KF760 Series Rigging Procedures PRELIMINARY DRAFT -- 21 Aug 01
KF760 Series Rigging Procedures PRELIMINARY DRAFT -- 21 Aug 01 Page 26 of 29
3. Connect the bottom KF760 to the pallet at all four corners by lifting the hinges on the pallets Hinge
Tubes into each enclosure Hinge Tube and secure each with a connecting pin. The connecting pins for
this should have been stored in the bottom of the KF760.
4. Check for and remove any hinge locking pins from the rear Hinge Tubes and put aside for loose
storage. Remove the front and rear connecting pins from the hinges
between the fourth and fifth
enclosures
from the bottom. The hinges should drop down into the fourth KF760 s Hinge Tubes.
5. Reinsert the front and rear connecting pins back into the hinge tube holes from which they were
removed.
6. Fly out the array to an appropriate working height for the next step.