ebm-papst K3G560-AP23-90 Скачать руководство пользователя страница 12

Operating instructions

K3G560-AP23-90

`

II 2G Ex db eb ib IIB T3 Gb

IBExU14ATEX1122 X /04

`

Translation of the original operating instructions

54006-4-8670

Fans installed upright

When routing the cable, make sure that the cable glands are located at
the bottom. The cables must always be routed downward.

Fig. 8: Cable routing for fans installed upright.

5.4 Factory settings

Factory settings made for the device by ebm-papst.

Mode parameter set 1

PWM control

Mode parameter set 2

PWM control

Fan/device address

1

Max. PWM / %

100

Min. PWM / %

5,1

Save set value to
EEPROM

Yes

Set value requirement

Analog (linear)

Direction of action
parameter set 1

Positive (heating)

Direction of action
parameter set 2

Positive (heating)

Item no. 54006-5-9970 · ENU · Change 93219 · Approved 2018-02-08 · Page 12 / 16

ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · [email protected] · www.ebmpapst.com

Содержание K3G560-AP23-90

Страница 1: ...instructions are available in other languages on our website www ebmpapst com 2 2 SAFETY REGULATIONS AND INFORMATION 2 2 1 Hazard levels for warnings 2 2 2 Staff qualifications 2 2 3 Basic safety rul...

Страница 2: ...urpose in a safe manner with attention to potential dangers and in accordance with the operating instructions No modifications additions or conversions are to be made to the device for example changes...

Страница 3: ...n and operating conditions the sound pressure level may exceed 70 dB A Risk of noise induced hearing loss Take appropriate technical safety measures Protect operating personnel with appropriate safety...

Страница 4: ...devices Using the device only in Zones 1 and 2 with Ex categories IIA and IIB and temperature classes T1 to T3 Using the device only in stationary systems Using the device only in speed ranges without...

Страница 5: ...er min 10 mm max 14 mm tightening torque 6 0 6 Nm standard value depending on cable 6 Terminal box fastening screws tightening torque 3 5 0 5 Nm 7 Ground connection point M8 functional ground for elec...

Страница 6: ...ng Technical features Output 10 VDC max 10 mA Output 20 VDC max 50 mA Output for slave 0 10 V Operation and alarm display Input for sensor 0 10 V or 4 20 mA External 24 V input parameter setting Exter...

Страница 7: ...production Six digit number e g 000003 Sequential serial number Ex marking II 2G Ex db eb ib IIB T3 Gb Element Explanation Ex marking according to 2014 34 EU II Equipment group II use above ground no...

Страница 8: ...connection should be isolated from vibration e g using compensators or similar elements Ensure stress free attachment of the fan to the substructure Check the device for transport damage Damaged devi...

Страница 9: ...the terminal box from ebm papst have been inspected for suitability The motor must be connected in accordance with EN 60079 14 Ground conductor contact resistance according to EN 61800 5 1 Compliance...

Страница 10: ...3 Connecting wires to terminals Open the terminal box To do so unscrew the seven screws for tightening torque see Chapter 4 1 Product drawing Take care when opening the terminal box cover Do not dama...

Страница 11: ...box screw connections and cable glands have been tightened to the specified torque 5 3 3 1 Replacement of cable glands and screw plugs If you would like to replace cable glands or screw plugs for exa...

Страница 12: ...y settings Factory settings made for the device by ebm papst Mode parameter set 1 PWM control Mode parameter set 2 PWM control Fan device address 1 Max PWM 100 Min PWM 5 1 Save set value to EEPROM Yes...

Страница 13: ...tput of current motor modulation level motor speed adjustable curve SELV 2 Din 2 Digital input 2 Switching parameter sets 1 2 according to EEPROM setting the valid or used parameter set can be selecte...

Страница 14: ...sonant frequencies must be determined in the course of fan commissioning Either run through the resonant range as quickly as possible with speed control or find another remedy Operation with excessive...

Страница 15: ...oved during cleaning Motor not turning Mechanical blockage Switch off isolate from supply and remove mechanical blockage Line voltage faulty Check line voltage restore power supply Attention The error...

Страница 16: ...e device Cable routing fastening Visual inspection At least every 6 months Fasten cables Cleaning and preventive maintenance Visual inspection At least every 3 months Remove dirt clean device Ball bea...

Отзывы: