Eaton PDI WaveStar Infinity 2 Monitoring System Setup and Operation Manual P-164001106—Rev 01
61
C
Chhaapptteerr 77 M
Maaiinntteennaannccee
Calibrating circuit measurements or replacing a panelboard CT can expose you to live voltages.
Exercise caution and wear personal protective equipment (PPE).
77..11
C
Caalliibbrraattiioonn
The measurement of any input voltage, input current, or current for an individual panel board circuit can be
calibrated. To use calibration screens, the user must be logged in.
Table 4. Calibration Procedure with Calibrate Screen
Calibration Step
Screen or Illustration
1.
Display
Home
screen.
2.
Log in.
3.
Select icon to bring up the
Calibrate
screen.
4.
Select circuit group you wish to calibrate on
Sensor Board
drop-down list.
4
6
5.
Measure circuit value.
6.
Enter correct measurement in ‘Calibrate to:’
field.
7.
On panel boards, you can scroll the circuit
display using
NEXT
or
PREVIOUS
button.
Содержание PDI WaveStar Infinity 2
Страница 1: ...p n P 164001106 Revision 01 Setup and Operation Manual Eaton PDI WaveStar Infinity 2 Monitoring System...
Страница 4: ......
Страница 10: ...x Eaton PDI WaveStar Infinity 2 Monitoring System Setup and Operation Manual P 164001106 Rev 01 List of Tables...
Страница 12: ...2 Eaton PDI WaveStar Infinity 2 Monitoring System Setup and Operation Manual P 164001106 Rev 01 Safety...
Страница 60: ...50 Eaton PDI WaveStar Infinity 2 Monitoring System Setup and Operation Manual P 164001106 Rev 01 Setup...
Страница 76: ...66 Eaton PDI WaveStar Infinity 2 Monitoring System Setup and Operation Manual P 164001106 Rev 01 Maintenance...
Страница 78: ...P 16400110601 P 164001106 01...