Installation
18
09/10 MN05013011Z-EN
Mounting the display/operating unit (front mounting)
X
Drill and punch out two 22.5 mm diameter holes in the
front plate. The diameter is the same as is normally
required for control circuit devices.
Figure 13:
Drill holes for the MFD
h
The protective diaphragm or the protective cover must be
fitted beforehand.
h
Observe the following technical requirements:
• The hole spacing is 30 mm.
• The maximum thickness of the front plate for mounting
the power supply/CPU module must not be more than
6 mm.
• Ensure minimum clearances for the power supply/CPU
module
• In order to ensure protection to IP65, the surface of the
mounting front must be even and smooth.
22.5 mm
(0.89")
30 mm
(1.18")