Installation, Operation, And Service Instructions

 

 

5.

 

Attach one door bracket (18) to the bottom of both the left and right side jacket 
panels.  Use two 8-32x1/2” screws (19) and nuts (20) to assemble each door 
bracket. 

6.

 

Attach the left and right side jacket panels to the boiler.  The front end of the right 
side panel is attached to the hinge using 10-24x3/4 screws (21).  The front end of 
the left side panel is also attached to the front jacket mounting bracket (23) using 
10-24x3/4 screws.  The rear of both the left and right panels are attached to the 
rear panel using #10x1/2 sheet metal screws. 

7.

 

Install a #10x1/2 sheet metal screw into the remaining hole in the rear of the right 
side jacket panel which secures the rear of the wireway. 

8.

 

Attach the top jacket panel (5) using four #10x1/2 sheet metal screws. 

9.

 

Attach the flue collector cover (4) using four #10x 1/2 sheet metal screws. 

10.

 

Press the door switch (16) into the door switch bracket (17).  Connect the door 
switch leads to the switch (it does not matter which wire is connected to which 
side of the switch).  Attach the door switch bracket to the right side jacket panel 
using a 10-24x3/4 machine screw (21). 

11.

 

Mount the door knobs (25) to the front panel (24) using two 8-32x1/4 screws (26). 

12.

 

Mount the front jacket panel on the boiler. 

13.

 

Connect the loose end of the 6” conduit assembly to the limit control.  Connect 
the black wire to terminal “B1” and the white wire to terminal “B2”. 

 
 

Boiler Tube Insert Assembly 

 

 

 
 
 
 

Install Stainless Steel Tube Insert with external stitch weld touching 1

st

 

water section high point of casting and the dam located at the 6 O’clock 
position. (bottom of boiler).  When boiler door is closed, stainless tube 
will inbed into door refractory at least 1/4”. 

Dam

Содержание OWB-15

Страница 1: ...with proper filtration to the inside supply tank is acceptable 6 The fuel pump included with burner is to be mounted at tank level or below PUMP MUST BE MOUNTED HORIZONTAL AND LOCATED NEXT TO WASTE O...

Страница 2: ...ked in the wirebound crate Install in tappings provided at the top rear of the boiler as shown in Figure 13 Figure 13 b Take the boiler drain from the same carton and connect it to the 3 4 inch openin...

Страница 3: ...he 2 x 1 1 4 inch bushing which is supplied in the boiler supply and return ports and must provide his own boiler drain and circulating pump 1 Accessories for Boilers OWB 35 and OWB 50 Figure 14 Suppl...

Страница 4: ...em is to comply with ASME code 1 Backflow Preventer Required by many State and local codes 3 Additional circulating pumps or zone valves may also be required if the system is to be multi zone or if it...

Страница 5: ...e pressure reducing fill valve may be piped with 1 2 inch pipe Figure 17 Closed Type Expansion Tank Supply to System Shutoff Valve Fill Valve Cold Water Feed Return From System Circulation Pump Drain...

Страница 6: ...piped to a drain or must terminate 6 above floor to eliminate damage to the structure or personal injury It must not be piped to a point where freezing might occur 1 MULTIPLE ZOINING WITH ZONE VALVES...

Страница 7: ...drop below about 135 Degree F for an extended period of time Return water temperatures of 130 Degree F or lower will cause condensation on the exterior surface of the heat exchanger and corrosion and...

Страница 8: ...systems that employ outdoor reset control present a potential problem with low return water temperatures and condensation The boiler must be protected from condensation in such cases by using a by pa...

Страница 9: ...r output is available to recover the storage tank quickly and should be used where supply of domestic hot water on demand is critical For this application use a full throated valve with a minimum pres...

Страница 10: ...t for heating Because the tank is usually close to the boiler the pressure drop through the coil circuit will generally be less than through a heating zone circuit which will provide some measure of p...

Страница 11: ...gravity circulation Install a balancing valve in each zone and adjust so that flow in each zone is about the same see Figure 24 While this basic system does not provide priority for domestic hot water...

Страница 12: ...iler shall be not less than 1 8 GPM for each 100 000 BTU HR of gross boiler output Size blend pump accordingly See Table 3 Blend Pump Primary Secondary Pump Boiler Model GPM GPM OWB 9 OWB 15 OWB 25 OW...

Страница 13: ...e 27 Blend Pump Check Valve System Supply System Circulator Pressure Reduction Valve Backflow Preventer From City Water Supply Expansion Tank System Return Amtrol 720 Air Eliminator or Equal To Size B...

Страница 14: ...REVERSE RETURN FLOW WITH BLEND PUMP Figure 28 Blend Pump Check Valve System Supply System Circulator Pressure Reduction Valve Backflow Preventer From City Water Supply Expansion Tank System Return Amt...

Страница 15: ...t fill in the space between the burner blast tube and the insulation block on the inside of the burner door with refractory mix provided Burner Mounting Figure 29 OWB 35 and OWB 50 Burner Mounting Boi...

Страница 16: ...on top of wraparound insulation This will provide double thick insulation on top of the boiler block 4 Remove flue collector clean out covers 62 5 Push the two smaller pieces of insulation 60 onto th...

Страница 17: ...WB 9 OWB 15 and OWB 25 Jacket Installation Instructions 1 Attach the rear jacket mounting brackets 7 to rear tie rod ends on back of boiler using the 12mm nut 9 provided on the end of each tie rod 2 A...

Страница 18: ...nel 5 using four 10x1 2 sheet metal screws 9 Attach the flue collector cover 4 using four 10x 1 2 sheet metal screws 10 Press the door switch 16 into the door switch bracket 17 Connect the door switch...

Страница 19: ...C2 on the L8148A are not used A DPST Honeywell RA832A may be substituted in place of the R845A using the X and X terminals in place of the 5 and 6 terminals on a R845A A call for heat from any thermos...

Страница 20: ...nnections so that any zone valve that opens will also start the circulator and fire the boiler assuming the high limit is not open Zone valve terminal TH TR has no internal connection on the zone valv...

Страница 21: ...ATER BLOCK Fuse Power Switch BLK BLK WHT WHT RED WHT WHT WHT RED BLU RED Power Plug Looking at Terminal Side BLK Oil Valve BLK GRN Power Socket Electrical Box Looking at Socket Side Burner Assembly Th...

Страница 22: ...K BLK WHT WHT RED WHT WHT WHT RED BLU RED Power Plug Looking at Terminal Side BLK Oil Valve BLK GRN Power Socket Electrical Box Looking at Socket Side Burner Assembly N H Oil Pump WHT BLK WHT YEL Serv...

Страница 23: ...23 Figure 35 WIRING DIAGRAM ZONE WIRING USING HONEYWELL V8043F VALVES FACTORY BOILER WIRING NOT SHOWN SEE FIGURE 33 OR 34 Figure 36 WIRING DIAGRAM CIRCULATOR ZONE WIRING USING HONEYWELL R845A S FACTO...

Страница 24: ...n exit the system through a hose as in 1 above When system seems to be full and free of air close the drain cock and the shutoff valve on the boiler supply pipe leaving the manual valve on the cold wa...

Страница 25: ...Oil Primary This will allow the burner to run during the pump priming process 9 Priming the oil pump Open bleeder valve one turn until all air is expelled Figure 4 This may need to be done twice to i...

Страница 26: ...ng connections to ensure there are no flue gas leaks Seal any leaks found with High Temperature Silicone Sealant 6 Check flue gas temperature at the test point in the breeching If gross flue gas tempe...

Страница 27: ...ion And Service Instructions 27 Figure 37 Electrode Adjusment Diagram Figure 38 Nozzle Assembly Detail When cleaning inspect all three pieces thoroughly When disassembling and reassembling nozzle keep...

Отзывы: