ECH2O Tec. 900-BHL- 2 Скачать руководство пользователя страница 11

MAINTENANCE TIMETABLE 

 
 

The following maintenance timetable is an estimate of the time intervals at which maintenance may 
be  required  only.    This  schedule  must  be  adjusted  to  the  regularity  of  usage,  the  condition  of  the 
intake  water,  the  length  of  time  the  system  is  exposed  to  seawater  and  the  total  running  time 
following each system cleaning. 
 
 

COMPONENT 

MAINTENANCE 
REQUIRED 

TIME INTERVAL 
INTERMITTENT DUTY 

Seawater intake 
strainer 

Inspect and clean intake. 

1000 hrs, or when clogged. 

Pre filters 

Replace or clean elements and  
clean housings. 

When system intake pressure 
drops below 5psi. 

Charcoal flush filter 

Replace element. 

Every 6 months. 

High pressure pump 

Change crankcase oil. 
 
 
 
Change packings, seals  
and “

O

” rings. 

 

Initial change after 50 hrs. 
Every 200 operating hours or 
6 months. 
 
Every 2000 hrs or when 
leaking. 

R.O. membrane 

When production or salt rejection 
decreases by 20%. 
 
Replace 

Clean with acid and/or 
alkaline cleaning compound. 
 
When cleaning does not 
increase production. 

Flow meter 

Clean inside the clear tube. 
 
Disconnect product tubing and  
infuse rust remover.  Rinse 
thoroughly! 
 
 
 

Whenever dirty. 

 

Содержание 900-BHL- 2

Страница 1: ...5 STANDARD SYSTEM FEATURES INSTALLATION LAYOUT 6 7 INSTALLATION INSTRUCTIONS 8 9 OPERATION INSTRUCTIONS 10 MEMBRANE CLEANING PROCEDURE 11 MAINTENANCE TIMETABLE 12 TROUBLESHOOTING GUIDE 13 14 HIGH PRES...

Страница 2: ...familiar with each component of your new ECHO Tec desalination system By understanding the function importance and normal operation of each part in the system the operator can readily diagnose proble...

Страница 3: ...NE TYPE Specifically selected high rejection proprietary TFC Polyamid thin film composite spiral wound single pass reverse osmosis element SALT REJECTION min 99 5 SALINITY RANGE up to 50 000 ppm TDS N...

Страница 4: ...s 1200 BHL 3 three 40 vessels 1500 BHL 4 four 40 vessels 6 20 feet 6 meter 1 2 reinforced vinyl hose reject product flush 10 feet 3 meter blue product water tubing membrane to flow panel 10 feet 3 met...

Страница 5: ...WATER LEVEL AT LOW TIDE Beach House Series Installation Layout Product Max 2 7m 9ft Max 9m 30ft Reject Non return valve Sea strainer...

Страница 6: ...reservative under best conditions is one year We recommend you install and use your watermaker as soon as possible When all other components and hoses pipes are completely assembled remove the caps on...

Страница 7: ...flow control box to the O ring sealed fitting at the end of the membrane that is market OUT CAUTION WHEN CONNECTING THE HIGH PRESSURE HOSE FITTINGS TO THE MEMBRANE HOUSING S AVOID TURNING THE MEMBRAN...

Страница 8: ...o the Service position to run the sea water supply pump only 5 Purge the seawater intake system until all entrapped air has escaped then switch the selector switch Off and bring the selector switch in...

Страница 9: ...end to store your watermaker for more than ten days growth of microorganism will degrade the RO membranes performance The RO membranes should be flushed with a biocide solution to preserve the membran...

Страница 10: ...on label CAUTION Do not mix different cleaning chemicals together Do not use different cleaning chemicals together at the same time Mix the cleaning chemicals separately and use them separately Note...

Страница 11: ...n intake 1000 hrs or when clogged Pre filters Replace or clean elements and clean housings When system intake pressure drops below 5psi Charcoal flush filter Replace element Every 6 months High pressu...

Страница 12: ...ns Check strainer and filter s Inability to Discharge valve chamber Allow more time to prime build up pressure has air trapped within it and ensure that there are no air suction leaks Open valve chamb...

Страница 13: ...wn on page 8 Inspection inlet outlet valves 2 1 Remove valve caps slide out inlet outlet valves check the sondition of the various components of the valve and well as the O Ring replace if necessary 2...

Страница 14: ...lacing oil seals 6 1 Remove the head See remove the ceramic pistons discharge oil 6 2 Remove the oil seals and the O Rings checking the seats and the piston guides 6 3 Remove the rear cover gasket 6 4...

Страница 15: ...ned to Echo Marine s Service Center The purchaser must pay any transportation or labor expenses incurred in removing and returning the product to the service center The limited warranty does not exten...

Страница 16: ...ranteed against iron fouling rust chemical attack extreme temperatures over 113 F under 33 F drying out or extreme pressures over 1000 psig CAUTION Use of parts not supplied directly by Echo Marine ge...

Отзывы: