background image

Operating instructions

D2E146-HT67-60

Translation of the original operating instructions

3. TECHNICAL DATA

3.1 Product drawing

All measures have the unit mm.

1

AMP Universal Mate-N-Lok coded plug system; connector shell: AMP 926 682-3; 6x plug pin: AMP 926 886-1

1.1

L = stage 1

1.2

L = stage 2

1.3

L = stage 3

1.4

L = stage 4

1.5

N

1.6

Protective earth

2

Connector shell: Molex 39-01-2040; 6x female connector Molex 39-00-0065

2.1

red

2.2

black

2.3

white

3

4 x sheet metal nut for thread EN ISO 1478-ST4.8 (min. screw length 14.5 mm plus thickness of mounting material)

Item no. 11187-5-9970 · Revision 72138 · Release 2010-11-02 · Page 4 / 9

ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · [email protected] · www.ebmpapst.com

Содержание D2E146-HT67-60

Страница 1: ...ed and authorised specialist personnel are permitted to transport unpack assemble operate or maintain the device or to use it in any other manner 1 3 Basic safety rules 1 1 3 Basic safety rules Any safety hazards stemming from the device must be re evaluated once it is installed in the end device Observe the following when working on the unit Do not make any modifications additions or conversions ...

Страница 2: ... could become entangled and pulled into the device You could be injured Do not wear any loose clothing or jewellery while working on rotating parts Protect long hair by wearing a cap 1 7 Emission WARNING Depending on the installation and operating conditions a sound pressure level greater than 70 dB A may arise Danger of noise induced hearing loss Take appropriate technical safety measures Protect...

Страница 3: ... the following ways is particularly prohibited and may cause hazards Operating the device with an imbalance e g caused by dirt deposits or icing Moving air that contains abrasive particles Moving highly corrosive air e g salt spray mist Exceptions are devices that are intended for salt spray mist and protected accordingly Moving air that contains dust pollution e g suctioning off saw dust Operatin...

Страница 4: ...tage 2 1 3 L stage 3 1 4 L stage 4 1 5 N 1 6 Protective earth 2 Connector shell Molex 39 01 2040 6x female connector Molex 39 00 0065 2 1 red 2 2 black 2 3 white 3 4 x sheet metal nut for thread EN ISO 1478 ST4 8 min screw length 14 5 mm plus thickness of mounting material Item no 11187 5 9970 Revision 72138 Release 2010 11 02 Page 4 9 ebm papst Mulfingen GmbH Co KG Bachmühle 2 D 74673 Mulfingen P...

Страница 5: ...kwise seen on rotor Type of protection IP 20 Insulation class F Humidity class F0 Mounting position Any Condensate discharge holes None open rotor Operation mode S1 Motor bearing Ball bearing Speed steps 4 Touch current acc IEC 60990 measuring network Fig 4 TN system 0 75 mA Electrical leads With plug Motor protection Thermal overload protector TOP wired internally Cable exit Variable Protection c...

Страница 6: ...witched off using an all pole disconnecting switch 4 2 1 Prerequisites Check whether the data on the type plate agree with the connection data and the data of the operating capacitor Before connecting the device ensure that the supply voltage matches the operating voltage of the device Only use cables designed for current according to the type plate For determining the cross section follow the bas...

Страница 7: ...ds switch must break the circuit 1 Step 1 min 2 Step 2 3 Step 3 4 Step 4 max 5 N 6 TOP 2x 7 Protective earth 8 Speed increase Item no 11187 5 9970 Revision 72138 Release 2010 11 02 Page 7 9 ebm papst Mulfingen GmbH Co KG Bachmühle 2 D 74673 Mulfingen Phone 49 0 7938 81 0 Fax 49 0 7938 81 110 info1 de ebmpapst com www ebmpapst com ...

Страница 8: ...ectrical load on the capacitor after device is switched off Electric shock risk of injury Discharge the capacitors before working on the device CAUTION The motor restarts automatically when operating voltage is applied e g after a power failure Danger of injury Keep out of the danger zone of the device When working on the device switch off the mains supply voltage and secure the latter from being ...

Страница 9: ...Repair or replacement of the device Check the device for damage to blades and housing Visual inspection At least every 6 months Replacement of the device Mounting the connection lines Visual inspection At least every 6 months Fasten Mounting of protective earth connection Visual inspection At least every 6 months Fasten Check the insulation of the wires for damage Visual inspection At least every ...

Отзывы: