background image

11

4 - CONNECTING SUPPLY AND RETURN PIPING

Figure 3 - Temperature Pressure Gauge

Verify clean water supply is available to water inlet valve. 

Install sand strainer when water supply is from a well or 

pump.
Install hot water boiler above radiation level or as required 

by Authority having jurisdiction. 

Periodic inspection is necessary, as is flushing of float type 

devices, per manufacturers specific instruction.
Boiler is factory equipped with low water cutoff.

FOR USE WITH COOLING UNITS

A. Boiler used in connection with refrigeration system, must 

be installed so that chilled medium is piped in parallel 

with heating boiler. Appropriate valves must be used to 

prevent chilled medium from entering heating boiler. See 

Figure 5 page 12.

B. Boiler connected to heating coils located in air handling 

units where they may be exposed to refrigerated air 

circulation, piping system shall be equipped with flow 

control valves or other automatic means to prevent 

gravity circulation of boiler water during cooling cycle. 

LOW WATER TEMPERATURE AND LARGE WATER 

CONTENT SYSTEM 

(See Figures 6 and 7, Page 13.)

Significant condensation may form in boiler and/or venting 

system if boiler is operated for long period of time with 

return temperatures of less than 120° F.

Condensate is corrosive and can cause severe damage to 

boiler and venting system. Minimum design return water 

temperature to prevent condensation in boiler and venting 

is 120°F.  Minimum high limit setting is 140°F.

1. 

Boiler used in heating system where design water 

temperatures below 140°F are desired (e.g. radiant 

floor heating), 4-way mixing valve or suitable 

alternative is required to prevent low temperature 

return water from entering boiler.  Follow mixing valve 

manufacturer’s instructions.

2. 

Boiler connected to system having large water content 

(such as former gravity system), install system bypass. 

See Figures 6 and 7, page 13.

3. 

If boiler water reset control is used to operate boiler, 

minimum reset supply water temperature setpoint 

must be at least 140°F, unless mixing valve is used as 

in (1) above.

1. 

Boiler is shipped assembled. Install discharge piping 

from safety relief valve. See Warning, Page 9.

2. 

Install temperature pressure gauge.

• Apply pipe sealant to threads on shaft of gauge.
• Thread gauge into supply water tee. See Figure 3.

NOTICE

Do not tighten gauge by hand. Gauge should be 

tightened using crescent wrench or 9/16” open end 

wrench. See Figure 3.

3. 

Connect supply and return lines to boiler. Connections 

may require additional fittings and parts, as shown on 

diagrams.  

 WARNING

Burn and scald hazard.  Safety relief valve could 

discharge steam or hot water during operation.  

Install discharge piping per these instructions. Failure 

to follow these instructions could result in death or 

serious injury.

!

  

PN 240013090 REV. C [10/01/2021]

Содержание Dunkirk WPSB 3 Series

Страница 1: ...3D WPSB 3DP WPSB 4D WPSB 4DP WPSB 5D WPSB 5DP WPSB 6D WPSB 6DP WPSB 7D WPSB 7DP WPSB 8D WPSB 8DP WPSB 9D WPSB 9DP Tested For 50 psi ASME Working Pressure Manufactured by ECR International Inc 2201 Dwy...

Страница 2: ...n this manual in effect at the time of printing of this manual ECR International Inc reserves the right to discontinue change specifications or system design at any time without notice and without inc...

Страница 3: ...7 Vent Damper Operation 17 8 Gas Supply Piping 18 9 Electrical Wiring 19 10 Wiring Diagram 20 11 General Instructions 21 12 Lighting Instructions 22 13 Operating Your Boiler 23 14 Service Hints 26 15...

Страница 4: ...Dimensions 1 1 4 RETURN PN 240013090 REV C 10 01 2021 Dimensions BOILER MODEL NUMBER DIMENSIONS INCH Boiler Volume Gallon FLUE DIAMETER A WIDTH WPSB 3 5 11 3 30 WPSB 4 6 14 4 60 WPSB 5 6 17 6 00 WPSB...

Страница 5: ...and all requirements before beginning installation FOR YOUR SAFETY READ BEFORE OPERATING Hot Water Can Scald Water heated to temperature for clothes washing dish washing and other sanitizing needs can...

Страница 6: ...be found on the NIOSH website https www cdc gov niosh topics silica NIOSH approved respirators manufacturers and phone numbers are also listed on this website Wear long sleeved loose fitting clothing...

Страница 7: ...ting and other performance criteria with the gas manifold and control assembly on the boiler per the latest revision of ANSI Z21 13 CGA 4 9 5 Install boiler such that gas ignition system components ar...

Страница 8: ...oric acid muriatic acid Cements adhesives and glues Photo processing plants Garages with workshops Furniture refinishing areas and establishments Laundry Chemicals Laundry detergents bleaches fabric s...

Страница 9: ...iping Size and arrange discharge piping to avoid reducing safety relief valve relieving capacity below minimum relief valve capacity stated on rating plate Run pipe as short and straight as possible t...

Страница 10: ...herwise damage and or malfunction could be caused Recommended water quality is o Hardness Less than 150 mg L o Acidity level 7 8 pH o Sediments Particle size less than 50 micron If the water quality i...

Страница 11: ...damage to boiler and venting system Minimum design return water temperature to prevent condensation in boiler and venting is 120 F Minimum high limit setting is 140 F 1 Boiler used in heating system w...

Страница 12: ...12 Figure 5 Chilled Water Piping Figure 4 Typical Hot Water Piping 4 CONNECTING SUPPLY AND RETURN PIPING CIRCULATOR PUMP PN 240013090 REV C 10 01 2021...

Страница 13: ...Bypass Piping Circulator On Supply Figure 7 Bypass Piping Circulator On Return Bypass Piping Required For High Mass Large Water Content Systems 4 CONNECTING SUPPLY AND RETURN PIPING PN 240013090 REV C...

Страница 14: ...60 Volume 21 ft3 ACH x Total Input Mbh C Refer to National Fuel Gas Code for opening requirements between connected indoor spaces All Outdoor Air Provide permanent opening s communicating directly or...

Страница 15: ...ent pipe should have any dips or sags Requirements 3 Boiler series is classified as a Category I Vent installation shall be in accordance with Venting of Equipment of the National Fuel Gas Code ANSI Z...

Страница 16: ...ances remaining connected to it At time of removal of existing boiler following steps shall be followed with each appliance remaining connected to the common venting system placed in operation while o...

Страница 17: ...ition Turn thermostat or controller down again and check damper position indicator returns to closed position Vent Damper Manual Operation Vent damper may be placed in open position to permit burner o...

Страница 18: ...regulation should be used by propane installer Propane gas piping should be checked out by propane installer CHECKING GAS PIPING DANGER Fire Hazard Do not use matches candles open flames or other meth...

Страница 19: ...ighting fixtures televisions a fireplace or a chimney 4 Check thermostat operation by raising and lowering thermostat setting as required to start and stop the burners 5 Instructions for the final adj...

Страница 20: ...2 Integrated High Limit Electronic Ignition Control WARNING Modification substitution or elimination of factory equipped supplied or specified components may result in personal injury or loss of life...

Страница 21: ...p at highest unit in system If your units have automatic vents manual venting is unnecessary but it will speed up the proper filling of your system If your system is closed expansion tank system you m...

Страница 22: ...ly and turn clockwise to OFF Do not force WARNING If you do not follow these instructions exactly a fire or explosion may result causing property damage personal injury or loss of life This appliance...

Страница 23: ...ostat to lowest setting for one minute then back to normal setting ADJUST PILOT BURNER Pilot flame should surround 3 8 to 1 2 of the pilot sensor See Figure 14 If flame needs adjusting do it as follow...

Страница 24: ...t shuts off gas supply to burners Turn your thermostat up to call for heat and let boiler run until temperature of water reaches limit setting Gas valve should shut off and circulator running until th...

Страница 25: ...rioritized If I1 I2 is not used turn Economy Feature OFF House will not get or stay warm 1 Check for air bound radiators 2 Check thermostat settings including heat anticipator settings common on non d...

Страница 26: ...ol terminals and wire joints Rollout switch blown Have your service agent check heat exchanged for blockage Replace rollout switch with exact replacement Blocked vent blown Have your service agent che...

Страница 27: ...and piping should be checked at least once a season If vent piping shows any sign of leaking replace immediately WATER SYSTEM If system is to remain out of service during freezing weather always drain...

Страница 28: ...ter than calculated heat loss of the building Consult manufacturer before selecting boiler for installations having unusual piping and pickup requirements BOILERS FOR USE AT HIGH ALTITUDE Boiler is fa...

Страница 29: ...It will remain lit until the water temperature falls 10 The Fuel SmartHydroStat prevents burner operation while this LED is on See Differential explanation on page 6 of Hydrolevel Manual LWCO ACTIVE I...

Страница 30: ...position restore to correct position If this LED is blinking and the burner is not firing Make sure the plug connection or jumper on boilers where vent damper plug is not used is secure Make sure the...

Страница 31: ...ting a Check pilot flame Verify it is blue steady and envelops 3 8 to 1 2 in 10 to 13 mm of flame rod See Figure A 1 for possible flame problems and causes b If necessary adjust pilot flame by turning...

Страница 32: ...d position 4 Return thermostat to desired position 5 Place vent damper in open position to permit burner operation by using HOLD DAMPER OPEN switch located on damper controller 6 Thermostat controls b...

Страница 33: ...ross orange and yellow wires in Molex plug see Figure 4 This will create bypass of the damper boiler should then ignite If boiler ignites Go to section B 4 Vent Damper Troubleshooting Guide If boiler...

Страница 34: ...or heat 1 Thermostat not calling for heat 2 Burned out heat anticipator 3 Loose or broken connections 4 Off On operating limit pressure control or low water cut off 5 Off On blocked vent switch or fla...

Страница 35: ...35 Company Address Phone Company Name Tech Initials Service Performed Date PN 240013090 REV C 10 01 2021...

Страница 36: ...tion THIS OVERRIDE MUST NOT BE USED UNLESS AT LEAST ONE OF THE FOLLOWING CONDITIONS IS TRUE An external energy management system is installed that reduces the boiler water temperature as the heating l...

Отзывы: