background image

   

 

 

Eco Pacific/Super Star- Installation and Service Instructions 20173                 

 

Eco Pacific 

‘Super Star’

 series Gas Ducted Heaters 

                    

(Installation and service Instructions) 

 

CONTENTS  

PAGE   

 

                 

 

 

A) Installations instructions      

        

 
Description of the heater 

Models and specifications 

3                                                                                               

General requirements 

Clearances 

 

         

Installation  

 

 

         

Pre-commissioning check list 

 

 

 

         

Operating instructions 

      

        

 
Commissioning procedure 

10 

  

        

 
Final Checks 

12 

   

        

 
Figures:  
Figure 1&2: General aspects 

3                                                                                     

Figure 3: Clearances 

4                                                                                  

Figure 4: Gas valve connections 

7                                                                                

Figure 5: Power point connection polarity 

7                                                                   

Figure 6: Dimensions 

14                                                                                             

Figure 7: Wiring Diagram 

14                                                                                                                                                                                                                                                               

 
Super Star dimensions and specifications 

 

 

   

Table 1:  Specifications data 

13                                                                                    

Table 2:  Dimensions 

13                                                                                               

 

B) Service instructions

 

 

15-20

  

                                                                                                

Important Notice to Agents, Installers, and Purchasers 

DO NOT MODIFY THIS APPLIANCE 

This  appliance  must  be  installed  and  serviced  only  by  a  Gas  certified  appropriately  qualified 
person  according  to  AS5601  installation  standard  and  also  according  to  the  instructions  and 
guidelines provided by  Eco Pacific. Failure to  do so Eco Pacific will  not  accept responsibility for 
any problems, which occur as a result of faulty installation and or service.  

Due to ongoing R&D the product’s technical specifications can change any time  without notice. 
For updates please contact Eco Pacific on 1300ecopac or 03-9706 6228 

Abbreviations 

Abbreviation 

Quantity 

Units 

Amperage 

Amperes 

Ph 

Phases 

 

Voltage 

Volts 

kW 

Heating Capacity 

Kilo Watts 

MJ 

Energy 

Mega Joules 

Time 

Hours 

Hz 

Frequency 

Hertz 

Содержание Super Star SS Series

Страница 1: ...xternal installations 4 5 4 8 star energy rated DO NOT MODIFY THIS APPLIANCE Manufacturers of High Efficiency Ducted Gas Heaters Evap Coolers and Fresh Air Heat Recovery Ventilators Tel 03 9706 6228 F...

Страница 2: ...fications data 13 Table 2 Dimensions 13 B Service instructions 15 20 Important Notice to Agents Installers and Purchasers DO NOT MODIFY THIS APPLIANCE This appliance must be installed and serviced onl...

Страница 3: ...ve The gas inlet connection is given at the front lower section Access to the fan wheel and motor is achieved on the far right hand side Models These installation instructions cover the Eco Pacific Su...

Страница 4: ...manufacturers reserve the right to refuse to attend the warranty service to the unit if the unit is not installed according to the above requirements and if adequate safety and accessibility to the un...

Страница 5: ...ure 3 Minimum installation clearances Installation Procedure General The following sequence of installation steps is suggested Reference is also made to the Final Checklist 1 Inspect the site for area...

Страница 6: ...Under Floor Installation The Super Star may be installed under the floor provided that 1 A minimum clearance of 600 mm exists between the underside of the floor joists and the ground The ground where...

Страница 7: ...tal length of the flue should not be more than 10 meters Gas Piping A licensed gas fitter must install the gas piping The connection at the appliance is to a BSP male thread located at the inlet of th...

Страница 8: ...ostat is sealed to prevent draughts from affecting the thermostat sensor The control wiring that passes into the heater should use a cable gland for safe harnessing the wiring on to the PCB This gland...

Страница 9: ...ts under any conditions Add On Cooling Where either presently or in future with any Super Star model a suitable add on cooling can be installed with the proper indoor refrigerated coil section it shou...

Страница 10: ...30 seconds Step 4 For natural gas the heater will attempt ignition three times and should ignite However it attempts ignition again if the flame is lost due to some reason The PCB on the heater reche...

Страница 11: ...light on internal failure microcontroller failure and power on self check No flash cheque the fuse find the reason of the short circuit rectify and replace the 3 Amp fuse If the system still fails to...

Страница 12: ...require human intervention to reset When more vents are opened and or power is restored the overheat auto reset high temperature limit will automatically reset but the thermostat may have to be turned...

Страница 13: ...Has the Installer s Declaration been signed off in the Operating Instructions provided with the heater Has the owner user been given a copy of the Operating Instructions and instructed on how the syst...

Страница 14: ...D Flue Collar mm 100 100 100 100 100 E Duct Connections Return Supply mm 300x300 300x300 300x300 350x350 350x350 Extra Air panel collars mm NA NA 350x350 400x400 400x400 Figure 6 Dimensions ref Table...

Страница 15: ...d fastened on the burner front and a bracket on the base of the heater This will allow to change the burners injectors and gas valve 4 Gas valve can be accessed by opening the front lower panel Remove...

Страница 16: ...to the caller If a warranty service is called and the unit is found incorrectly installed the cost of the service including call out charges at a standard rate with half an hour minimum charge will be...

Страница 17: ...sure the ignitor lead of the replacement part is sleeved with a high voltage suppression lead Use genuine part of the appliance to avoid malfunction Make sure the gap between the electrodes tips is n...

Страница 18: ...ed by a 3 Amp purple fuse locating right next to the transformer outlet with 24 V connections Normally this fuse protects the PCB from many abuses Please check the fuse is Ok if not replace it by gent...

Страница 19: ...k put the access panel back harness it properly with all screws on The location of the gas valve is shown through the following photographs 9 10 Photograph 9 10 Location of the gas valve and Gas manif...

Страница 20: ...the heat exchanger is not cracked or blackened if any abnormality is found on the tubes of the heat exchanger please ring Eco Pacific on 1300ecopac or 9706 6228 The heat exchanger is proprietary part...

Отзывы: