INSTALLATION, OPERATION AND MAINTENANCE MANUAL 

13

Putting the boiler into service

Checking the boiler before turning it on

Before putting the boiler into operation, the service technician must check:

     Whether the installation conforms with the design;

     Whether the boiler has been filled in and is under pressure (on the thermo-manometer), and whether there are any leakage

in the heating system;

     Connection to the chimney – connection must be approved by an authorised chimney sweep (chimney inspection);

     Functioning of the heating controls.

Please note

The service technician must show the user how to control the boiler and enter the date when the boiler was put into service into the
Warranty Certificate.

Filling up and draining the heating system

The system can only been filled up or topped up with water which meets the parameters specified by EN standards. The water must
be clear, colourless, free of suspended particles, oil and chemically corrosive substances, and must not be acidic (pH factor must
be greater than 7.2). First of all, the heating system must be thoroughly flushed and all dirt washed out.

Please note

Water in system must not be reduced or put out unless the boilers is in service or under freezing danger.

Against freezing anti-freeze liquid can be added in to system water at the rate of 15%.

The failure to meet this requirement may lead to the heat exchanger getting clogged up, and the cast iron block may crack as a result.

During the heating season, a constant volume of water must be maintained inside the heating system. When topping up water,
care must be taken that no air is sucked into the system. Water must never be let out of the boiler or the heating system, unless it
is absolutely essential, such as before repairs, etc. Draining water and refilling the system with new water increases the risk of
corrosion and formation of incrustation.

Filling or topping up water to the heating system must always be done with the boiler cold or cooled down; otherwise the boiler
segments may crack!

Operation and controls

Starting a fire

Check on the thermo-manometer whether there is enough water in the heating system. Open the shutting valve between the boiler
and the heating system. Spread paper on top of the clean stoker and then enough finely chopped wood. Open the flue flap in the
chimney adapter and shut the stoking door. Light the paper through the open ashtray door and fully open the regulating flap in the
ashtray door. The fire has caught up enough, stoke a layer of main fuel on top of the burning firewood. When the fire is powerful
enough, stoke more fuel right up to the bottom edge of the stoking door and level it into.

Provide an even layer throughout the entire boiler depth. If the fuel suddenly turns into dark red blaze, open partially the secondary air
supply rosette in the stoking door. When the flame turns yellow, shut the secondary air supply rosette again. When the boiler has reached
the required output, it is suitable to partially shut the flue thrust flap to prevent heat from unnecessarily escaping into the chimney.

Do not start the boiler without connecting the boiler to the chimney.

Control chimney connections before starting the boiler.

Adjust the chimney blow as requested level. If chimney blow is under mentioned levels try not to
use the boiler.

Setting the outlet water temperature

When the required outlet water temperature is say 60°C, heat up the boiler to a temperature for instance 5°C higher than the
required temperature of 60°C (measured on the thermometer on the boiler outlet pipe). Then turn the control knob to 65°C and
check whether the chain is stretched and the regulating hatch completely shut. This position of the chain and regulating hatch is
fine-adjusted by turning the control knob.Then let the regulation process work. When the water temperature drops, the regulating
hatch will start opening by the tension applied by the regulator on the chain. When the water temperature suddenly rises, the
regulating hatch will start opening. And the hot water temperature on the boiler outlet is controlled.

Содержание Evo Multi Fuel Boiler

Страница 1: ...Angus Evo Multi Fuel Boiler Installation Operation and Maintenance Manual...

Страница 2: ...rols 13 Starting a fire 13 Setting outlet water temperature 13 Stoking 14 Overnight heating mode 14 Removing solid combustion residuals 14 Dewing and tarring 14 Boiler shutdown 14 Short term shutdown...

Страница 3: ...INSTALLATION OPERATION AND MAINTENANCE MANUAL 1 Information on the boiler plate The boiler Serial No is shown on the plate which is attached to the cover panel of the cast iron body fig 01...

Страница 4: ...MANUAL 2 Boiler dimensions fig 02 Boiler packaging dimensions fig 03 EV 03 EV 04 EV 05 EV 06 L mm 609 709 809 909 EV 03 EV 04 EV 05 EV 06 L mm 665 765 865 965 Notice Please obey to the meanings of th...

Страница 5: ...e Control C 30 90 Maximum Pressure of System bar 4 Minimum Pressure of System bar 0 4 Boiler Water Content L 16 33 20 30 24 27 28 24 m3 0 01633 0 0203 0 02427 0 02824 Exit Flue Connection Diameter mm...

Страница 6: ...be increased approximately 10 FOR COAL MODEL HEAT OUTPUT kW HEAT OUTPUT kCAL MAX HEATING AREA UNC M2 Solid Fuel 03 17 14 617 146 Solid Fuel 04 27 23 216 232 Solid Fuel 05 34 29 235 292 Solid Fuel 06...

Страница 7: ...ep the original packaging until the boiler has been put into service in case the boiler has to be transported again 11 When making any repairs only original parts must always be used It is forbidden t...

Страница 8: ...iler body is equipped with necessary pipe sections for water connection It also has brackets for fitting thermostat sensors and brackets on feet for fastening the boiler to the base Attached to the ca...

Страница 9: ...ing the safety and the control elements remember to meet the principles of work safety If replacing of safety device and of thermo mechanical output regulator is necessary please use recommended devic...

Страница 10: ...Temperature safety valve The Angus Evo boilers can be equipped with a safety heat exchanger with thermal safety valve as an optional which ensures dissipation of excessive heat without additional devi...

Страница 11: ...p 3 Cold Water Feed 8 Heating System 4 System Safety Valve 3 bar 1 2 9 Open Expansion Tank 5 NRV Open type expansion tank must be equipped with the highest level in the entire hydraulic system The exp...

Страница 12: ...sion Tank 5 Four Way Mixing Valve 3 Radiator fig 11 1 Boiler 2 Laddomat 21 60 operated by Flue Thermostat 50 300 C 3 NAD or NADO Accumulator Tank 4 Immersion Heater 5 Three Way Mixing Valve 6 Circulat...

Страница 13: ...en for an appropriately sized expansion vessel on the central heating circuit before the return to the boiler and a safety group on the primary flow It is essential to ensure that the expansion vessel...

Страница 14: ...AL 12 fig 15 fig 16 1 Boiler 2 Safety Group automatic air vent pressure reducing valve and pressure gauge 3 DHW Cylinder 4 CH Pump 5 Heating System 6 Four Way Mixing Valve 7 NRV 8 Expansion Vessel 9 A...

Страница 15: ...with the boiler cold or cooled down otherwise the boiler segments may crack Operation and controls Starting a fire Check on the thermo manometer whether there is enough water in the heating system Ope...

Страница 16: ...the boilers inside walls When running the boiler with low water temperature usually below 65 C or when using damp fuel water condensates in combustion gases and the condensate runs down the boiler s...

Страница 17: ...esult in inadequate chimney thrust The boiler must be cleaned regularly at least once a month which is done with a steel brush through an open boiler door After taking front section plate off all boil...

Страница 18: ...INSTALLATION OPERATION AND MAINTENANCE MANUAL 16 fig 19 fig 20 fig 21 fig 22...

Страница 19: ...ways be used Warranty and warranty conditions Angus Evo boilers are covered by warranty specified in the Warranty Certificate Service Book and User and Installation Guide chapter Introduction Installi...

Страница 20: ...essure We recommend installing a sludge trap upstream of the boiler i e on hot water return pipe The sludge trap design should allow emptying in regular intervals without the need to drain a lot of ho...

Страница 21: ...g the entire depth of the boiler body If the boiler is installed in a cellar we recommend to put it on a socket at least 50mm high positioning the boiler in the middle To comply with standards at leas...

Страница 22: ...utlet when the boiler is operating Installation procedure Place the boiler body on a non flammable materials Install a thermal safety valve After connecting the boiler to the heating system screw fill...

Страница 23: ...INSTALLATION OPERATION AND MAINTENANCE MANUAL 21 Angus Evo boiler parts fig 25 fig 26...

Страница 24: ...EV PM 140 EV PM 140 EV PM 140 25 Thermostat Bulb Segment EV 20080124 EV ST 141 EV ST 141 EV ST 141 EV ST 141 26 Stopper 3 4 EV 20080125 EV PM 131 EV PM 131 EV PM 131 EV PM 131 27 Thermostatic Regulato...

Страница 25: ...essary when the required volume is less than 300L Transportation and storage The manufacturer handles the boiler that is on a palette and secured against shifting with screws The boiler may not be tra...

Страница 26: ...arnings A sufficient flue draft of the flue gas system is the basic requirement for the correct functioning of the boiler It fundamentally affects its performance and efficiency Therefore heed the fol...

Страница 27: ...ted Boiler is heating but radiators are not Quality of the fuel might be low and or the moisture content of the fuel maybe high Operational instructions are not fulfilled Tar existing on surface of he...

Страница 28: ...For more information please visit our website www ecoangus co uk 01934 862642 07739 174511 07970 901273 ecoangus aol com 2068 Designed and produced by...

Отзывы: