Eaton PDI WaveStar Infinity 2 Monitoring System Setup and Operation Manual P-164001106—Rev 01
63
77..33
R
Reeppllaacciinngg aa FFaaiilleedd P
Paanneellbbooaarrdd C
CTT
Each panelboard sensor strip has (21) solid-core on-strip CTs and allows dynamic replacement of up to (3) of
these CTs with split-core CTs without powering down the monitored unit.
Figure 46. CT Fix Positions on Panelboard CT Strip
1
2
3
Replacement split-core CTs have the same monitoring accuracy as the on-strip solid-core CTs.
The following procedure to replace a failing panelboard CT is to be performed by Field Service personnel only.
Table 6. Replacing a Failed Panelboard CT – Procedure
Procedure Step
Illustration
1.
Identify the failing CT and panelboard CT strip.
2.
Log in to Infinity Monitoring System.
3.
Select the
Tools
button to bring up
Sensor Board
screen.
3
4
4.
Select the
Menu
button to display Menu Options.
Содержание PDI WaveStar Infinity 2
Страница 1: ...p n P 164001106 Revision 01 Setup and Operation Manual Eaton PDI WaveStar Infinity 2 Monitoring System...
Страница 4: ......
Страница 10: ...x Eaton PDI WaveStar Infinity 2 Monitoring System Setup and Operation Manual P 164001106 Rev 01 List of Tables...
Страница 12: ...2 Eaton PDI WaveStar Infinity 2 Monitoring System Setup and Operation Manual P 164001106 Rev 01 Safety...
Страница 60: ...50 Eaton PDI WaveStar Infinity 2 Monitoring System Setup and Operation Manual P 164001106 Rev 01 Setup...
Страница 76: ...66 Eaton PDI WaveStar Infinity 2 Monitoring System Setup and Operation Manual P 164001106 Rev 01 Maintenance...
Страница 78: ...P 16400110601 P 164001106 01...