30
2021-09-21 | ECKOLD AG
Kraftformer KF 800
6. Connection / Installation
H
IMPORTANT
Do not forget to clamp the tools in securely!
CAUTION
—
Installation of tools while the ram is not at a standstill
—> Crushed upper extremities (e.g.
fi
ngers, hands, arms)
•
Tools may be installed or changed only when the ram is stationary
6.3
Mounting / Dismantling of the forming tools
Standard forming tools are inserted in both of the tool holding
fi
xtures of the Kra
ft
former.
1.
Positioning of the locking rings (A).
Important:
Th
e opening of the locking ring must be positioned forward-facing
2.
Insert the tool completely into the tool mounting from the front.
3.
Tighten the tool lock in the direction of the arrow.
4.
Turn the locking ring 180° to
fi
x the tool positive locking.
Important:
Th
e opening of the locking ring must be positioned pointing backwards.
1
2
A
3
4
5
Quick change tool holders allow a tool change practically without any down time.
5.
To remove/change tools:
- Turn the locking ring by 180° so that the opening is facing forward.
- Release the tool lock in the opposite direction to the arrow and pull out the tool
Содержание KRAFTFORMER KF 800
Страница 48: ...48 2021 09 21 ECKOLD AG Kraftformer KF 800 8 Maintenance...
Страница 52: ...52 2021 09 21 ECKOLD AG Kraftformer KF 800 9 Appendix 9 5 EC declaration of conformity...
Страница 68: ...68 2021 09 21 ECKOLD AG Kraftformer KF 800 11 Machine Spare Parts List 11 10 Pneumatic equipment 021 300 4541 A...
Страница 70: ...70 2021 09 21 ECKOLD AG Kraftformer KF 800 12 Pneumatikschema...
Страница 71: ...71 2021 09 21 ECKOLD AG Kraftformer KF 800 Notizen Notes...
Страница 72: ...FDR MAKERS SINCE 1957...