background image

SERVICE RECORD 

 

Appliance Model Serial 
Number 

  

Date of Service: 

  

  

  

ENGINEER DETAILS 

Engineer's Name: (in BLOCK 
CAPITALS) 

  

Engineers Registration 
Number 

 

Engineer's Signature 

  

 

 

Date 

 

 

 

 

COMBUSTION ANALYSIS 

 

  

Cooker 

Boiler 

Pump pressure 

  

 

CO

 

 

CO ppm 

  

 

Flue Gas 
Temperature 

  

 

CO/CO2 

  

 

Efficiency % 

  

 

Engineer's 
Comments: 

  

 

Jet Changed 

 Yes 

Yes 

 
 

PARTS REPLACED:

 

Jets should be changed annually. 
 
 
 
 
 
 
 
 
 
 
 
 
 

Содержание 15/21

Страница 1: ...Eire GB IE Instructions for Use Installation and Servicing This appliance must be installed in accordance with the regulations in force and only used in an adequately ventilated space Please read thes...

Страница 2: ...ime is taken to read these instructions carefully before installation and use of the appliance In order for the warranty to remain valid it is imperative that the appliance be installed in compliance...

Страница 3: ...ended when applicable Children should be supervised at all times if in the vicinity of the cooker In the interest of hygiene and safety the cooker should be kept clean at all times The cooker is desig...

Страница 4: ...when works are complete Always ensure appliance is electrically dead prior to working on the electrics 3 Technical Specification Appliance type Cooker and Space heater Cooker Burner System Eco Flame...

Страница 5: ...ble for deep fat frying shallow frying and boiling The surfaces of the hotplates are ground flat and it is therefore recommended that all utensils used have a solid flat base to come in complete conta...

Страница 6: ...r remains fully functional and in a safe condition 5 0 Delivery and Transport Your Eco Range Cooker is an extremely heavy and solid appliance When attempting to move or transport your cooker please ta...

Страница 7: ...d flue allows the cooker to be placed against an outside wall with either rear or top outlet concentric flue Maximum length of rear flue 500mm Maximum length of top outlet flue 300mm vertical 500mm ho...

Страница 8: ...f 3 drop 6 With suitable material make a good flue hole 7 Fit the terminal to the pipes whilst ensuring the inner pipe has adequate clearance between terminal end and outlet min 50 mm Secure terminal...

Страница 9: ...t go up the chimney have quite a high temperature 200 C 260 C and are made up of a few different types of gases A condensing boiler is designed so that these flue gases pass through a stainless steel...

Страница 10: ...n the boiler is controlled and maintained by the Boiler Control Thermostat located on the boiler control panel TEMPERATURE SETTINGS The Boiler Control Thermostat has a range of 50 C to 80 C The recomm...

Страница 11: ...URNER LOCKOUT The burner has an independent control system Burner Control Box this includes a flame detector Photocell which senses the presence of a flame In the event of a flame failure the burner c...

Страница 12: ...rner should fire normally PLEASE NOTE Should the Burner not start the lockout indicator on the Control Box Burner Reset Button will illuminate again Wait at least 3 minutes and press the Burner Reset...

Страница 13: ...waste drainage system Soil vent stack External Drainage system External condensate absorption point NOTE condensate pipe work must fall at least 50mm per metre towards the outlet ensuring all joints a...

Страница 14: ...RECOMMENDED FLUE POSITION...

Страница 15: ...OIL SUPPLY...

Страница 16: ...oiler must be wired using a double pole isolating switch 230v 50hz fused 5 amps The mains supply must be connected with the boiler dual stat the supply will then continue down to the burner control bo...

Страница 17: ...out debris Clean baffle assembly Pull out inserts from stainless steel heat exchanger and clean before replacing Ensure stainless steel heat exchanger is thoroughly cleaned Empty and clean condensing...

Страница 18: ...BOILER SIZE NO OF INSERTS FROM L H SIDE OF CONDENSER REMAINING TUBES WITHOUT INSERTS 15 21 KW 10 6 1 SET OF BAFFLES 15 21 KW...

Страница 19: ...front A service access space of at least 700mm should be made available at the front of the boiler THE HEARTH The temperature of the surface below the boiler is less than 85 C If the floor under the...

Страница 20: ...to the boiler De pressurise heating system and check expansion vessel pre charge is the same as the cold fill pressure of the heating system Expansion vessel pre charge must not exceed 1 5 bar Remove...

Страница 21: ...al operating temperature Check the smoke reading Measure the Co2 Measure net flue gas temperature Check domestic hot water flow and hot temperature is acceptable to the householder PLEASE NOTE Reducin...

Страница 22: ...n and time clock is calling for heat Mains indicator green should be illuminated If green light is not illuminated and fuse has been checked then heating system charge may be low check black needle on...

Страница 23: ...er using recognised test equipment and that the relevant section of the latest edition of BS 5410 Part 1 is read and fully adhered to The following warranty registration page should be completed by th...

Страница 24: ...NICIANS DETAILS Technician s Name in BLOCK CAPITALS Technician s Competent Persons OFTEC Registration Number Address Town County Postcode Technician s Signature Cooker Boiler Burner pressure psi CO2 C...

Страница 25: ...S Engineer s Name in BLOCK CAPITALS Engineers Registration Number Engineer s Signature Date COMBUSTION ANALYSIS Cooker Boiler Pump pressure CO2 CO ppm Flue Gas Temperature CO CO2 Efficiency Engineer s...

Страница 26: ...S Engineer s Name in BLOCK CAPITALS Engineers Registration Number Engineer s Signature Date COMBUSTION ANALYSIS Cooker Boiler Pump pressure CO2 CO ppm Flue Gas Temperature CO CO2 Efficiency Engineer s...

Страница 27: ...S Engineer s Name in BLOCK CAPITALS Engineers Registration Number Engineer s Signature Date COMBUSTION ANALYSIS Cooker Boiler Pump pressure CO2 CO ppm Flue Gas Temperature CO CO2 Efficiency Engineer s...

Страница 28: ...S Engineer s Name in BLOCK CAPITALS Engineers Registration Number Engineer s Signature Date COMBUSTION ANALYSIS Cooker Boiler Pump pressure CO2 CO ppm Flue Gas Temperature CO CO2 Efficiency Engineer s...

Страница 29: ...S Engineer s Name in BLOCK CAPITALS Engineers Registration Number Engineer s Signature Date COMBUSTION ANALYSIS Cooker Boiler Pump pressure CO2 CO ppm Flue Gas Temperature CO CO2 Efficiency Engineer s...

Страница 30: ...S Engineer s Name in BLOCK CAPITALS Engineers Registration Number Engineer s Signature Date COMBUSTION ANALYSIS Cooker Boiler Pump pressure CO2 CO ppm Flue Gas Temperature CO CO2 Efficiency Engineer s...

Страница 31: ...S Engineer s Name in BLOCK CAPITALS Engineers Registration Number Engineer s Signature Date COMBUSTION ANALYSIS Cooker Boiler Pump pressure CO2 CO ppm Flue Gas Temperature CO CO2 Efficiency Engineer s...

Страница 32: ...S Engineer s Name in BLOCK CAPITALS Engineers Registration Number Engineer s Signature Date COMBUSTION ANALYSIS Cooker Boiler Pump pressure CO2 CO ppm Flue Gas Temperature CO CO2 Efficiency Engineer s...

Страница 33: ...S Engineer s Name in BLOCK CAPITALS Engineers Registration Number Engineer s Signature Date COMBUSTION ANALYSIS Cooker Boiler Pump pressure CO2 CO ppm Flue Gas Temperature CO CO2 Efficiency Engineer s...

Страница 34: ...it is consequently acknowledged that errors and omissions may occur This publication is intended only to assist the reader in the use of our products Eco Range Cookers will not accept any liability fo...

Страница 35: ...Eco Range Cookers 60 Wincheap Canterbury Kent CT1 3RS info ecorangecooker co uk www ecorangecooker co uk...

Отзывы: