The figures below are only guide figures. The draft depends on the diameter, height, roughness of the chimney wall, and the
temperature difference between combustion products and the outside atmosphere. We recommend the use of a chimney liner.

Have precise calculations carried out by a heating engineer or flue installer.

Coefficient = 0,041 (for wood)

Coefficient = 0,027 (for carbon)

F

= Section Resulting (cm2)

a

= Coefficient

Q

N

= Boiler Heat Output (kCal/h)

H

= Height of Chimney (meters)

Troubleshooting

F = a.Q

N

H

Problem

Reason

Solution

Boiler is not heating

Over condensation on boiler part 

and formation of black liquid

Outlet temperature of boiler 

is not adjusted

Boiler is heating but radiators are not

Quality of the fuel might be low 

and/or the moisture content of 

the fuel maybe high

Operational instructions are 

not fulfilled

Tar existing on surface of 

heat exchanger

Using fuel which has high moisture

Low outlet temperature

Lower door is not sealed properly 

when closed

Temperature controller (draft regulator) 

is not functional

Circulation pump is not working 

or water circulation was blocked 

(i.e. closed valve)

Try to use fuel which has better 

calorific value and moisture

Inspect chimney draft, position of flap,

circulation of outlet temperature

Regularly clean the heat exchanger with

the brush supplied by Eco Angus Ltd

Use proper fuel

Try to operate the boiler with a 

chimney temperature 160K above 

ambient temperature

Replace the sealing of the lower door

Check functionality of the device

Check circulation system, especially 

the water pump

Содержание Evo Multi Fuel Boiler

Страница 1: ...Angus Evo Multi Fuel Boiler Installation Operation and Maintenance Manual...

Страница 2: ...rols 13 Starting a fire 13 Setting outlet water temperature 13 Stoking 14 Overnight heating mode 14 Removing solid combustion residuals 14 Dewing and tarring 14 Boiler shutdown 14 Short term shutdown...

Страница 3: ...INSTALLATION OPERATION AND MAINTENANCE MANUAL 1 Information on the boiler plate The boiler Serial No is shown on the plate which is attached to the cover panel of the cast iron body fig 01...

Страница 4: ...MANUAL 2 Boiler dimensions fig 02 Boiler packaging dimensions fig 03 EV 03 EV 04 EV 05 EV 06 L mm 609 709 809 909 EV 03 EV 04 EV 05 EV 06 L mm 665 765 865 965 Notice Please obey to the meanings of th...

Страница 5: ...e Control C 30 90 Maximum Pressure of System bar 4 Minimum Pressure of System bar 0 4 Boiler Water Content L 16 33 20 30 24 27 28 24 m3 0 01633 0 0203 0 02427 0 02824 Exit Flue Connection Diameter mm...

Страница 6: ...be increased approximately 10 FOR COAL MODEL HEAT OUTPUT kW HEAT OUTPUT kCAL MAX HEATING AREA UNC M2 Solid Fuel 03 17 14 617 146 Solid Fuel 04 27 23 216 232 Solid Fuel 05 34 29 235 292 Solid Fuel 06...

Страница 7: ...ep the original packaging until the boiler has been put into service in case the boiler has to be transported again 11 When making any repairs only original parts must always be used It is forbidden t...

Страница 8: ...iler body is equipped with necessary pipe sections for water connection It also has brackets for fitting thermostat sensors and brackets on feet for fastening the boiler to the base Attached to the ca...

Страница 9: ...ing the safety and the control elements remember to meet the principles of work safety If replacing of safety device and of thermo mechanical output regulator is necessary please use recommended devic...

Страница 10: ...Temperature safety valve The Angus Evo boilers can be equipped with a safety heat exchanger with thermal safety valve as an optional which ensures dissipation of excessive heat without additional devi...

Страница 11: ...p 3 Cold Water Feed 8 Heating System 4 System Safety Valve 3 bar 1 2 9 Open Expansion Tank 5 NRV Open type expansion tank must be equipped with the highest level in the entire hydraulic system The exp...

Страница 12: ...sion Tank 5 Four Way Mixing Valve 3 Radiator fig 11 1 Boiler 2 Laddomat 21 60 operated by Flue Thermostat 50 300 C 3 NAD or NADO Accumulator Tank 4 Immersion Heater 5 Three Way Mixing Valve 6 Circulat...

Страница 13: ...en for an appropriately sized expansion vessel on the central heating circuit before the return to the boiler and a safety group on the primary flow It is essential to ensure that the expansion vessel...

Страница 14: ...AL 12 fig 15 fig 16 1 Boiler 2 Safety Group automatic air vent pressure reducing valve and pressure gauge 3 DHW Cylinder 4 CH Pump 5 Heating System 6 Four Way Mixing Valve 7 NRV 8 Expansion Vessel 9 A...

Страница 15: ...with the boiler cold or cooled down otherwise the boiler segments may crack Operation and controls Starting a fire Check on the thermo manometer whether there is enough water in the heating system Ope...

Страница 16: ...the boilers inside walls When running the boiler with low water temperature usually below 65 C or when using damp fuel water condensates in combustion gases and the condensate runs down the boiler s...

Страница 17: ...esult in inadequate chimney thrust The boiler must be cleaned regularly at least once a month which is done with a steel brush through an open boiler door After taking front section plate off all boil...

Страница 18: ...INSTALLATION OPERATION AND MAINTENANCE MANUAL 16 fig 19 fig 20 fig 21 fig 22...

Страница 19: ...ways be used Warranty and warranty conditions Angus Evo boilers are covered by warranty specified in the Warranty Certificate Service Book and User and Installation Guide chapter Introduction Installi...

Страница 20: ...essure We recommend installing a sludge trap upstream of the boiler i e on hot water return pipe The sludge trap design should allow emptying in regular intervals without the need to drain a lot of ho...

Страница 21: ...g the entire depth of the boiler body If the boiler is installed in a cellar we recommend to put it on a socket at least 50mm high positioning the boiler in the middle To comply with standards at leas...

Страница 22: ...utlet when the boiler is operating Installation procedure Place the boiler body on a non flammable materials Install a thermal safety valve After connecting the boiler to the heating system screw fill...

Страница 23: ...INSTALLATION OPERATION AND MAINTENANCE MANUAL 21 Angus Evo boiler parts fig 25 fig 26...

Страница 24: ...EV PM 140 EV PM 140 EV PM 140 25 Thermostat Bulb Segment EV 20080124 EV ST 141 EV ST 141 EV ST 141 EV ST 141 26 Stopper 3 4 EV 20080125 EV PM 131 EV PM 131 EV PM 131 EV PM 131 27 Thermostatic Regulato...

Страница 25: ...essary when the required volume is less than 300L Transportation and storage The manufacturer handles the boiler that is on a palette and secured against shifting with screws The boiler may not be tra...

Страница 26: ...arnings A sufficient flue draft of the flue gas system is the basic requirement for the correct functioning of the boiler It fundamentally affects its performance and efficiency Therefore heed the fol...

Страница 27: ...ted Boiler is heating but radiators are not Quality of the fuel might be low and or the moisture content of the fuel maybe high Operational instructions are not fulfilled Tar existing on surface of he...

Страница 28: ...For more information please visit our website www ecoangus co uk 01934 862642 07739 174511 07970 901273 ecoangus aol com 2068 Designed and produced by...

Отзывы: