The unit is heavy: wear safety shoes and use vacuum lifter preferentially for handling operations.
•
All handling operations will require at least two people (unpacking, lifting, installation in rack
system).
•
Before and after the installation, if the UPS remains de-energized for a long period, the UPS must
be energized for a period of 24 hours, at least once every 6 months (for a normal storage
temperature less than 25°C). This charges the battery, thus avoiding possible irreversible
damage.
•
During the replacement of the Battery Module, it is imperative to use the same type and number
of element as the original Battery Module provided with the UPS to maintain an identical level of
performance and safety. If there are any questions, don’t hesitate to contact your local Eaton
representative.
•
All repairs and service should be performed by AUTHORIZED SERVICE PERSONNEL ONLY.
There are NO USER SERVICEABLE PARTS inside the UPS.
•
For potential safety issue on defective UPS : DISCONNECT INTERNAL BATTERY for storage and
transportation.
Содержание Tripp Lite SmartPro Series
Страница 6: ......
Страница 10: ...x Tripp Lite by Eaton SmartPro Advanced User Guide 614 40195 Rev 01 List of Figures...
Страница 12: ...xii Tripp Lite by Eaton SmartPro Advanced User Guide 614 40195 Rev 01 List of Tables...
Страница 16: ...4 Tripp Lite by Eaton SmartPro Advanced User Guide 614 40195 Rev 01 Introduction...
Страница 28: ...16 Tripp Lite by Eaton SmartPro Advanced User Guide 614 40195 Rev 01 Installation...
Страница 44: ...32 Tripp Lite by Eaton SmartPro Advanced User Guide 614 40195 Rev 01 Operation...
Страница 58: ...614 4019501 614 40195 01...