5  Periodic Inspection 

If the Lifting Magnet is being used in the EU then it must be inspected and maintained in 
accordance with the requirements of PUWER (1998).

For areas outside the EU the Lifting Magnet must be inspected and maintained in 
compliance with the applicable work standards and other standards for suspended load 
handling (eg. ASME B30.20).

Should the data plates become detached or damaged please contact your supplier 
immediately for replacement plates.

In addition to statutory requirements it is recommend that you follow this maintenance 
schedule:

MAINTENANCE SCHEDULE

Frequency

Operation

Daily

Weekly

Monthly

Annually

Inspect pole feet for damage

Inspect lifting eye for damage and security 

Inspect data labels for damage

Proof test WLL

6 Warranty

This Lifting Magnet is covered by a 1-year warranty from the date of invoice. 

7  Inspection Record  

This Lifting Magnet should be re-certified in accordance with the requirements of PUWER 
(1998) and LOLER (1998).

For areas outside the EU this Lifting Magnet must be inspected in compliance with the 
applicable work standards and other standards for suspended load handling (eg. ASME 
B30.20). 

Содержание Ultralift E ULE0100

Страница 1: ...s Ultralift E Lifting Magnet Safe Operation and Maintenance Manual Anvisninger for bruk og vedlikehold Ultralift E Lyftmagnet Handbok f r s ker anv ndning och underh ll Ultralift E Magneetin nostamine...

Страница 2: ...ety Instructions 2 1 Symbols and Terms Used 3 2 2 Important Safety Information 4 2 3 Considerations for Use 5 3 Getting Started 3 1 Understanding Your Lifter 7 4 Technical Data 4 1 Model Types 8 4 2 P...

Страница 3: ...sed stored maintained and inspected in compliance with the applicable work standards and other standards for suspended load handling BEFORE USE PLEASE CAREFULLY READ THIS MANUAL This Safe Operation an...

Страница 4: ...Working Load SWL round bar Correct orientation of load Do not lift people Do not lift load over people Do not lift loads exceeding the recommended length Air gap warning See Load Characteristics in S...

Страница 5: ...manoeuvring space Allow untrained personnel to operate the lifter Leave a load unattended Use the lifter outside the recommended operations Attempt to switch the lifter before setting down the load Po...

Страница 6: ...s allow the lifter to clamp components through air gaps However this will ALWAYS have an adverse effect on the lifter performance Air gaps are generated in a number of ways For example paint dust scal...

Страница 7: ...mum hold will only be achieved when the lifter has full contact with the component to be lifted If the full face of the poles does not come into contact with the component to be lifted for instance du...

Страница 8: ...a thread locking compound Care should be taken to ensure the load does not exceed the stated capacity of the lifter 3 1 Understanding Your Lifter The lifter is in the OFF position To Switch the lifter...

Страница 9: ...used instead of Safe Working Load SWL The Lifting force values shown include the 3 1 safety factor and have been based on using thick high magnetic permeability steel with no air gaps Air gaps thinne...

Страница 10: ...2 Performance Curves WLL WLL 1000kg 2200lb 45mm 1 77 kg lb WLL WLL 1000kg 2200lb 45mm 1 77 kg lb WLL WLL 1000kg 2200lb 45mm 1 77 kg lb ULE0300 ULE0660 300kg 660lb WLL VS THICKNESS T DATA GRAPH 0 10 20...

Страница 11: ...WLL WLL 1000kg 2200lb 45mm 1 77 kg lb WLL WLL 1000kg 2200lb 45mm 1 77 kg lb ULE0600 ULE01320 600kg 1320lb WLL VS THICKNESS T DATA GRAPH Note Performance varies with material ULE0300 ULE0660 300kg 660...

Страница 12: ...m 0 10 20 30 40 50 60 70 80 90 100 0 10 20 30 40 50 60 70 80 90 100 T mm WLL WLL 1000kg 2200lb 45mm 1 77 kg lb WLL WLL 1000kg 2200lb 45mm 1 77 kg lb ULE1000 ULE2200 1000kg 2200lb WLL VS THICKNESS T DA...

Страница 13: ...eplacement plates In addition to statutory requirements it is recommend that you follow this maintenance schedule MAINTENANCE SCHEDULE Frequency Operation Daily Weekly Monthly Annually Inspect pole fe...

Страница 14: ...nent lifting magnet This machinery fulfils all the relevant provisions of The Supply of Machinery Safety Regulations 2008 as well as The Electrical Equipment Safety Regulations 2016 The Electromagneti...

Отзывы: