJECTOR 0 85mm LP 2 D09 FE3980C120 KIT IGNITION ELECTRODE 17 D10 FE3980C180 KIT PLUGS CASING 17 D11 FE3980C320 COMBUSTION CHAMBER INSULATION SR AEO7 1 D12 FE3980B960 KIT GAS VALVE VGU 54S 1 D13 FE3980C170 KIT PRESSURE TRANSDUCER 1 D14 FE3980C190 KIT COUPLING CONDENSATION 1 D15 FE3980B970 WALL MOUNT BRACKET 1 D16 FE3980B980 KIT VENT ADAPTERS FM 1 D17 FE3980D800 KIT AIR ...

Страница 50: ...NOTES 50 ...

Страница 51: ...NOTES 51 ...

Страница 52: ...ECR International Inc 2201 Dwyer Avenue Utica NY 13501 web site www ecrinternational com ...

Отзывы: