
7
CABLE GLANDS MUST
BE TORQUED TO 2.5NM
TO ENSURE CABLE IS
ADEQUATELY SECURED
3
|
Connect mains supply to terminal blocks located on PCB
4
|
Replace access cover and secure with 4x screws. Wiring should be neatly
routed and secured to reduce risk of trapping/ snagging.
Unit Installation
2.0
2
|
Route wiring through cable glands and into the control box.
Touchscreen Controller
Port Allocation 1
Port Allocation 2
Mains Supply (L,N,E)
A
B
C
D
ENSURE THE GROUND LEAD TAIL IS A
MINIMUM OF 25MM LONGER THAN
CONDUCTORS SO THAT CONDUCTOR
WIRES BECOME TAUT BEFORE GROUND
Mains - Live
Mains - Neutral
Mains - Earth
2.5 Electrical Installation
A
B C D
Содержание VA32
Страница 1: ...www ebac com VA32 User Manual...