17
POSITION
DISTANCE(cm)
POSITION
DISTANCE (cm)
A
- Bel
ow
a
w
in
dow
60
G- Next t
o
v
er
�
cal
o
r h
o
ri
zo
ntal
pipe
60
B - Bel
ow
an air
v
ent
60
H
- Bel
ow
the
d
istance
g
rille fr
o
m
the
o
utsi
d
e
o
f the
b
uil
d
in
g
3
0
C
- Bel
ow
rain channel
3
0
I- Distance fr
o
m the inner c
o
rner
o
f the
b
uil
d
in
g
1
00
D-
U
n
d
er the
b
alc
o
ny
3
0
L-
F
r
o
m the
g
r
o
un
d
o
r fr
o
m the
floo
r
1
80
E- Next t
o
a
w
in
dow
4
0
M
-
V
er
�
cal
d
istance
o
f t
wo
fl
ue
o
utlets
15
0
F
- Next t
o
an air
g
rill
60
N-
Ho
ri
zo
ntal
d
istance
o
f t
wo
fl
ue
o
utlets
1
00
Table 4
8- INSTALLATION
8.1- Selection of Installation Location of Device
The boiler must be installed in accordance with gas safety regulations and relevant standards. Addition-
ally, the clearance around the boiler should be as shown in fig 8. In order to make service, maintenance
and usage easier.
Figure 8: It shows the minimum distances required from the top and sides of the device (Dimensions
given in cm).
The installation must comply with the following minimum distances so that servicing and maintenance
of the boiler can be performed correctly. The position of the boiler must be checked against technical
requirements.
Figure 8
Содержание CONFEO PREMIX P Series
Страница 2: ......
Страница 13: ...13 5 5 Electrical Diagram...
Страница 16: ...16 Figure 6 7 3 Distances for Placement of Flues Figure 7...
Страница 37: ...37 15 INSTALLATION TEMPLATE 15 1 HM Model...
Страница 38: ...38 15 2 HCH Model...
Страница 39: ...39 15 3 HST Model...
Страница 43: ......
Страница 45: ......
Страница 46: ......