80 kVA - 130 kVA UPS
User’s and Installation Manual
1017397
Revision D (update)
11
If the UPS is not immediately installed the following must be remembered:
• The UPS should be stored in the original packing and shipping carton.
• The
recommended
storing temperature is b15°C ... +25°C.
• The equipment must always be protected from dust, moisture and weather.
If the UPS is stored for a longer period of time the batteries of the UPS should be
charged for at least 8 hours every 6 months to maintain the battery condition.
4.1 Unpacking and incoming inspection
Unpack the equipment and remove all the packing materials and shipping cartons.
•
The equipment must be inspected for damage after shipment. If damage has
occurred during transit, all the shipping cartons and packing materials should be
stored for further investigation. If the damage is visible a claim for shipping damage
must be filed immediately. Note: Check the shock/tilt indicator.
To file a claim for shipping damage:
•
The carrier must be informed within 7 days of receipt of the equipment.
Remove the equipment from the pallet according to figure 3 and detailed instructions
on shipping package.
The equipment must be checked against the packing list to verify that the shipment is
complete.
Figure 3.
Fasten the slide to the pallet before unloading the UPS or battery cabinet.
The UPS is thoroughly inspected at the factory. If there are no damages or discrepancies,
the installation may proceed.
4.2 Moving
The UPS units can be moved with fork lift or pallet jack. Because the UPS is heavy, it
should be verified that surfaces on which it is moved are strong enough. Please, note
the center of gravity, see specification.
Removing the UPS, SPM9340 and battery cabinet from a
pallet: