ECH2O Tec. 900-BHL- 2 Скачать руководство пользователя страница 8

SYSTEM OPERATION INSTRUCTIONS 

 
The  reverse  osmosis  membrane  contains  a  preservative  solution  to  prevent  microbiological 
growth.  If ingested, may cause irritation of the gastro-intestinal tract, colic, diarrhea, or other 
similar symptoms.   
Therefore, discard all the product water for at least thirty minutes of initial operation or after 
storage before drinking or use in food preparations! 

 

Do  not  operate  the  system  using  contaminated  feed  water  sources  (oil,  chlorine  or  other 
chemicals).   

 

Have you filled the high-pressure pump with the proper amount of oil? 

 

 

1) 

Open the pressure control valve on the control panel all the way, counter-clock wise.  

 

2) 

Set the flush/service valve at the pre-filter assembly to the run position (center) and open 
the shut off valve at the pre-filter intake.  

 

3) 

Set the diverter valve on the flow control panel to the sample (test) position. 

 

4) 

Switch  the  selector  switch  to  the  “Service”  position  to  run  the  sea  water  supply  pump 
only. 

 

5) 

Purge  the  seawater  intake  system  until  all  entrapped  air  has  escaped,  then  switch  the 
selector switch “Off” and bring the selector switch in the “Auto” position. 

 

6) 

Press the start button for about five seconds.  If the motor stops when the start-button is 
released, purge the seawater intake system again and start the watermaker in the “Auto” 
position 

  

7) 

Close  the  pressure  control  valve  slowly  clockwise  and  adjust  the  water  pressure  to 
800psi.    If  the  watermaker  is  used  in  brackish  water,  adjust  the  pressure  in  order  to 
achieve the specified product water output 

only

 

 

Caution: Never allow any leaks in your hose or pipe connections.  

 

8) 

Check  the  quality  of  the  product  water  with  the  TDS  meter.  If  the  water  is  pure  (under 
500ppm TDS), switch the diverter valve on the control panel to the storage tank position. 

 

 

SYSTEM SHUT DOWN PROCEDURE 

 

1) 

Switch the diverter valve to the sample position. 

2) 

Open the pressure control valve all the way counter clockwise. 

3) 

Switch the selector switch off. 

4) 

Fresh water flush the system (see next page). 

 

Содержание 900-BHL- 2

Страница 1: ...5 STANDARD SYSTEM FEATURES INSTALLATION LAYOUT 6 7 INSTALLATION INSTRUCTIONS 8 9 OPERATION INSTRUCTIONS 10 MEMBRANE CLEANING PROCEDURE 11 MAINTENANCE TIMETABLE 12 TROUBLESHOOTING GUIDE 13 14 HIGH PRES...

Страница 2: ...familiar with each component of your new ECHO Tec desalination system By understanding the function importance and normal operation of each part in the system the operator can readily diagnose proble...

Страница 3: ...NE TYPE Specifically selected high rejection proprietary TFC Polyamid thin film composite spiral wound single pass reverse osmosis element SALT REJECTION min 99 5 SALINITY RANGE up to 50 000 ppm TDS N...

Страница 4: ...s 1200 BHL 3 three 40 vessels 1500 BHL 4 four 40 vessels 6 20 feet 6 meter 1 2 reinforced vinyl hose reject product flush 10 feet 3 meter blue product water tubing membrane to flow panel 10 feet 3 met...

Страница 5: ...WATER LEVEL AT LOW TIDE Beach House Series Installation Layout Product Max 2 7m 9ft Max 9m 30ft Reject Non return valve Sea strainer...

Страница 6: ...reservative under best conditions is one year We recommend you install and use your watermaker as soon as possible When all other components and hoses pipes are completely assembled remove the caps on...

Страница 7: ...flow control box to the O ring sealed fitting at the end of the membrane that is market OUT CAUTION WHEN CONNECTING THE HIGH PRESSURE HOSE FITTINGS TO THE MEMBRANE HOUSING S AVOID TURNING THE MEMBRAN...

Страница 8: ...o the Service position to run the sea water supply pump only 5 Purge the seawater intake system until all entrapped air has escaped then switch the selector switch Off and bring the selector switch in...

Страница 9: ...end to store your watermaker for more than ten days growth of microorganism will degrade the RO membranes performance The RO membranes should be flushed with a biocide solution to preserve the membran...

Страница 10: ...on label CAUTION Do not mix different cleaning chemicals together Do not use different cleaning chemicals together at the same time Mix the cleaning chemicals separately and use them separately Note...

Страница 11: ...n intake 1000 hrs or when clogged Pre filters Replace or clean elements and clean housings When system intake pressure drops below 5psi Charcoal flush filter Replace element Every 6 months High pressu...

Страница 12: ...ns Check strainer and filter s Inability to Discharge valve chamber Allow more time to prime build up pressure has air trapped within it and ensure that there are no air suction leaks Open valve chamb...

Страница 13: ...wn on page 8 Inspection inlet outlet valves 2 1 Remove valve caps slide out inlet outlet valves check the sondition of the various components of the valve and well as the O Ring replace if necessary 2...

Страница 14: ...lacing oil seals 6 1 Remove the head See remove the ceramic pistons discharge oil 6 2 Remove the oil seals and the O Rings checking the seats and the piston guides 6 3 Remove the rear cover gasket 6 4...

Страница 15: ...ned to Echo Marine s Service Center The purchaser must pay any transportation or labor expenses incurred in removing and returning the product to the service center The limited warranty does not exten...

Страница 16: ...ranteed against iron fouling rust chemical attack extreme temperatures over 113 F under 33 F drying out or extreme pressures over 1000 psig CAUTION Use of parts not supplied directly by Echo Marine ge...

Отзывы: