background image

Operating instructions

A3GZ50-AK15-35

Translation of the original operating instructions

2. INTENDED USE

The device is exclusively designed as a built-in device for conveying
air according to its technical data.
Any other usage above and beyond this does not conform with the
intended purpose and constitutes misuse of the device.
Customer equipment must be capable of withstanding the mechanical
and thermal stresses that can arise from this product. This applies for the
entire service life of the equipment in which this product is installed.

Intended use also includes

Using the device only in power systems with grounded neutral (TN/
TT power systems).

The device is to be used in networks with network quality
characteristics as per EN 50160.

Using the device only in stationary systems.

Performing all maintenance work.

Conveying air at an ambient air pressure between 800 mbar and
1050 mbar.

Using the device within the permitted ambient temperature range; see
Chapter 3.6 Transport and storage conditions and
Chapter 3.2 Nominal data.

Operating the device with all protective devices.

Following the operating instructions.

Improper use

In particular, operating the device in the following ways is prohibited and
could be hazardous:

Operating the device in an unbalanced state, e.g. due to dirt deposits
or ice formation.

Resonant operation, operation with severe vibration. This also
includes vibration transmitted to the fan from the customer installation.

Operation in medical equipment with a life-sustaining or life-support
function.

Conveying solids in the flow medium.

Painting the device

Connections (e.g. screws) coming loose during operation.

Opening the terminal box during operation.

Conveying air that contains abrasive particles.

Conveying highly corrosive air, e.g. salt spray. Exception: devices
designed for salt spray and correspondingly protected.

Conveying air with high dust content, e.g. suctioning off sawdust.

Operating the device close to flammable materials or components.

Operating the device in an explosive atmosphere.

Using the device as a safety component or to perform safety-related
functions.

Operation with completely or partially disassembled or manipulated
protective devices.

In addition, all applications not listed among the intended uses.

Item no. 54566-5-9970 · ENU · Change 205846 · Approved 2020-08-27 · Page 3 / 15

ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · [email protected] · www.ebmpapst.com

E-mail: [email protected]  

Содержание A3GZ50-AK15-35

Страница 1: ...permitted to install the device to carry out a test run and to perform work on the electrical installation 1 3 Basic safety rules 1 1 3 Basic safety rules The safety hazards associated with the device must be assessed again following installation in the final product The locally applicable industrial safety regulations are always to be observed when working on the device Keep the workplace clean a...

Страница 2: ... wait until all parts have come to a standstill DANGER Ejected parts Missing protective devices may cause balancing weights or broken fan blades to be ejected and cause injuries Take appropriate safety measures WARNING Rotating device Long hair and dangling items of clothing jewelry and the like can become entangled and be pulled into the device Injuries can result Do not wear any loose fitting or...

Страница 3: ...ar operating the device in the following ways is prohibited and could be hazardous Operating the device in an unbalanced state e g due to dirt deposits or ice formation Resonant operation operation with severe vibration This also includes vibration transmitted to the fan from the customer installation Operation in medical equipment with a life sustaining or life support function Conveying solids i...

Страница 4: ...ow A 2 Max clearance for screw 25 mm 3 Cable diameter min 4 mm max 10 mm tightening torque 4 0 6 Nm 4 Tightening torque 3 5 0 5 Nm Item no 54566 5 9970 ENU Change 205846 Approved 2020 08 27 Page 4 15 ebm papst Mulfingen GmbH Co KG Bachmühle 2 D 74673 Mulfingen Phone 49 0 7938 81 0 Fax 49 0 7938 81 110 info1 de ebmpapst com www ebmpapst com E mail zakaz ventilatorry ru ...

Страница 5: ...data is determined using a motor impeller combination in a standardized measurement setup 3 4 Technical description Weight 36 kg Size 1250 mm Motor size 150 Rotor surface Painted black Electronics housing material Die cast aluminum painted black Blade material Die cast aluminum painted black Number of blades 3 Blade pitch 0 Airflow direction A Direction of rotation Counterclockwise viewed toward r...

Страница 6: ... connected to a connection point with a Ssc value that is greater than or equal to 120 times the rated output of the arrangement 4 CONNECTION AND STARTUP 4 1 Mechanical connection CAUTION Cutting and crushing hazard when removing fan from packaging Carefully remove the device from its packaging grasping it by only the blades near the hub Strictly avoid shocks Wear safety shoes and cut resistant sa...

Страница 7: ... connect an additional protective earth conductor by way of the extra protective earth terminal provided on the device The protective earth terminal is located on the housing and provided with a protective earth symbol and a hole 4 2 2 Supply connection and fuses Assignment of supply cable cross sections and their required fuses line protection only no equipment protection Nominal voltage Fuse Aut...

Страница 8: ...livery into the terminal box First connect the PE protective earth Connect the wires to the corresponding terminals Use a screwdriver to do so When connecting ensure that no wire ends fan out Fig 2 Connecting wires to terminals Seal the terminal box 4 3 3 Cable routing Water must be prevented from reaching the cable gland along the cable NOTE Damage caused by moisture penetration Moisture can pene...

Страница 9: ...WM control Fan device address 1 Max PWM 100 Min PWM 5 Save set value to EEPROM Yes Set value requirement Analog linear Direction of action parameter set 1 Positive heating Direction of action parameter set 2 Positive heating Item no 54566 5 9970 ENU Change 205846 Approved 2020 08 27 Page 9 15 ebm papst Mulfingen GmbH Co KG Bachmühle 2 D 74673 Mulfingen Phone 49 0 7938 81 0 Fax 49 0 7938 81 110 inf...

Страница 10: ...over contact common connection contact rating 250 VAC max 2 A AC1 min 10 mA KL2 3 NC Status relay floating status contact break for failure KL 3 1 RSA Bus connection RS485 RSA MODBUS RTU SELV KL 3 2 RSB Bus connection RS485 RSB MODBUS RTU SELV KL 3 3 10 GND Reference ground for control interface SELV KL 3 4 Ain1 U Analog input 1 set value 0 10 V Ri 100 kΩ adjustable curve only usable as alternativ...

Страница 11: ...g the integrated controller s direction of action can be selected via bus or digital input Din3 normal pin open or applied voltage 5 50 VDC inverse bridge to GND or applied voltage 1 VDC SELV KL 3 11 Ain2 U Analog input 2 measured value 0 10 V Ri 100 kΩ adjustable curve only usable as alternative to input Ain2I SELV KL 3 12 20 V Fixed voltage output 20 VDC 20 V 25 10 max 50 mA short circuit proof ...

Страница 12: ...ng off the device for maintenance Switch off the device via the control input Do not switch the motor e g in cyclic operation on and off via power supply Disconnect the device from the power supply When disconnecting be sure to disconnect the ground connection last 5 INTEGRATED PROTECTIVE FEATURES The integrated protective functions cause the motor to switch off automatically in the event of the f...

Страница 13: ...t 25 s and then switch it on again Alternatively reset the error message by applying a control signal of 0 5 V to Din1 or by shorting Din1 to GND In the event of further malfunctions contact ebm papst 6 1 Cleaning To ensure a long service life check the fans regularly for proper operation and soiling The frequency of checking is to be adapted accordingly depending on the degree of soiling DANGER R...

Страница 14: ...ast every 6 months Replacement of device Fastening the cables Visual inspection At least every 6 months Fasten Insulation of cables for damage Visual inspection At least every 6 months Replace cables Tightness of cable gland Visual inspection At least every 6 months Retighten replace if damaged Condensation drainage holes for clogging where necessary Visual inspection At least every 6 months Open ...

Страница 15: ... motors from ebm papst Mulfingen GmbH Co KG Ferrite magnets can be disposed of in the same way as normal iron and steel Electrical insulating materials on the product in cables and wires are made of similar materials and are therefore to be treated in the same manner The materials concerned are as follows Miscellaneous insulators used in the terminal box Power cables Cables for internal wiring Ele...

Отзывы: