Operating instructions
A3GZ50-AK15-35
Translation of the original operating instructions
Fig. 4: Cleaning of the fan with a high-pressure cleaner.
;
Maximum water pressure 80 bar
;
Minimum clearance between water outlet and fan 40 cm
;
The water jet must be aimed perpendicularly to the blades.
;
If possible, only aim the water jet at the rotating parts.
;
Do not aim the water jet directly at the condensation drainage hole (if
applicable).
;
When cleaning the electronics housing, do not aim the water jet
directly at the terminal box cover or cable glands.
;
If there is a condensation drainage hole in the rotor, make sure this is
not blocked by dirt.
;
Completely remove any cleaning agents used.
;
If severe corrosion is visible on load-bearing or rotating parts, switch
off the device immediately and replace it.
;
Repair of load-bearing or rotating parts is not permitted!
;
Operate the fan for 2 hours at maximum speed so that any water that
has ingressed can evaporate.
;
If cleaning does not eliminate vibrations, the fan may need to be
rebalanced. To have it rebalanced, contact ebm-papst.
;
The fan is equipped with maintenance-free ball bearings. The lifetime
lubrication of the ball bearings is designed for a service life of 40,000
hours.
;
If bearing replacement is necessary after that period, contact ebm-
papst.
;
Adapt the maintenance intervals to the actual level of dust exposure.
6.2 Safety inspection
NOTE
High-voltage test
The integrated EMC filter has Y capacitors. The tripping current
is exceeded when AC testing voltage is applied.
→ Test the device with DC voltage when you perform the
legally required high-voltage test. The voltage to be used
corresponds to the peak value of the AC voltage required by
the standard.
What to check
How to check
How often
What action?
Contact
protection
cover for
intactness or
damage
Visual inspection At least every
6 months
Repair or
replacement of
device
Device for
damage to
blades and
housing
Visual inspection At least every
6 months
Replacement of
device
Fastening the
cables
Visual inspection At least every
6 months
Fasten
Insulation of
cables for
damage
Visual inspection At least every
6 months
Replace cables
Tightness of
cable gland
Visual inspection At least every
6 months
Retighten,
replace if
damaged
Condensation
drainage holes
for clogging,
where necessary
Visual inspection At least every
6 months
Open holes
Welds for crack
formation
Visual inspection At least every
6 months
Replace device
Abnormal
bearing noise
acoustic
At least every
6 months
Replace device
6.3 Disposal
For ebm-papst, environmental protection and resource preservation are
top priority corporate goals.
ebm-papst operates an environmental management system which is
certified in accordance with ISO 14001 and rigorously implemented
around the world on the basis of German standards.
Right from the development stage, ecological design, technical safety
and health protection are fixed criteria.
The following section contains recommendations for ecological disposal
of the product and its components.
6.3.1 Country-specific legal requirements
NOTE
Country-specific legal requirements
Always observe the applicable country-specific legal
regulations with regard to the disposal of products or waste
occurring in the various phases of the life cycle. The
corresponding disposal standards are also to be heeded.
6.3.2 Disassembly
Disassembly of the product must be performed or supervised by
qualified personnel with the appropriate technical knowledge.
The product is to be disassembled into suitable components for disposal
employing standard procedures for motors.
WARNING
Heavy parts of the product may drop off. Some of the
product components are heavy. These components
could drop off during disassembly.
This can result in fatal or serious injury and material damage.
→ Secure components before unfastening to stop them falling.
Item no. 54566-5-9970 · ENU · Change 205846 · Approved 2020-08-27 · Page 14 / 15
ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · [email protected] · www.ebmpapst.com