Light Well Assembly and Installation

1

Remove protective film (if there is any)

Make sure the outward facing flange of each section (that will rest on the curb) is on the top, and 
the inward facing flange (that will support the bottom lens) is on the bottom (doing a dry fit the first 
time to see how the unit should look is recommended).

Before installing any light wells, make sure that all curbs are square over the hole, level at the top 
and plum (the same inside diameter top to bottom), and that there are no obstructions intruding 
into the space that the light well is to occupy. 

If the sections come with pre-attached double-sided tape 
for connecting the light well together, peel the outer cover 
off the tape of one section.

Butt the flat side of another section into the corner of the 
first (and over the tape) making sure the two sections are 
even top and bottom before pressing together.

Some suppliers do not provide pre attached tape. If that is 
the case, the contractor has the option of using #10, 1/2” 
truss washer lath screws with neoprene bonded washer 
(screwing from the outside in), or using their own double- 
sided tape to connect the light well together.

1

2

3

3

TOLL FREE:(888)329-2705   [email protected]   www.eco-smart.com

PAGE 2

Eco-$mart, Inc.

Содержание SunTrackerTwo

Страница 1: ...CIRALIGHT INSTALLATION MANUAL Page 1 SunTrackerTwo Preparation Cutting Holes and Preparing Curbs T G I Or Truss Eco mart Inc TOLL FREE 888 329 2705 FAX 941 377 9460 info eco smart com...

Страница 2: ...this process in each bay that is to contain next skylights 4 You can now proceed with cutting the holes in the roof making and using a 461 2 template can be very helpful 5 Cut away soft existing roofi...

Страница 3: ...MADE CONTRACTOR WILL DETERMINE IF ADDITIONAL ROOF REINFORCING IS REQUIRED INDICATE SAME ON INSTALLATION DRAWING Template for Roof Openings TOLL FREE 888 329 2705 info eco smart com www eco smart com...

Страница 4: ...l 4 All corners must be square 5 Curb should measure 65 3 4 across the inside diagonal inside corner to inside corner Building the Curb Please Note On a slanted roof the low side of the curb will need...

Страница 5: ...dome light well and lenses Attachment of curbs should meet with all building codes and requirements If roof curbs require additional reinforcing at any opening such details will be indicated and must...

Страница 6: ...TOLL FREE 888 329 2705 info eco smart com www eco smart com PAGE 6 Eco mart Inc...

Страница 7: ...WITH LIGHT WELL LIGHT WELL CURBING INSULATION PER ENERGY CODE REQUIREMENTS FINISHED ROOF DIFFUSER LENS FLAT SKYLIGHT DOME CONTROL UNIT ASSEMBLY WITH SOLAR CELL MIRROR MIRROR BRACKET SKYLIGHT FRAME w F...

Страница 8: ...not damaged by a sudden gust Remove Mirror from tray assembly 6 6 6 6 6 6 6 6 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 Taking care so as not to bend the mirror peel off the protective tape from the re...

Страница 9: ...lastic nuts to the bolts and hand tighten do not use a wrench Please note that the solar panel of the controller faces away from the mirror The blue controller is shipped in it s own box Tighten the s...

Страница 10: ...s will allow the controller to charge properly IMPORTANT Once the controller mirror is in place care should be taken to not leave the unit unattended as long as it remains uncovered Wind can cause the...

Страница 11: ...Assembly and Installation 1 3 This photo sequence is for one piece non adjustable light wells For two piece adjustables see end of manual Eco mart Inc TOLL FREE 888 329 2705 FAX 941 377 9460 info eco...

Страница 12: ...uding into the space that the light well is to occupy If the sections come with pre attached double sided tape for connecting the light well together peel the outer cover off the tape of one section B...

Страница 13: ...ells it is recommended that the bottom lens be put into place from inside the building after the light well is attached this may require a lift 6 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 Repeat this...

Страница 14: ...p When assembled you will have two open ended boxes Measure the correct distance from the top of the curb to where the well is to meet the drop ceiling Slide the upper section of the well non flange s...

Отзывы: