background image

   

 

 

Eco Pacific/Super Star- Installation and Service Instructions 20173                 

 

 

 

 

 

 

 

 

 

Table 2:  Dimensions (mm), refer Figure 1, 2 and 6  

Dimensions  /  Model

 

→ 

       

↓ 

SS512 

SS516  and 
HB416 

SS520 and 

HB420 

SS525 

SS530 

A- Width 

360 

360 

437 

585 

585 

B- Depth/Length 

1160 

1160 

1160 

1160 

1160 

C- Height 

450 

450 

450 

450 

450 

D- Flue Collar, mm 

100 

100 

100 

100 

100 

E-  Duct  Connections 
Return/Supply 

300x300 

300x300 

300x300 

350x350 

350x350 

Extra 

Air 

panel 

collars 

NA 

NA 

350x350 

400x400 

400x400 

 

General Requirements 

The installation of this appliance must conform to the following requirements: 

1. 

These installation instructions. 

2. 

The Australian Gas Association Code, AS5601 (old AG601) for installation 

3. 

Local gas fitting regulations. 

4. 

Local building regulations. 

5. 

Local electrical supply authority regulations. 

6.   Fit dedicated circuit breakers in the power line of the heater in the meter box. 

Important Notes 

Only  licensed/AUTHORIZED  PERSONNEL

  must  install  this  appliance  and  must  carry  out 

likewise servicing of this unit. 

Please  note  that  the  manufacturers  reserve  the  right  to refuse  to  attend  the  warranty  service  to 
the unit if the unit is not installed according to the above requirements and if adequate safety and 
accessibility to the unit is not provided on site with stipulated clearances.  

Inspection 

As  soon  as  a  unit  is  received  it  should  be  inspected  for  any  damage  that  may  have  occurred 
during  transit.    If  any  damage  is  evident  it  should  be  noted  on  the 

carrier’s  freight  bill  with 

evidence. 

Location 

The Super Star is an internal/external air heater, designed for installation in either a roof space, or 
in the space underneath a floor, or external to the house- if it is an external unit, with connection 
to  a  warm  air  heating  duct-system.    Refer  to  Table  2  for  general  dimensions.    Although  the 
location is usually predetermined please check with the owner’s or dealer’s installation plans.  If a 
location has not been decided, consideration must be given to the following: 

1.  The  location  must  provide  adequate  structural  support;  space  for  service  access;  and 

clearances for return and supply air duct connections. 

2.  Care  should  be  taken  to  locate  the  unit  and  ductwork  so  that  the  supply  air  does  not  short 

circuit to the return air. 

Содержание Super Star SS Series

Страница 1: ...xternal installations 4 5 4 8 star energy rated DO NOT MODIFY THIS APPLIANCE Manufacturers of High Efficiency Ducted Gas Heaters Evap Coolers and Fresh Air Heat Recovery Ventilators Tel 03 9706 6228 F...

Страница 2: ...fications data 13 Table 2 Dimensions 13 B Service instructions 15 20 Important Notice to Agents Installers and Purchasers DO NOT MODIFY THIS APPLIANCE This appliance must be installed and serviced onl...

Страница 3: ...ve The gas inlet connection is given at the front lower section Access to the fan wheel and motor is achieved on the far right hand side Models These installation instructions cover the Eco Pacific Su...

Страница 4: ...manufacturers reserve the right to refuse to attend the warranty service to the unit if the unit is not installed according to the above requirements and if adequate safety and accessibility to the un...

Страница 5: ...ure 3 Minimum installation clearances Installation Procedure General The following sequence of installation steps is suggested Reference is also made to the Final Checklist 1 Inspect the site for area...

Страница 6: ...Under Floor Installation The Super Star may be installed under the floor provided that 1 A minimum clearance of 600 mm exists between the underside of the floor joists and the ground The ground where...

Страница 7: ...tal length of the flue should not be more than 10 meters Gas Piping A licensed gas fitter must install the gas piping The connection at the appliance is to a BSP male thread located at the inlet of th...

Страница 8: ...ostat is sealed to prevent draughts from affecting the thermostat sensor The control wiring that passes into the heater should use a cable gland for safe harnessing the wiring on to the PCB This gland...

Страница 9: ...ts under any conditions Add On Cooling Where either presently or in future with any Super Star model a suitable add on cooling can be installed with the proper indoor refrigerated coil section it shou...

Страница 10: ...30 seconds Step 4 For natural gas the heater will attempt ignition three times and should ignite However it attempts ignition again if the flame is lost due to some reason The PCB on the heater reche...

Страница 11: ...light on internal failure microcontroller failure and power on self check No flash cheque the fuse find the reason of the short circuit rectify and replace the 3 Amp fuse If the system still fails to...

Страница 12: ...require human intervention to reset When more vents are opened and or power is restored the overheat auto reset high temperature limit will automatically reset but the thermostat may have to be turned...

Страница 13: ...Has the Installer s Declaration been signed off in the Operating Instructions provided with the heater Has the owner user been given a copy of the Operating Instructions and instructed on how the syst...

Страница 14: ...D Flue Collar mm 100 100 100 100 100 E Duct Connections Return Supply mm 300x300 300x300 300x300 350x350 350x350 Extra Air panel collars mm NA NA 350x350 400x400 400x400 Figure 6 Dimensions ref Table...

Страница 15: ...d fastened on the burner front and a bracket on the base of the heater This will allow to change the burners injectors and gas valve 4 Gas valve can be accessed by opening the front lower panel Remove...

Страница 16: ...to the caller If a warranty service is called and the unit is found incorrectly installed the cost of the service including call out charges at a standard rate with half an hour minimum charge will be...

Страница 17: ...sure the ignitor lead of the replacement part is sleeved with a high voltage suppression lead Use genuine part of the appliance to avoid malfunction Make sure the gap between the electrodes tips is n...

Страница 18: ...ed by a 3 Amp purple fuse locating right next to the transformer outlet with 24 V connections Normally this fuse protects the PCB from many abuses Please check the fuse is Ok if not replace it by gent...

Страница 19: ...k put the access panel back harness it properly with all screws on The location of the gas valve is shown through the following photographs 9 10 Photograph 9 10 Location of the gas valve and Gas manif...

Страница 20: ...the heat exchanger is not cracked or blackened if any abnormality is found on the tubes of the heat exchanger please ring Eco Pacific on 1300ecopac or 9706 6228 The heat exchanger is proprietary part...

Отзывы: