![background image](http://html1.mh-extra.com/html/eaton/series-nrx/series-nrx_instruction-leaflet_3721027004.webp)
4
Series NRX drawout and breaker
three-way cable interlock installation
and removal instructions
EATON
www.eaton.com
Instructional Leaflet
IL01301060E
Effective June 2016
Figure 6. Step 6.
Step 7e:
Before reattaching the cover, the drive arm window must be
removed from the side of the cover (Figure 7). Either use a utility knife
to cut the window from the cover, or use a punch and a small hammer
to carefully punch out the window. Once the window is removed,
use a small file to remove any burrs that remain. Make certain that all
pieces and/or particles are cleaned up and removed before proceeding.
Figure 7. Step 7.
m
ATTENTION
FIGURE 8 SHOWS THE TYPICAL CABLE ROUTING FOR BOTH TYPES 31 AND
33 INTERLOCKS AND FIGURE 9 SHOWS THE TYPICAL ROUTING FOR TYPE
32 INTERLOCKS. THE CABLE MOUNTING ON THE DRIVE SIDE IS THE SAME
FOR ALL TYPES. MOUNTING FOR THE DRIVEN SIDE OF TYPES 31 AND 33 IS
SHOWN IN FIGURES 14-16. MOUNTING FOR THE DRIVEN SIDE OF TYPE 32 IS
SHOWN IN FIGURES 17-20.
Step 8e:
This step offers cable routing and installation procedures.
Make sure that cables move freely in their cable housings before
installation.
(G)
(H)
Remove drive
arm window
Installation recommendationse:
• 4 inch (102 mm) minimum allowable cable housing bend radius
• Use plastic wire ties/clamps to attach cable housing to structure
after installation and adjustment
• Do not compress cable housing
• Recheck to ensure cables move freely
Figure 8.
Type 31 cable routing
Type 33 cable routing.
Step 8.