KF760 Series Rigging Procedures PRELIMINARY DRAFT -- 21 Aug 01
KF760 Series Rigging Procedures PRELIMINARY DRAFT -- 21 Aug 01 Page 7 of 29
7. Disconnect pallet from the bottom enclosure by removing the four short connecting pins. Insert the
four connecting pins in the bottom enclosure Hinge Tubes.
8. Fly the first four enclosures to an appropriate working height for the next step and push the KF760
pallet aside. Later this will be used as a KF761 rigging aid.
NOTE: When array is flown, the rear enclosure splays will automatically open up to the desired angle.
2.3.2
Second And Subsequent KF760 Pallets
1. Bring in the second pallet of KF760s and position it under the flown array.