Figure 6 - Wall Mounting Bracket
10
4 - LOCATING BOILER
4.2
Pre-pipe supply and return water connections
with factory
fi
ttings before wall mounting.
4.3
Wall Mounting
Mount boiler on wall using wall mounting bracket included
with unit.
• Structure must be capable of supporting boiler weight
plus 60 lbs (28 kg). See page 7.
• Wall mount bracket has 2 slots, spaced at
9¼”
(23.5cm) on center
.
• Attach wall mount bracket level on wall.
• Boiler must engage with wall mount bracket. See
fi
gure 6.
CAUTION
Boiler weight exceeds 75 pounds (34 kg). Do not
lift boiler onto wall without assistance.
!
!
NOTICE
Lift boiler using chassis. Using front jacket, vent
piping, water or gas
fi
ttings to lift boiler may cause
damage to the boiler.
9¼”
(23.5cm)
2
⅜
”
(2.4cm)
2
⅜
”
(2.4cm)
Содержание CHB-100
Страница 6: ...Figure 2 Component Listing 6 3 GENERAL VIEW AND MAIN COMPONENTS ...
Страница 33: ...33 12 RATINGS AND CAPACITIES ...
Страница 38: ...KEY Part Number Description Qty A01 FE3980B830 CASING CTR 1 38 REPAIR PARTS LIST CHB 100 ...
Страница 40: ...40 REPAIR PARTS LIST CHB 100 ...
Страница 42: ...42 REPAIR PARTS LIST CHB 100 ...
Страница 44: ...KEY Part Number Description Qty A01 FE3980B830 CASING CTR 1 44 REPAIR PARTS LIST CHB 130 ...
Страница 46: ...46 REPAIR PARTS LIST CHB 130 ...
Страница 48: ...48 REPAIR PARTS LIST CHB 130 ...
Страница 50: ...NOTES 50 ...
Страница 51: ...NOTES 51 ...
Страница 52: ...ECR International Inc 2201 Dwyer Avenue Utica NY 13501 web site www ecrinternational com ...