
22
Profile
Installation Manual
PROFILE INSTALLATION MANUAL
Eaton.com/profile
P a g e
|
20
Eaton’s Profile Command Console
Installation Manual
Stabilizing The Core Wall Structure With A Full Depth Upright
Full depth uprights are available in left and right hands (left hand shown). Orient the upright so that the work surface support
flange is towards the center of the core. Insert the hooks on the rear of the upright into the slots in the base core frame and push
down. Tap the top of the upright with a soft mallet to ensure that the hooks are firmly seated. Install three 1/4”-20 x 1/2” hex head
screws into the upright to secure it in place. Adjust the upright’s leveling foot so that it contacts the floor without influencing the
leveling of the core structure.
Stabilizing The Core Wall Structure With A Linear Transition Upright
A linear transition upright assembles to the vertical members of two adjacent base core frames that are joined in a linear
configuration. It supports two adjacent linear work surfaces, one attached to each of the adjacent base core frames.
First assemble the left and right cantilever supports to the transition upright using (4) ¼-20 x ½” Allen head screws and (4) ¼” lock
washers for each support. Then align the transition upright assembly with the holes in the base core frames as shown. Then attach
the upright with (6) 1/4”-20 button head cap screws and (6) ¼-20 nuts. Adjust the upright’s leveling foot so that it contacts the floor
without influencing the leveling of the core structure.
¼-20 x 1/2” Hex head self-tapping
screws (3)
Work surface attachment
flange
Hooks
Slots
¼-20 x 1/2” Allen head screws (6)
¼-20 x 1/2” Allen head
screws and lock washers
(8)
¼-20 Nuts (6)
Figure 17
Figure 18
Figure 19
Figure 20